Skip to main content
PermitBase

Building Permit in Auburn, Washington

Required for construction in Auburn. The city adopts the 2021 editions in its Construction Administrative Code and amends them in separate chapters, with the building code at ACC 15.08A rather than the repealed 15.08.

Reviewed 2026-09-16 · Source

When you need this permit

  • Built to the 2021 International Building Code as adopted by ACC 15.07 and amended by ACC 15.08A
  • Residential work is to the 2021 IRC EXCLUDING Chapter 11 Energy, Chapters 25-33 Plumbing and Chapters 34-43 Electrical
  • Local amendments govern over the published model code text
  • Fire review involves the Valley Regional Fire Authority

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building permit fee
NO PERMIT AMOUNTS ARE STATED HERE FOR AUBURN. Show full citationNO PERMIT AMOUNTS ARE STATED HERE FOR AUBURN. The chapters read for this entry adopt the codes and set out administration; no fee schedule was located in them, and no separate fee chapter was opened. That is a gap in the reading rather than a finding about the city. Ask the City of Auburn on (253) 931-3000.
Not stated in this guide - see notes

Review timeline

Plan review
Not published — contact the department

How long did your Building Permit permit actually take in Auburn?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    Tips

    • Go to ACC 15.08A for the building code - 15.08 is repealed
    • The edition year is in ACC 15.07, not in the building code chapter
    • Check whether your parcel is in King or Pierce County; the city spans both

    Frequently asked questions

    Auburn requires a building permit for: Built to the 2021 International Building Code as adopted by ACC 15.07 and amended by ACC 15.08A; Residential work is to the 2021 IRC EXCLUDING Chapter 11 Energy, Chapters 25-33 Plumbing and Chapters 34-43 Electrical; Local amendments govern over the published model code text; Fire review involves the Valley Regional Fire Authority. If your project isn't listed, confirm with City of Auburn at (253) 931-3000 before starting work.

    In Auburn, the published Building permit fee is: Not stated in this guide - see notes. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Auburn does not publish a plan-review timeline for this permit. Contact City of Auburn at (253) 931-3000 for current turnaround.

    You'll need: Building permit application. See the required-documents checklist on this page for details on each.

    Apply through City of Auburn at 25 W Main St, Auburn, WA 98001. Phone: (253) 931-3000. Official information: https://www.auburnwa.gov/.

    The 2021 editions. The building code chapter (ACC 15.08A.011) does not say so - it adopts the IBC "as adopted in Chapter 15.07 ACC and hereafter amended by the State Building Code Council". Chapter 15.07 is where the year is: "The 2021 International Building Code is adopted by reference". So the edition and the amendments live in different chapters.

    Both. Auburn's own code contemplates review "in the superior court of King or Pierce County", and the federal census place record carries no county at all for exactly this reason. This guide files Auburn under King County because it records one county per city, but that is a representation choice - confirm the county for your specific parcel.

    Sources & verification

    Key facts verified against official sources. Last reviewed 2026-09-16.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Auburn building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    Auburn's permit history isn't searchable here yet

    This page covers what the permit requires. What we don't have for Auburn yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

    Your email, and the place — never an address. We only use it to tell you when Auburn lands. Privacy.

    Other permits in Auburn

    Compare building permit fees across Washington

    Look up this fee in a different city →

    Embed this data card →

    Now live

    Build your Auburn project checklist

    Describe your project once and get every permit, document, and fee it triggers in Auburn — in one checklist. Free, for any city and any number of projects.

    Get started →