Thatcher building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Thatcher, Arizona.
Verified 2026-07-07 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 3700 W. Main St., PO Box 670, Thatcher, AZ 85552
- Phone
- 928-428-2290
- Office hours
- Monday - Thursday, 7:00 a.m. - 6:00 p.m. (Town Hall 4/10 schedule, closed Fridays). Building Inspector: Mike Payne. All residential and commercial building, addition, remodel, outbuilding, pool, solar, electrical, gas, plumbing, sign, infrastructure, and underground-work permit applications are submitted online through the Town's iWorq Citizen Portal (thatcherpermitting.portal.iworq.net), which requires uploaded PDF plans and contractor licensing documentation; a Site Plan Review Checklist (2 copies, D-size 24"x36") must accompany building plans and the permit application to the Building Inspector.
- Website
- Official site
Inspection sequence
Applies to: Accessory Dwelling Unit (ADU) Permit
- 1
Foundation/Footing
Verifies the ADU's permanent foundation before concrete pour
- 2
Framing
Structural connections, and — for an attached ADU — integration with the primary dwelling per 2015 IRC
- 3
Final
Completed ADU verified against approved plans, size caps, setbacks, and utility-subordination requirements
Applies to: Plumbing Permit
- 1
Underground/Slab
Before concrete pour — verify pipe slope, materials, cleanouts, and the 12-inch minimum sewer depth
- 2
Rough-In
After pipes are installed, before walls are closed
- 3
Final
Fixtures connected, water heater and gas connections verified, no leaks
Applies to: Residential Addition / Remodel Permit
- 1
Foundation/Footing
Required before concrete pour for additions/outbuildings with new footings
- 2
Framing
Structural connections to existing structure
- 3
Final
Completed work verified against approved plans
Applies to: Residential Building Permit (New Construction)
- 1
Foundation/Footing
Before concrete pour, per 2015 IBC/IRC
- 2
Framing
Structural framing, connections, and rough electrical/plumbing/mechanical per 2015 IRC and Town amendments
- 3
Final
Completed work verified against approved plans and Site Plan Review Checklist items (benchmark, elevations, setbacks)
Applies to: Electric Vehicle (EV) Charging Station Permit
- 1
Rough-In
Wiring, box placement, and panel/subpanel connections for the EV charging circuit before walls are closed
- 2
Final
Charger installed, circuit labeled, protections verified per 2014 NEC
Applies to: Electrical Permit
- 1
Rough-In
Wiring, box placement, and panel connections before walls are closed
- 2
Final
Devices installed, panel labeled, protections verified per 2014 NEC
Applies to: Mechanical / HVAC Permit
- 1
Rough-In
Ductwork and equipment placement before walls are closed
- 2
Final
Equipment operational, clearances and dryer-duct fastening method verified per Town amendment
Applies to: Residential/Commercial Solar Photovoltaic (PV) Permit
- 1
Electrical Rough-In / Interconnection
Array wiring, disconnect placement, and conduit before energizing, per the 2014 NEC as adopted by the Town.
- 2
Final
Devices installed, panel labeled, protections verified before permit final and utility interconnection.
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Thatcher building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Thatcher building permits