Mobile Home Permit in Duncan, Arizona

A separately fee-scheduled permit for placement of a mobile/manufactured home within the Town of Duncan, distinct from the general Building Permit fee line on the Town's Schedule of Fees and Charges.

Verified 2026-07-06 · Source

When you need this permit

  • Separate Mobile Home Permit fee line applies (distinct from the standard valuation-based Building Permit fee formula)
  • Manufactured/mobile home construction and installation standards themselves are set at the State level (Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing, per A.R.S. Title 41), consistent with statewide practice; the Town's Mobile Home Permit covers local placement/site approval
  • Submitted via the same 'Application for Building Permit and Inspection' form used for general building permits (the form's 'General Description of Proposed Work' does not have a distinct mobile-home checkbox; the Mobile Home Permit is distinguished purely by its separate fee-schedule line item)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Mobile Home PermitTown of Duncan Schedule of Fees and Charges (Fee-Schedule-5.2026.pdf, header-labeled 'PROPOSED'), Planning and Zoning section, Building Permits item A. Flagged for confidence: an earlier (2023) fee schedule revision lists this same line item at $400.00 rather than $50.00 — a substantial change between the two published revisions found. The 5.2026 version is the most recently dated document currently linked from the Town's live site, so its $50.00 figure is used as current, but this is a genuine downward revision worth re-confirming directly with Town Hall given the size of the discrepancy between the two source documents.
$50.00

Review timeline

Plan review
Not published — contact the department

How long did your Mobile Home Permit permit actually take in Duncan?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Building Official Inspection

    Placement, foundation/tie-down, and utility connection verified by the Building Official function (Town Manager's office)

See the full Duncan inspection guide — scheduling & re-inspection fees →

Tips

  • The Mobile Home Permit fee changed materially between the Town's 2023 fee schedule PDF ($400.00) and its current 5.2026 fee schedule PDF ($50.00) — both are genuine Town-published documents, but they disagree by a wide margin, so this figure should be reconfirmed directly with Town Hall (928-359-2791) before relying on it for a specific project.
  • As with the general Building Permit, no review-timeframe figure is published for Mobile Home Permits specifically or for Duncan building permits generally.

Frequently asked questions

Duncan requires a mobile home permit for: Separate Mobile Home Permit fee line applies (distinct from the standard valuation-based Building Permit fee formula); Manufactured/mobile home construction and installation standards themselves are set at the State level (Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing, per A.R.S. Title 41), consistent with statewide practice; the Town's Mobile Home Permit covers local placement/site approval; Submitted via the same 'Application for Building Permit and Inspection' form used for general building permits (the form's 'General Description of Proposed Work' does not have a distinct mobile-home checkbox; the Mobile Home Permit is distinguished purely by its separate fee-schedule line item). If your project isn't listed, confirm with Town of Duncan Town Hall — Building Official (Town Manager's Office) at 928-359-2791 before starting work.

The Town's current (5.2026) Schedule of Fees and Charges lists a $50.00 Mobile Home Permit fee, though a prior 2023 version of the same schedule listed $400.00 for this line item — confirm directly with Town Hall given the size of that discrepancy.

Duncan does not publish a plan-review timeline for this permit. Contact Town of Duncan Town Hall — Building Official (Town Manager's Office) at 928-359-2791 for current turnaround.

You'll need: Application for Building Permit and Inspection. See the required-documents checklist on this page for details on each.

Duncan requires 1 inspection(s) for a mobile home permit, in order: Building Official Inspection. Schedule each through Town of Duncan Town Hall — Building Official (Town Manager's Office) (928-359-2791).

Apply through Town of Duncan Town Hall — Building Official (Town Manager's Office) at 506 SE Old West Highway, P.O. Box 916, Duncan, AZ 85534. Phone: 928-359-2791. Office hours: Monday - Thursday, 8:00 a.m. - 5:30 p.m. (excluding federal holidays); fax 928-359-9146, TTY 800-367-8939. No online permitting portal or email intake address is published — applications are submitted in person or by mail to Town Hall using the paper 'Application for Building Permit and Inspection' form and, where zoning/historic-district/floodplain review also applies, the combined 'Zoning Use, Building, Historic District and Floodplain Permit' form.. Official information: https://duncanaz.us/home/services/building-permits-fees/.

Duncan, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 9 for municipalities). The Town of Duncan is a small incorporated town that runs its own building-permit program directly out of Town Hall (the Town Manager's office functions as Building Official) rather than deferring to Greenlee County; this is confirmed by the Town's own Building Permits & Fees page, its Chapter 7 (Building) town code chapter, its Schedule of Fees and Charges, and its paper 'Application for Building Permit and Inspection' form, all of which are Duncan's own documents (not county documents). Source: Town of Duncan Building Permits & Fees page (duncanaz.us/home/services/building-permits-fees/) and Town of Duncan Town Code Chapter 7 — Building (Rev. 6/06).; 2006 International Building Code (IBC), adopted by reference as the Town's building code (Town Code § 7-1-1, Rev. 6/06). This is the only building-code edition Duncan's published town code identifies by year; the Town has not published any subsequent code-update ordinance superseding the 2006 IBC adoption. Source: Town of Duncan Town Code Chapter 7 — Building, Article 7-1, Section 7-1-1.; 'Adobe Code' adopted by reference as a supplement to the (Uniform) Building Code (Town Code § 7-1-3, Rev. 6/06) — reflecting the region's traditional adobe construction. Source: Town of Duncan Town Code Chapter 7 — Building, Article 7-1, Section 7-1-3.; Uniform Plumbing Code, 'current edition' as published by the International Association of Plumbing and Mechanical Officials (IAPMO), adopted by reference (Town Code Article 7-2, Rev. 6/06). The ordinance text itself does not pin a specific year/edition — it self-updates to whichever edition IAPMO currently publishes, which is a town-code drafting convention rather than a fixed-year adoption. Source: Town of Duncan Town Code Chapter 7 — Building, Article 7-2.; National Electrical Code (NEC), 'current edition' as published by the National Fire Protection Association (NFPA), adopted by reference (Town Code Article 7-3, Rev. 6/06). Same self-updating drafting convention as the plumbing code — no fixed year is specified in the ordinance text. Source: Town of Duncan Town Code Chapter 7 — Building, Article 7-3.; Uniform Mechanical Code, 'current edition' as published by the International Association of Plumbing and Mechanical Officials (IAPMO), adopted by reference (Town Code Article 7-4, Rev. 6/06). Source: Town of Duncan Town Code Chapter 7 — Building, Article 7-4.; Uniform Solar Energy Code and Uniform Sound Transmission Control Code, both adopted by reference as additional codes (Town Code Article 7-5, Rev. 6/06). Source: Town of Duncan Town Code Chapter 7 — Building, Article 7-5.; The Building Official/administrative authority function for all building, plumbing, electrical, and other inspections under Chapter 7 is vested in the office of the Town Manager, who may authorize deputies to perform inspection work (Town Code Article 7-6, Rev. 6/06). Source: Town of Duncan Town Code Chapter 7 — Building, Article 7-6.; Asbestos-containing materials (ACM) in older commercial buildings: any renovation, demolition, or removal of a commercial building must first obtain a Building Permit, contingent on proof of compliance with State/Federal ACM laws, including an asbestos survey and handling/removal by an Arizona State Licensed ACM Contractor, coordination with the Arizona Department of Environmental Quality, and disposal at a State-approved ACM landfill (Town Code Article 7-7, effective 6/11/2001). Source: Town of Duncan Town Code Chapter 7 — Building, Article 7-7.; Floodplain/flood-damage-prevention regulations are adopted separately under Chapter 8 (Rev. 11/05), enacted under authority of A.R.S. § 48-3610, and administered by the Town Manager (or designee) acting as Floodplain Administrator, with the Floodplain Board being either the Flood Control District of Greenlee County or the Duncan Town Council depending on which body is engaged in enforcement at a given time (A.R.S. § 48-3601 definition). A separate Development Permit (the Floodplain Permit line on the combined Zoning/Building/Historic District/Floodplain Permit form) is required before construction or development begins within any area of special flood hazard. Source: Town of Duncan Town Code Chapter 8 — Floodplain Management, Articles 8-1-1, 8-1-7.2.; A separate Historic District permit track exists on the Town's combined permit form ('Zoning Use, Building, Historic District and Floodplain Permit'), implying a locally designated historic district with its own review layer, but no standalone Historic District ordinance chapter or design-guideline document was found published on the Town's website to independently verify its scope or criteria. Source: Town of Duncan Zoning Use, Building, Historic District and Floodplain Permit form (Rev. 4/2006).. Local amendments apply — see the Duncan overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Duncan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.