EV Charger / EVSE Permit (via General Building Permit) — Duncan, Arizona · Requirements sheet
Verified 2026-07-20 · Source: https://duncanaz.us/home/services/building-permits-fees/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit (via General Building Permit) in Duncan, Arizona
Required for installation of an electric vehicle charging station in Duncan. As with solar PV (see this file's solar-pv-permit entry), the Town of Duncan does not maintain a separate electrical permit at all — its permitTypes are limited to a single general-purpose Building Permit, a Mobile Home Permit, a Zoning Use Permit, and a Floodplain Development Permit. An EV charger circuit or wall-mounted charging unit is therefore filed as a standard Building Permit on the Town's one-page 'Application for Building Permit and Inspection' form (checking 'Alteration' or 'Repair' as appropriate), billed on the Town's standard valuation-based fee formula — there is no distinct EV-charger/EVSE line anywhere in the Town's Schedule of Fees and Charges.
Verified 2026-07-20 · Source
When you need this permit
- Submit a Building Permit application to the Town of Duncan for the EV charger installation — there is no separate electrical permit application, confirmed across every permitType this file documents for Duncan
- Work must conform to the Building, Plumbing, Gas, and Electrical Codes of the Town of Duncan as referenced on the permit application, including the National Electrical Code (adopted as 'current edition,' Town Code Article 7-3)
- Application must state the scope of work, approximate cost/valuation, location/APN, owner, and contractor, using the General Description checkboxes (Construction/Alteration/Repair/Moving/Demolition)
- Approved in person by the Building Official (Town Manager's office); no online submittal portal is published
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Building Official Inspection
Town Code Chapter 7 vests all building, plumbing, electrical, and other inspection authority in the Town Manager's office (or authorized deputies); inspections are scheduled directly with the Building Official as work progresses
See the full Duncan inspection guide — scheduling & re-inspection fees →
Tips
- Duncan has no separate electrical or EV-charger permit — the Town's only construction-related permits are the general Building Permit, Mobile Home Permit, Zoning Use Permit, and Floodplain Development Permit, so an EV charger installation is filed as a standard Building Permit.
- There is no distinct EV-charger/EVSE fee line anywhere in the Town's Schedule of Fees and Charges — the same $30.00 plus $4.11 per $1,000 valuation formula used for any other construction/alteration work applies.
- Because Duncan's adopted electrical code is the National Electrical Code referenced as 'current edition' (Town Code Article 7-3), a standard Level 2 charger installation should meet current NEC EV-charging provisions even though the Town's other codes (e.g., the 2006 IBC) are considerably older.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Duncan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Duncan
EV Charger / EVSE Permit (via General Building Permit) in other cities
Compare ev charger / evse permit (via general building permit) fees across Arizona →
Look up this fee in a different city →