Demolition permit in Walla Walla, Washington
Permit to demolish a building or outbuilding in Walla Walla, priced as a flat fee at WWMC 15.04.050(A)(4).
Verified 2026-09-16 · Source
When you need this permit
- WWMC 15.04.050(A)(4), quoted as published and entirely without dollar signs: “A fifty-seven-dollar permit fee shall apply for demolition of each residential or commercial building. A twenty-six-dollar permit fee shall apply for demolition of each outbuilding.”
- THE FEE IS PER BUILDING, NOT PER SITE — “each residential or commercial building” and “each outbuilding”. A site with a house and two sheds is three fees.
- Walla Walla also adopts the Uniform Code for the Abatement of Dangerous Buildings at WWMC 15.04.015. That section was not opened for this entry and nothing here rests on it, but it is the obvious place to look if the demolition is ordered rather than elective.
- A separate chapter, WWMC 15.36 HOUSE AND STRUCTURE RELOCATION, governs moving a structure rather than demolishing it. It was not opened for this entry.
- A THREE-TRIGGER EXPIRY, AND ANY ONE OF THEM VOIDS THE PERMIT. WWMC 15.04.005(G): “All permits shall expire by limitation and be declared void if: 1. Work is not started within one hundred eighty days of obtaining a permit, 2. Work is abandoned for one hundred eighty days or more after beginning work, or 3. After two years from the date of permit issuance, regardless of whether the work is finished.” The third is absolute — steady visible progress does not save a permit at two years. This matches the structure Puyallup and Wenatchee publish, and differs from SeaTac, which times a permit by what it builds rather than by whether work is happening.
- AN APPROVED APPLICATION CAN STILL GO VOID BEFORE YOU HOLD A PERMIT. WWMC 15.04.005(G): “When an applicant has been notified that their permit application has been approved and is ready to purchase, the applicant shall obtain the permit within thirty days of notification or said permit application shall become void.”
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
WWMC 15.04.050(A)(4). THE CODE PRINTS THESE IN WORDS, NOT DIGITS — “A fifty-seven-dollar permit fee” and “A twenty-six-dollar permit fee” — so a scan for a dollar sign finds no price here at all. Show full citationHide
WWMC 15.04.050(A)(4). THE CODE PRINTS THESE IN WORDS, NOT DIGITS — “A fifty-seven-dollar permit fee” and “A twenty-six-dollar permit fee” — so a scan for a dollar sign finds no price here at all. The figures above are those words rendered in digits, which is a transcription and not a change of meaning. The fee is charged per building. Plan review at 65 percent of the permit fee and any state surcharge may also apply under 15.04.050(A)(5) and (6).TWO CHARGES SIT ON TOP OF EVERY PERMIT FEE AND NEITHER IS IN THE TIER TABLE. Show full citationHide
TWO CHARGES SIT ON TOP OF EVERY PERMIT FEE AND NEITHER IS IN THE TIER TABLE. WWMC 15.04.050(A)(5): “plan review fees in the amount of sixty-five percent of the applicable permit fee, plus state surcharges which may apply, shall be due and payable upon filing of permit application.” 15.04.050(A)(6) names the surcharges: $6.50 for building permits, $2.00 “for each additional unit for a building containing more than one residential unit”, and $25.00 for commercial building permits. So the cash due at application is roughly 1.65x the table figure plus a surcharge. WALLA WALLA AND LONGVIEW USE THE SAME PERCENTAGE SHAPE AND ONLY ONE OF THEM IS COMPUTABLE: Longview publishes 65/70/30 percent over a master fee schedule it does not print, while Walla Walla publishes both the percentage AND the base table it applies to.Review timeline
Inspection process
Tips
- THE DEMOLITION FEES ARE PUBLISHED IN WORDS AND A DOLLAR-SIGN SEARCH WILL NOT FIND THEM. Fifty-seven dollars per residential or commercial building, twenty-six per outbuilding, charged for EACH structure rather than once per site.
- If the demolition follows a dangerous-building determination rather than your own choice, WWMC 15.04.015 adopts the Uniform Code for the Abatement of Dangerous Buildings and a different process may govern. That section was not read for this entry.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-09-16.
Codes & ordinances
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Walla Walla building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Walla Walla's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Walla Walla yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Walla Walla lands. Privacy.
Other permits in Walla Walla
Demolition permit in other cities
Compare demolition permit fees across Washington →
Look up this fee in a different city →
Now live
Build your Walla Walla project checklist
Describe your project once and get every permit, document, and fee it triggers in Walla Walla — in one checklist. Free, for any city and any number of projects.
Get started →