Skip to main content
PermitBase

Verify a Contractor Licence in Marysville, Washington

Washington contractors register with the Department of Labor & Industries. Registration is a STATE record; Marysville does not issue it.

Reviewed 2026-09-16 · Source

When you need this permit

  • Check contractor registration with Washington State Labor & Industries Contractor

Required documents

Check off what you have — your progress is saved on this device.

Fee schedule

Building permit fee (valuation-based)
MARYSVILLE PUBLISHES ITS PERMIT FEE TABLE IN THE CODE, AND YOU SHOULD CONFIRM IT BEFORE BUDGETING - FOR TWO REASONS, BOTH FROM THE CITY'S OWN TEXT. Show full citationMARYSVILLE PUBLISHES ITS PERMIT FEE TABLE IN THE CODE, AND YOU SHOULD CONFIRM IT BEFORE BUDGETING - FOR TWO REASONS, BOTH FROM THE CITY'S OWN TEXT. FIRST, THE PRINTED FIGURES ARE NOT THE AMOUNT PAYABLE: the table's note says "Fees are based on February 2023 Building Valuation Data, published by the ICC, including a cost modifier of 1.03 applied each year starting in 2025", so a compounding annual modifier sits on top of what is printed. SECOND, THE TABLE DOES NOT AGREE WITH ITSELF AT TWO BOUNDARIES. A tiered table should be continuous - each bracket's base equalling the previous base plus its rate across the bracket. Four of the six boundaries here are exact to the penny. Two are not: at $2,000 the table computes to $95.75 but the next bracket starts at $69.25, and at $1,000,000 it computes to $5,608.75 but the next bracket starts at $5,680.75. THIS GUIDE DOES NOT ADJUDICATE which figure the city applies - ask Marysville. PLAN REVIEW IS A RATIO AND IS UNAFFECTED: "said plan review fee shall be 65 percent (65%) of the building permit fee", and a plan established as a "basic" plan for repeated use within a subdivision is reviewed at 35 percent.
From $50.00 - see notes for caveats

Review timeline

Plan review
Not published — contact the department

How long did your Verify a Contractor Licence permit actually take in Marysville?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    Tips

    • Contractor registration is a state record in Washington, not a city licence Contractor

    Frequently asked questions

    Marysville requires a verify a contractor licence permit for: Check contractor registration with Washington State Labor & Industries. If your project isn't listed, confirm with City of Marysville at (360) 363-8000 before starting work.

    In Marysville, the published Building permit fee (valuation-based) is: From $50.00 - see notes for caveats. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Marysville does not publish a plan-review timeline for this permit. Contact City of Marysville at (360) 363-8000 for current turnaround.

    Depending on your project, Marysville may also ask for: No city document required. See the required-documents checklist on this page for details on each.

    Apply through City of Marysville at 501 Delta Ave, Marysville, WA 98270. Phone: (360) 363-8000. Official information: https://marysvillewa.gov/.

    Marysville, Washington has adopted: THE 2021 EDITIONS, NAMED, WITH THE COPIES ON FILE. MMC 16.04.010 adopts "Certain documents, copies of which are on file in the office of the building official of the city of Marysville, being marked and designated as the "2021 International Building Code" and the "2021 International Residential Code," and the "2021 International Building Code Standards," published by the International Code Council".; AND FUTURE AMENDMENTS ARRIVE AUTOMATICALLY. MMC 16.04.020: "All amendments or supplements to the 2021 International Building Code and 2021 International Residential Code hereinafter adopted by the International Code Council and by the state of Washington as part of the State Building Code shall become a part of this code in all respects insofar as it is applied and enforced within the jurisdictional boundaries of the city of Marysville." Named edition plus an explicit rolling clause.; THE APPENDIX SECTION CUTS BOTH WAYS IN ONE SENTENCE. MMC 16.04.030: "Appendices AF, AQ and AU of the 2021 International Residential Code, Chapter 11 and Chapters 25 through 43 are not adopted. Appendix E of the 2021 International Building Code is adopted". So the IRC appendices AF, AQ (Tiny Homes) and AU are NOT adopted here - unlike Camas and Yakima, which specifically adopt Appendix Q - and IRC Chapter 11 and Chapters 25 through 43 are out too.; RCW 19.27 - the Washington State Building Code applies statewide.. Local amendments apply — see the Marysville overview page for the full list.

    Sources & verification

    Key facts verified against official sources. Last reviewed 2026-09-16.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Marysville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    Marysville's permit history isn't searchable here yet

    This page covers what the permit requires. What we don't have for Marysville yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

    Your email, and the place — never an address. We only use it to tell you when Marysville lands. Privacy.

    Compare verify a contractor licence fees across Washington

    Look up this fee in a different city →

    Embed this data card →

    Now live

    Build your Marysville project checklist

    Describe your project once and get every permit, document, and fee it triggers in Marysville — in one checklist. Free, for any city and any number of projects.

    Get started →