Roofing permit in Walla Walla, Washington

Permit for reroofing and roof replacement in Walla Walla, priced through a roofing-specific valuation rule at WWMC 15.04.050(A)(2).

Verified 2026-09-16 · Source

When you need this permit

  • ROOFING GETS ITS OWN VALUATION RULE RATHER THAN ITS OWN FEE. WWMC 15.04.050(A)(2) applies to “Garage, single-family, duplex, and all other” roofing-only permits: “Fees shall be calculated in accordance with the schedule provided in subsection (A)(1) of this section; however, valuation shall be calculated as follows: Valuation is based upon number of squares (100 sq. ft.). If removal (tear-off) of existing roof is involved, the valuation amount is $200.00 per square or portion thereof. For roofing over an existing roof, the valuation amount is $100.00 per square or portion thereof.”
  • THE $200.00 AND $100.00 FIGURES ARE VALUATION INPUTS, NOT FEES. They are what the city deems the job to be worth per 100 square feet; the fee is then read off the tiered table in (A)(1). Treating either as the permit price would misstate the charge in both directions depending on roof size.
  • TEARING OFF DOUBLES THE DEEMED VALUATION against roofing over, so the same roof area can fall in different fee tiers depending on method. “Or portion thereof” means partial squares round up.
  • A THREE-TRIGGER EXPIRY, AND ANY ONE OF THEM VOIDS THE PERMIT. WWMC 15.04.005(G): “All permits shall expire by limitation and be declared void if: 1. Work is not started within one hundred eighty days of obtaining a permit, 2. Work is abandoned for one hundred eighty days or more after beginning work, or 3. After two years from the date of permit issuance, regardless of whether the work is finished.” The third is absolute — steady visible progress does not save a permit at two years. This matches the structure Puyallup and Wenatchee publish, and differs from SeaTac, which times a permit by what it builds rather than by whether work is happening.
  • AN APPROVED APPLICATION CAN STILL GO VOID BEFORE YOU HOLD A PERMIT. WWMC 15.04.005(G): “When an applicant has been notified that their permit application has been approved and is ready to purchase, the applicant shall obtain the permit within thirty days of notification or said permit application shall become void.”
  • THE ROLLING CLAUSE IS NOT IN THE ADOPTING SENTENCE — IT IS ITS OWN SECTION, AND A PHRASE-BASED AUDIT WOULD MISS IT. WWMC 15.04.030: “The amendment, addition or repeal of any section of any of the adopted codes, regulations, or statutes shall be deemed to amend this chapter and the codes, regulations, and statutes contained in this chapter are adopted by reference in conformity with the amendment, addition or repeal, and it shall not be necessary for the legislative authority of this city to take any action with respect to such addition, amendment or repeal as provided by RCW 35A.12.140.” MEASURED, NOT ASSUMED: a regular expression for the usual rolling formulations (“as now or hereafter amended”, “as the same exists”, “may hereafter be amended”, “as now in effect”) returns NOTHING across all 75,567 characters of Chapter 15.04. The years are named and the state layer still rolls; the two facts just live in different sections.

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building permit fee (valuation-based)
WWMC 15.04.050(A)(1) publishes the whole schedule in dollars. Show full citationWWMC 15.04.050(A)(1) publishes the whole schedule in dollars. Eight valuation tiers: $0.01–$500.00 is a flat $30.00; then $30.00 plus $3.61 per additional $100 to $2,000; $84.78 plus $16.95 per $1,000 to $25,000; $475.48 plus $12.26 per $1,000 to $50,000; $782.23 plus $8.49 per $1,000 to $100,000; $1,207.69 plus $6.80 per $1,000 to $500,000; $3,929.93 plus $5.77 per $1,000 to $1,000,000; and $6,816.23 plus $4.62 per $1,000 above that. >>> CONTINUITY CONTROL, RUN THIS SESSION AND REPORTED AS MEASURED RATHER THAN AS AN ERROR: 6 of the 7 tier boundaries are discontinuous, and EVERY DIFFERENCE IS POSITIVE — the next tier's published base always sits slightly above what the tier below it computes to. At $2,000 the lower tier yields $84.15 against a published $84.78 (+$0.63); at $25,000, $474.63 against $475.48 (+$0.85); at $50,000, $781.98 against $782.23 (+$0.25); at $100,000, $1,206.73 against $1,207.69 (+$0.96); at $500,000, $3,927.69 against $3,929.93 (+$2.24); at $1,000,000, $6,814.93 against $6,816.23 (+$1.30). Only the $500 boundary is exact. The check was run with a known-continuous control table that correctly reported zero. A one-directional residual is not what arithmetic slips look like, but this entry does not diagnose the cause and the city's published figures govern.
From $30.00, tiered by valuation
Plan review and state surcharge
TWO CHARGES SIT ON TOP OF EVERY PERMIT FEE AND NEITHER IS IN THE TIER TABLE. Show full citationTWO CHARGES SIT ON TOP OF EVERY PERMIT FEE AND NEITHER IS IN THE TIER TABLE. WWMC 15.04.050(A)(5): “plan review fees in the amount of sixty-five percent of the applicable permit fee, plus state surcharges which may apply, shall be due and payable upon filing of permit application.” 15.04.050(A)(6) names the surcharges: $6.50 for building permits, $2.00 “for each additional unit for a building containing more than one residential unit”, and $25.00 for commercial building permits. So the cash due at application is roughly 1.65x the table figure plus a surcharge. WALLA WALLA AND LONGVIEW USE THE SAME PERCENTAGE SHAPE AND ONLY ONE OF THEM IS COMPUTABLE: Longview publishes 65/70/30 percent over a master fee schedule it does not print, while Walla Walla publishes both the percentage AND the base table it applies to.
65% of permit fee, plus surcharge
Hourly and reinspection charges
THE PUBLISHED HOURLY RATE IS A FLOOR, NOT A PRICE. Show full citationTHE PUBLISHED HOURLY RATE IS A FLOOR, NOT A PRICE. WWMC 15.04.050(A)(7) charges $65.00 per hour for inspections outside normal business hours (two-hour minimum), reinspections, inspections for which no fee is specified, and additional plan review caused by changes (half-hour minimum) — but footnote 1 reads “Or the total hourly cost to the city of Walla Walla, whichever is greater. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved.” Quoting $65.00 per hour on its own would understate it. Outside consultants are billed at “Actual costs”, which footnote 2 says “include administrative and overhead costs.”
$65.00/hour or actual cost, if higher
Valuation basis
THE RATE TABLE IS PUBLISHED AND THE VALUATION FEEDING IT IS DELEGATED, WHICH IS THE EXACT INVERSE OF SEATAC. Show full citationTHE RATE TABLE IS PUBLISHED AND THE VALUATION FEEDING IT IS DELEGATED, WHICH IS THE EXACT INVERSE OF SEATAC. WWMC 15.04.005(H): “the city of Walla Walla adopts by reference the most recent building valuation data (BVD) table published by the International Code Council, as amended. Any changes in the BVD table published by the International Code Council shall be deemed to be adopted by the city of Walla Walla without additional amendment to this subsection.” SeaTac publishes the valuation method and withholds the rate; Walla Walla publishes the rate and delegates the valuation input. Both leave a reader one step short of a final number, from opposite directions.
ICC building valuation data table

Review timeline

Plan review
Not published — contact the department

How long did your Roofing permit permit actually take in Walla Walla?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    Tips

    • WORK OUT YOUR SQUARES FIRST, THEN READ THE TABLE. A 20-square roof is deemed to be worth $4,000 if torn off and $2,000 if roofed over, and those land in different places on the tiered schedule. The per-square figures are valuation, not the fee.
    • PARTIAL SQUARES ROUND UP — the rule says “per square or portion thereof”, so 20.2 squares is charged as 21.

    Frequently asked questions

    Walla Walla requires a roofing permit for: ROOFING GETS ITS OWN VALUATION RULE RATHER THAN ITS OWN FEE. WWMC 15.04.050(A)(2) applies to “Garage, single-family, duplex, and all other” roofing-only permits: “Fees shall be calculated in accordance with the schedule provided in subsection (A)(1) of this section; however, valuation shall be calculated as follows: Valuation is based upon number of squares (100 sq. ft.). If removal (tear-off) of existing roof is involved, the valuation amount is $200.00 per square or portion thereof. For roofing over an existing roof, the valuation amount is $100.00 per square or portion thereof.”; THE $200.00 AND $100.00 FIGURES ARE VALUATION INPUTS, NOT FEES. They are what the city deems the job to be worth per 100 square feet; the fee is then read off the tiered table in (A)(1). Treating either as the permit price would misstate the charge in both directions depending on roof size.; TEARING OFF DOUBLES THE DEEMED VALUATION against roofing over, so the same roof area can fall in different fee tiers depending on method. “Or portion thereof” means partial squares round up.; A THREE-TRIGGER EXPIRY, AND ANY ONE OF THEM VOIDS THE PERMIT. WWMC 15.04.005(G): “All permits shall expire by limitation and be declared void if: 1. Work is not started within one hundred eighty days of obtaining a permit, 2. Work is abandoned for one hundred eighty days or more after beginning work, or 3. After two years from the date of permit issuance, regardless of whether the work is finished.” The third is absolute — steady visible progress does not save a permit at two years. This matches the structure Puyallup and Wenatchee publish, and differs from SeaTac, which times a permit by what it builds rather than by whether work is happening.; AN APPROVED APPLICATION CAN STILL GO VOID BEFORE YOU HOLD A PERMIT. WWMC 15.04.005(G): “When an applicant has been notified that their permit application has been approved and is ready to purchase, the applicant shall obtain the permit within thirty days of notification or said permit application shall become void.”; THE ROLLING CLAUSE IS NOT IN THE ADOPTING SENTENCE — IT IS ITS OWN SECTION, AND A PHRASE-BASED AUDIT WOULD MISS IT. WWMC 15.04.030: “The amendment, addition or repeal of any section of any of the adopted codes, regulations, or statutes shall be deemed to amend this chapter and the codes, regulations, and statutes contained in this chapter are adopted by reference in conformity with the amendment, addition or repeal, and it shall not be necessary for the legislative authority of this city to take any action with respect to such addition, amendment or repeal as provided by RCW 35A.12.140.” MEASURED, NOT ASSUMED: a regular expression for the usual rolling formulations (“as now or hereafter amended”, “as the same exists”, “may hereafter be amended”, “as now in effect”) returns NOTHING across all 75,567 characters of Chapter 15.04. The years are named and the state layer still rolls; the two facts just live in different sections.. If your project isn't listed, confirm with City of Walla Walla at (509) 527-4522 before starting work.

    It is computed, not listed. WWMC 15.04.050(A)(2) sets a deemed valuation by roof area — $200.00 per square (100 sq. ft.) where the old roof is torn off, $100.00 per square for roofing over, rounding partial squares up — and that valuation is then run through the ordinary tiered permit fee table in subsection (A)(1). Plan review at 65 percent and any state surcharge are added on top.

    Walla Walla does not publish a plan-review timeline for this permit. Contact City of Walla Walla at (509) 527-4522 for current turnaround.

    You'll need: Building permit application; Project valuation for fee calculation. See the required-documents checklist on this page for details on each.

    Apply through City of Walla Walla at 15 North 3rd Avenue, Walla Walla, WA 99362. Phone: (509) 527-4522. Official information: https://www.wallawallawa.gov/.

    Walla Walla, Washington has adopted: IBC — WWMC 15.04.010: “The 2021 Edition of the International Building Code, published by the International Code Council, Inc., including the following appendices: Appendix A, Employee Qualifications; Appendix E, Supplementary Accessibility Requirements; Appendix F, Rodentproofing; Appendix G, Flood-Resistant Construction; Appendix H, Signs; Appendix I, Patio Covers; Appendix J, Grading; as amended by Chapter 51-50 of the Washington Administrative Code, is hereby adopted by reference and further amended as follows:”; IMC — WWMC 15.04.011: “The 2021 Edition of the International Mechanical Code … except that the standards for liquified petroleum gas installations shall be the 2021 International Fuel Gas Code, and the 2020 Edition of NFPA 58 (Liquefied Petroleum Gas Code) and the 2020 Edition of ANSI Z223.1/NFPA 54 (National Fuel Gas Code), and as amended by Chapter 51-52 of the Washington Administrative Code”.; UPC — WWMC 15.04.012: “The 2021 Edition of the Uniform Plumbing Code, published by the International Association of Plumbing and Mechanical Officials”, with named appendices.; IRC — WWMC 15.04.013: “The 2021 Edition of the International Residential Code, published by the International Code Council, Inc.”, with named appendices.; ADOPTED BY SECTION TITLE BUT NOT OPENED FOR THIS ENTRY, so NO EDITION YEAR IS ASSERTED for any of them: International Green Construction Code (15.04.014), Uniform Code for the Abatement of Dangerous Buildings (15.04.015), International Existing Building Code (15.04.016), International Fire Code (15.04.017), International Energy Conservation Code (15.04.018), International Fuel Gas Code (15.04.019), International Property Maintenance Code (15.04.020), International Swimming Pool and Spa Code (15.04.021) and International Wildland-Urban Interface Code (15.04.022).; NO ELECTRICAL CODE IS ADOPTED ANYWHERE IN TITLE 15. Chapter 15.08 is published as “ELECTRICAL CODE (RESERVED)” and its page carries no sections.. Local amendments apply — see the Walla Walla overview page for the full list.

    Sources & verification

    Verified against official sources. Last reviewed 2026-09-16.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Walla Walla building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    Walla Walla's permit history isn't searchable here yet

    This page covers what the permit requires. What we don't have for Walla Walla yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

    Your email, and the place — never an address. We only use it to tell you when Walla Walla lands. Privacy.