Accessory Dwelling Unit (ADU) Permit in Thatcher, Arizona
Newly authorized town-wide by Ordinance No. 195-2024 (passed April 2024), allowing attached and/or detached accessory dwelling units on single-family residential lots in Thatcher, subject to size, setback, height, and foundation requirements under Zoning Ordinance Section 13.8.A.
Verified 2026-07-07 · Source
When you need this permit
- In all zoning districts where a single-family dwelling is an allowed use: one attached ADU AND one detached ADU permitted per lot where a primary dwelling exists
- One additional detached ADU permitted on a lot one acre or larger IF at least one ADU on the lot is a restricted-affordable dwelling unit as defined by Arizona Revised Statutes
- The largest ADU on a property is capped at 1,000 sq ft or 75% of the primary dwelling's size, whichever is less; any second/third ADU is capped at 600 sq ft or 50% of the primary dwelling's size, whichever is smaller
- An attached ADU must be architecturally integrated into the primary dwelling's design (must not read as a duplex), though separate entries are allowed
- ADU must be affixed to a permanent foundation and meet all applicable residential building codes — mobile homes and RVs are explicitly NOT acceptable as ADUs
- ADU must always observe the primary dwelling's front-yard and street-side-yard setbacks
- A detached ADU in the required rear yard needs a minimum 10-ft setback from a street-side rear property line and 3-ft setback from an interior rear/side property line; height capped at 18 ft in any required yard and must otherwise meet the zoning district's height rules; may not sit between the primary dwelling and the front property line
- An attached ADU must comply with the same height regulations and setbacks as the primary dwelling
- ADU must comply with applicable lot-coverage requirements (attached garages/porches/shade structures count toward lot coverage but not floor area)
- ADU must be subordinate to the primary single-family dwelling for all addressing and utilities
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation/Footing
Verifies the ADU's permanent foundation before concrete pour
- 2
Framing
Structural connections, and — for an attached ADU — integration with the primary dwelling per 2015 IRC
- 3
Final
Completed ADU verified against approved plans, size caps, setbacks, and utility-subordination requirements
See the full Thatcher inspection guide — scheduling & re-inspection fees →
Tips
- This permit type is very new (Ordinance No. 195-2024, passed April 2024) — as of this review the Town had not published a distinct ADU-specific fee or review-timeline document separate from the standard Building Permit process; the same 0-10 working-day town-sourced figure and resolution-set fee approach documented under the New Construction permit type applies here.
- Manufactured homes, mobile homes, and RVs are explicitly disqualified as ADUs town-wide (Zoning Ordinance § 13.8.B.11) — this is a hard rule, not a case-by-case Zoning Administrator call.
- A restricted-affordable-unit designation (per Arizona statute) is required to unlock the third ADU allowance on 1-acre-plus lots — confirm the exact statutory definition and any application paperwork with the Building Inspector before assuming eligibility.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Thatcher building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Thatcher
Accessory Dwelling Unit (ADU) Permit in other cities
Compare accessory dwelling unit (adu) permit fees across Arizona →
Look up this fee in a different city →
Now live
Build your Thatcher project checklist
Describe your project once and get every permit, document, and fee it triggers in Thatcher — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →