Residential/Commercial Solar Photovoltaic (PV) Permit in Thatcher, Arizona

Required for installation of a rooftop or ground-mounted solar photovoltaic system within Thatcher town limits. The Town's own iWorq Citizen Portal application flow explicitly names 'Solar' as one of its listed permit categories, alongside Electrical, Gas, and Plumbing (thatcherpermitting.portal.iworq.net/THATCHER/new-permit/600/4632) — confirming solar is a genuine, distinct application category rather than folded silently into the general electrical permit. However, consistent with every other permit type in this file, Thatcher has NO fixed, published dollar-figure fee for solar — Code of Ordinances § 150.98 states all fees are set by separate Town Council resolution, and no such resolution document was located online as of this review. Arizona statute A.R.S. § 9-468 independently caps whatever fee is actually charged at the Town's actual cost of issuing the permit.

Verified 2026-07-20 · Source

When you need this permit

  • Solar PV installation requires a permit submitted via the iWorq Citizen Portal's combined 'Solar, Electrical, Gas or Plumbing permit' application (thatcherpermitting.portal.iworq.net/THATCHER/new-permit/600/4632), selecting Solar as the work type
  • Governed by the 2015 IBC/IRC (structural mounting) and 2014 NEC (electrical interconnection) as adopted by the Town — see codesAdopted
  • Per A.R.S. § 9-468(A), the Town may not require a professional engineer's stamp on a standard residential rooftop PV system absent a written, installation-specific finding of necessity
  • Per A.R.S. § 9-468(D)-(F), any fee the Town actually assesses 'shall not exceed the actual cost of issuing the permit,' and the Town must hold a public hearing with at least 15 days' notice before adopting or changing a solar-specific fee
  • Site Plan Review Checklist (2 D-size copies) required with the building plans and permit application, per the same general submittal framework documented in this file's Residential Building Permit entry

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Solar PV Permit FeeTown of Thatcher Code of Ordinances § 150.98 ('Permit fees will be set by a resolution of the Town Council from time to time'). Confirmed gap after exhaustive chase (Code of Ordinances, Document Center, Forms Center, Wayback Machine) — the same gap already documented for every other permit type in this file. A.R.S. § 9-468(D) independently requires that whatever is actually charged for the solar permit not exceed the Town's actual cost of issuing it. Call the Building Inspector (928-428-2290) or use the iWorq portal's live application flow for the current fee.
Set by Town Council resolution — no fixed dollar figure is published in the Code of Ordinances, Zoning Ordinance, or anywhere else on the Town's website as of this review

Review timeline

Plan reviewThatcher’s published plan-review target
0–10 business days

How long did your Residential/Commercial Solar Photovoltaic (PV) Permit permit actually take in Thatcher?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Rough-In / Interconnection

    Array wiring, disconnect placement, and conduit before energizing, per the 2014 NEC as adopted by the Town.

  2. 2

    Final

    Devices installed, panel labeled, protections verified before permit final and utility interconnection.

See the full Thatcher inspection guide — scheduling & re-inspection fees →

Tips

  • Thatcher's iWorq portal explicitly lists 'Solar' as its own selectable work type alongside Electrical, Gas, and Plumbing — a real, distinct application category, even though no distinct dollar fee is published for it.
  • As with every other Thatcher permit type, budget extra lead time to confirm the exact fee directly with the Building Inspector (928-428-2290), since Chapter 150 and the Zoning Ordinance both leave all fees to a Town Council resolution that has not been located published online.
  • Arizona's statewide A.R.S. § 9-468 independently caps whatever the Town actually charges for the solar permit at its actual cost of issuing it, and bars a mandatory PE stamp on a standard residential rooftop system absent written, project-specific justification.

Frequently asked questions

Thatcher requires a residential/commercial solar photovoltaic (pv) permit for: Solar PV installation requires a permit submitted via the iWorq Citizen Portal's combined 'Solar, Electrical, Gas or Plumbing permit' application (thatcherpermitting.portal.iworq.net/THATCHER/new-permit/600/4632), selecting Solar as the work type; Governed by the 2015 IBC/IRC (structural mounting) and 2014 NEC (electrical interconnection) as adopted by the Town — see codesAdopted; Per A.R.S. § 9-468(A), the Town may not require a professional engineer's stamp on a standard residential rooftop PV system absent a written, installation-specific finding of necessity; Per A.R.S. § 9-468(D)-(F), any fee the Town actually assesses 'shall not exceed the actual cost of issuing the permit,' and the Town must hold a public hearing with at least 15 days' notice before adopting or changing a solar-specific fee; Site Plan Review Checklist (2 D-size copies) required with the building plans and permit application, per the same general submittal framework documented in this file's Residential Building Permit entry. If your project isn't listed, confirm with Town of Thatcher Community Development/Engineering (Building Department) — administered jointly with Planning & Zoning under the Office of the Town Manager at 928-428-2290 before starting work.

In Thatcher, the published Solar PV Permit Fee is: Set by Town Council resolution — no fixed dollar figure is published in the Code of Ordinances, Zoning Ordinance, or anywhere else on the Town's website as of this review. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Thatcher's published plan-review target for a residential/commercial solar photovoltaic (pv) permit is 0–10 business days.

You'll need: iWorq Citizen Portal Permit Application (Solar, Electrical, Gas or Plumbing); Site Plan Review Checklist – Single Residence. See the required-documents checklist on this page for details on each.

Thatcher requires 2 inspection(s) for a residential/commercial solar photovoltaic (pv) permit, in order: Electrical Rough-In / Interconnection, Final. Schedule each through Town of Thatcher Community Development/Engineering (Building Department) — administered jointly with Planning & Zoning under the Office of the Town Manager (928-428-2290).

Apply through Town of Thatcher Community Development/Engineering (Building Department) — administered jointly with Planning & Zoning under the Office of the Town Manager at 3700 W. Main St., PO Box 670, Thatcher, AZ 85552. Phone: 928-428-2290, email: mpayne@thatcher.az.gov. Office hours: Monday - Thursday, 7:00 a.m. - 6:00 p.m. (Town Hall 4/10 schedule, closed Fridays). Building Inspector: Mike Payne. All residential and commercial building, addition, remodel, outbuilding, pool, solar, electrical, gas, plumbing, sign, infrastructure, and underground-work permit applications are submitted online through the Town's iWorq Citizen Portal (thatcherpermitting.portal.iworq.net), which requires uploaded PDF plans and contractor licensing documentation; a Site Plan Review Checklist (2 copies, D-size 24"x36") must accompany building plans and the permit application to the Building Inspector.. Official information: https://www.thatcher.az.gov/departments/community-development-engineering.

Thatcher, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Thatcher independently recognizes and administers its own construction codes through the Community Development/Engineering Department (Building Inspector), under Chapter 150 of the Town of Thatcher Code of Ordinances. Source: Town of Thatcher Code of Ordinances, Chapter 150 (amlegal.com/codes/thatcheraz); Town of Thatcher Planning & Zoning page.; International Building Code (IBC), 2015 Edition, as amended, adopted by reference (§ 150.01). Local amendments: automatic fire sprinkler systems required for all new structures (or additions/alterations resulting in) total floor area exceeding 7,500 sq ft; maximum building height of 45 feet from grade to the highest point, or 30 feet from grade to the top of the highest outside wall; § 101.1 retitled 'Building Code of the Town of Thatcher'; § 110.3.7 (Energy Efficiency Inspections) deleted; Table 2304.10.1 amended to add a story-to-story tie fastening schedule item. Source: Town of Thatcher Code of Ordinances § 150.01 (Ord. 157-2009, Ord. 158-2009, Ord. 181-2017).; International Plumbing Code (IPC), 2015 Edition, as amended, adopted by reference (§ 150.02). Amendments: § 101.1 retitled 'Plumbing Code of the Town of Thatcher'; § 903.1 amended to insert '12' (inches). Source: Town of Thatcher Code of Ordinances § 150.02 (Ord. 157-2009, Ord. 158-2009, Ord. 181-2017).; National Electrical Code (NEC), 2014 Edition, published by the National Fire Protection Association, adopted by reference with no local amendments noted in the code text (§ 150.03). Source: Town of Thatcher Code of Ordinances § 150.03 (Ord. 157-2009, Ord. 158-2009, Ord. 181-2017).; International Mechanical Code (IMC), 2015 Edition, as amended, adopted by reference (§ 150.04). Amendments: § 101.1 retitled 'Mechanical Code of the Town of Thatcher'; § 504.8.2 (clothes dryer exhaust ducts) amended to prohibit screws/fasteners extending into the duct. Source: Town of Thatcher Code of Ordinances § 150.04 (Ord. 157-2009, Ord. 158-2009, Ord. 181-2017).; International Fire Code (IFC) and International Fire Code Standards, 2015 Edition, as amended, adopted by reference (§ 150.05), administered by the Building Official acting as Fire Marshal. Amendments: no new building permits for shake/wood shingle roofing except repair/replace of existing shake/shingle roofs or additions under 20% of existing floor area; violation-abatement lien procedure; § 101.1 amended to insert 'Town of Thatcher'. Source: Town of Thatcher Code of Ordinances § 150.05 (Ord. 157-2009, Ord. 158-2009, Ord. 181-2017).; International Residential Code (IRC), 2015 Edition, as amended, adopted by reference (§ 150.06). Amendments: § R101.1 amended to insert 'Town of Thatcher'; § 303.4 (Mechanical Ventilation) deleted; § 309.5, § R313.1, § R313.2 (fire sprinklers) changed from 'shall' to 'may' (i.e., NOT mandatory in Thatcher, unlike many other AZ jurisdictions); Chapter 11 (Energy Efficiency) deleted; § P2603.5.1 (Sewer Depth) revised to a flat 12-inch minimum below grade regardless of freezing conditions; §§ 3902.16 and 3902.17 (Arc-Fault Circuit-Interrupter Protection) deleted. Source: Town of Thatcher Code of Ordinances § 150.06 (Ord. 157-2009, Ord. 158-2009, Ord. 181-2017).; International Fuel Gas Code (IFGC), 2015 Edition, as amended, adopted by reference (§ 150.07). Amendments: § 101.1 retitled 'Fuel Gas Code of the Town of Thatcher'; § 614.8.2 (clothes dryer exhaust ducts) amended identically to the IMC § 504.8.2 amendment. Source: Town of Thatcher Code of Ordinances § 150.07 (Ord. 157-2009, Ord. 158-2009, Ord. 181-2017).; International Existing Building Code (IEBC), 2015 Edition, adopted by reference with no amendments noted (§ 150.08). Source: Town of Thatcher Code of Ordinances § 150.08 (Ord. 157-2009, Ord. 158-2009, Ord. 181-2017).; International Energy Conservation Code (IECC), 2009 Edition — explicitly RESCINDED by the Town ('is hereby rescinded, as it is no longer needed') (§ 150.09), consistent with the Town's deletion of IRC Chapter 11 (Energy Efficiency) and IBC § 110.3.7 (Energy Efficiency Inspections). Thatcher does not appear to enforce a distinct energy code beyond whatever baseline requirements remain embedded in the adopted 2015 IRC/IBC after those chapter deletions. Source: Town of Thatcher Code of Ordinances § 150.09 (Ord. 157-2009, Ord. 158-2009, Ord. 181-2017).; International Property Maintenance Code, 2015 Edition, as amended, adopted by reference (§ 150.10) — the only Chapter 150 code section carved out of the Class 1 misdemeanor penalty provision in § 150.99(B). Source: Town of Thatcher Code of Ordinances § 150.10 (Ord. 167-2011, Ord. 181-2017).; International Private Sewage Disposal Code, 2009 Edition — explicitly RESCINDED ('is hereby rescinded, as it is no longer needed') (§ 150.11). Source: Town of Thatcher Code of Ordinances § 150.11 (Ord. 133-2005, Ord. 181-2017).; International Urban-Wildland Interface Code, 2009 Edition (ICC/IAPMO) — explicitly RESCINDED ('is hereby rescinded, as it is no longer needed') (§ 150.12). Source: Town of Thatcher Code of Ordinances § 150.12 (Ord. 133-2005, Ord. 181-2017).; ICC A117.1-equivalent accessibility standards are incorporated via § 150.13 (effective June 1, 2005, per A.R.S. § 41-1492.03): standards/specifications applicable to public entities and to public accommodations/commercial facilities under Arizona's disability-access statute are incorporated into any building code adopted by the Town, applying to new construction and post-effective-date alterations. Source: Town of Thatcher Code of Ordinances § 150.13 (Ord. 133-2005).; Swimming Pool Safety Code, A.R.S. § 36-1681 (Arizona state statute governing residential swimming pool enclosures/barriers), cross-referenced directly by the Town's Zoning Ordinance § 13.10 rather than a separate local pool-barrier ordinance; where a conflict exists, the Zoning Ordinance states the state statute controls. Source: Town of Thatcher Zoning Ordinance (June 2013, as amended through Ord. 195-2024), Section 13.10.; Manufactured homes, mobile homes, and Recreational Vehicles (RVs) are explicitly barred from use as an accessory building/accessory dwelling unit in any zoning district (Zoning Ordinance § 13.8.B.11); ADUs must be affixed to a permanent foundation and meet all applicable residential building codes — mobile homes and RVs are not acceptable as ADUs (§ 13.8.A.2). Source: Town of Thatcher Zoning Ordinance, Section 13.8.. Local amendments apply — see the Thatcher overview page for the full list.

Yes. The Town's iWorq Citizen Portal explicitly lists 'Solar' as its own selectable work type within the combined Solar/Electrical/Gas/Plumbing permit application. However, no fixed dollar fee for solar is published anywhere — like every other Thatcher permit type, the fee is set by a Town Council resolution that is not published online. Arizona's statewide A.R.S. § 9-468 independently caps whatever fee is actually charged at the Town's actual cost of issuing the permit.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Thatcher building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.