Floodplain Development Permit (NFIP) in Duncan, Arizona

Required before construction or development begins within any area of special flood hazard in Duncan, per Town Code Chapter 8 (Flood Damage Prevention), enacted under A.R.S. § 48-3610. Administered by the Town Manager (or designee) as Floodplain Administrator, and represented as its own 'Floodplain Permit (NFIP)' line on the Town's combined permit form.

Verified 2026-07-06 · Source

When you need this permit

  • Development Permit required before construction or development begins within any area of special flood hazard (Town Code § 8-1-7.1)
  • Application must include plans in duplicate drawn to scale showing the nature, location, and elevation of the area in question; existing/proposed structures; fill; storage of materials; and drainage facilities
  • Must show proposed elevation (relative to mean sea level) of the lowest floor (including basement) of all structures; in Zone AO, elevation of existing grade and proposed elevation of lowest habitable floor
  • Must show proposed elevation to which any structure will be floodproofed, with certification by a registered professional engineer or architect where floodproofing is used
  • Base flood elevation data required for subdivision proposals or other development greater than 50 lots or 5 acres
  • Description required of the extent to which any watercourse will be altered or relocated as a result of the proposed development
  • The Floodplain Administrator (Town Manager or designee) reviews every permit to confirm ordinance requirements are met, other required state/federal permits have been obtained, the site is reasonably safe from flooding, and the development does not adversely affect (i.e., raise base flood elevation by more than one foot at any point) the floodway's carrying capacity

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Floodplain Permit (NFIP)The combined Zoning Use/Building/Historic District/Floodplain Permit form has a 'Non-refundable fee received by' line under a general 'Fees' section, but the Town's Schedule of Fees and Charges does not list a distinct dollar figure specifically labeled for the Floodplain Permit (NFIP) line, separate from the general Building Permit valuation-based fee. Source: Town of Duncan Zoning Use, Building, Historic District and Floodplain Permit form; Town of Duncan Schedule of Fees and Charges (no distinct Floodplain Permit fee line found).
Non-refundable fee (amount not separately itemized on the Town's published Schedule of Fees and Charges)

Review timeline

Plan review
Not published — contact the department

How long did your Floodplain Development Permit (NFIP) permit actually take in Duncan?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Floodplain Administrator Review

    Confirms compliance with ordinance requirements, other required state/federal permits obtained, site is reasonably safe from flooding, and no adverse effect (>1 ft base flood elevation rise) on floodway carrying capacity

See the full Duncan inspection guide — scheduling & re-inspection fees →

Tips

  • The Floodplain Board for enforcement purposes is either the Flood Control District of Greenlee County or the Duncan Town Council, depending on which body is engaged in enforcement at a given time — this is a joint/shared administrative structure rather than Duncan acting entirely independently of the county on floodplain matters specifically (distinct from the Town's fully independent building-code program).
  • No distinct dollar fee for the Floodplain Permit (NFIP) itself was found on the Town's published fee schedule — only a general non-refundable fee line on the combined permit form. Confirm the exact amount directly with Town Hall.
  • As with all Duncan permit types, no review-timeframe figure is published for floodplain development permit review.

Frequently asked questions

Yes — a Floodplain Development Permit is required before construction or development begins within any area of special flood hazard, reviewed by the Town's Floodplain Administrator (the Town Manager or designee) per Town Code Chapter 8, in addition to any standard Building Permit.

In Duncan, the published Floodplain Permit (NFIP) is: Non-refundable fee (amount not separately itemized on the Town's published Schedule of Fees and Charges). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Duncan does not publish a plan-review timeline for this permit. Contact Town of Duncan Town Hall — Building Official (Town Manager's Office) at 928-359-2791 for current turnaround.

You'll need: Zoning Use, Building, Historic District and Floodplain Permit; Development Permit plan set. See the required-documents checklist on this page for details on each.

Duncan requires 1 inspection(s) for a floodplain development permit (nfip), in order: Floodplain Administrator Review. Schedule each through Town of Duncan Town Hall — Building Official (Town Manager's Office) (928-359-2791).

Apply through Town of Duncan Town Hall — Building Official (Town Manager's Office) at 506 SE Old West Highway, P.O. Box 916, Duncan, AZ 85534. Phone: 928-359-2791. Office hours: Monday - Thursday, 8:00 a.m. - 5:30 p.m. (excluding federal holidays); fax 928-359-9146, TTY 800-367-8939. No online permitting portal or email intake address is published — applications are submitted in person or by mail to Town Hall using the paper 'Application for Building Permit and Inspection' form and, where zoning/historic-district/floodplain review also applies, the combined 'Zoning Use, Building, Historic District and Floodplain Permit' form.. Official information: https://duncanaz.us/home/services/building-permits-fees/.

Duncan, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 9 for municipalities). The Town of Duncan is a small incorporated town that runs its own building-permit program directly out of Town Hall (the Town Manager's office functions as Building Official) rather than deferring to Greenlee County; this is confirmed by the Town's own Building Permits & Fees page, its Chapter 7 (Building) town code chapter, its Schedule of Fees and Charges, and its paper 'Application for Building Permit and Inspection' form, all of which are Duncan's own documents (not county documents). Source: Town of Duncan Building Permits & Fees page (duncanaz.us/home/services/building-permits-fees/) and Town of Duncan Town Code Chapter 7 — Building (Rev. 6/06).; 2006 International Building Code (IBC), adopted by reference as the Town's building code (Town Code § 7-1-1, Rev. 6/06). This is the only building-code edition Duncan's published town code identifies by year; the Town has not published any subsequent code-update ordinance superseding the 2006 IBC adoption. Source: Town of Duncan Town Code Chapter 7 — Building, Article 7-1, Section 7-1-1.; 'Adobe Code' adopted by reference as a supplement to the (Uniform) Building Code (Town Code § 7-1-3, Rev. 6/06) — reflecting the region's traditional adobe construction. Source: Town of Duncan Town Code Chapter 7 — Building, Article 7-1, Section 7-1-3.; Uniform Plumbing Code, 'current edition' as published by the International Association of Plumbing and Mechanical Officials (IAPMO), adopted by reference (Town Code Article 7-2, Rev. 6/06). The ordinance text itself does not pin a specific year/edition — it self-updates to whichever edition IAPMO currently publishes, which is a town-code drafting convention rather than a fixed-year adoption. Source: Town of Duncan Town Code Chapter 7 — Building, Article 7-2.; National Electrical Code (NEC), 'current edition' as published by the National Fire Protection Association (NFPA), adopted by reference (Town Code Article 7-3, Rev. 6/06). Same self-updating drafting convention as the plumbing code — no fixed year is specified in the ordinance text. Source: Town of Duncan Town Code Chapter 7 — Building, Article 7-3.; Uniform Mechanical Code, 'current edition' as published by the International Association of Plumbing and Mechanical Officials (IAPMO), adopted by reference (Town Code Article 7-4, Rev. 6/06). Source: Town of Duncan Town Code Chapter 7 — Building, Article 7-4.; Uniform Solar Energy Code and Uniform Sound Transmission Control Code, both adopted by reference as additional codes (Town Code Article 7-5, Rev. 6/06). Source: Town of Duncan Town Code Chapter 7 — Building, Article 7-5.; The Building Official/administrative authority function for all building, plumbing, electrical, and other inspections under Chapter 7 is vested in the office of the Town Manager, who may authorize deputies to perform inspection work (Town Code Article 7-6, Rev. 6/06). Source: Town of Duncan Town Code Chapter 7 — Building, Article 7-6.; Asbestos-containing materials (ACM) in older commercial buildings: any renovation, demolition, or removal of a commercial building must first obtain a Building Permit, contingent on proof of compliance with State/Federal ACM laws, including an asbestos survey and handling/removal by an Arizona State Licensed ACM Contractor, coordination with the Arizona Department of Environmental Quality, and disposal at a State-approved ACM landfill (Town Code Article 7-7, effective 6/11/2001). Source: Town of Duncan Town Code Chapter 7 — Building, Article 7-7.; Floodplain/flood-damage-prevention regulations are adopted separately under Chapter 8 (Rev. 11/05), enacted under authority of A.R.S. § 48-3610, and administered by the Town Manager (or designee) acting as Floodplain Administrator, with the Floodplain Board being either the Flood Control District of Greenlee County or the Duncan Town Council depending on which body is engaged in enforcement at a given time (A.R.S. § 48-3601 definition). A separate Development Permit (the Floodplain Permit line on the combined Zoning/Building/Historic District/Floodplain Permit form) is required before construction or development begins within any area of special flood hazard. Source: Town of Duncan Town Code Chapter 8 — Floodplain Management, Articles 8-1-1, 8-1-7.2.; A separate Historic District permit track exists on the Town's combined permit form ('Zoning Use, Building, Historic District and Floodplain Permit'), implying a locally designated historic district with its own review layer, but no standalone Historic District ordinance chapter or design-guideline document was found published on the Town's website to independently verify its scope or criteria. Source: Town of Duncan Zoning Use, Building, Historic District and Floodplain Permit form (Rev. 4/2006).. Local amendments apply — see the Duncan overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Duncan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.