Skip to main content
PermitBase

Floodplain Development Permit in Unincorporated Albany County, Wyoming

Required for any development (including new structures, substantial improvements, or grading) within a FEMA-designated Special Flood Hazard Area in unincorporated Albany County. Issued by the Planning Department under the Albany County Flood Damage Prevention Resolution.

Verified 2026-07-17 · Source

When you need this permit

  • Complete Floodplain Development Application
  • Site plan and building plan certified by a professional engineer or architect if flood-proofing is required
  • Documentation of access and proof of ownership
  • Elevation certification (lowest floor elevation relative to mean sea level) for new/substantially improved structures
  • Narrative description of the project and any watercourse alteration
  • A $200 late fee applies if construction begins before the permit is approved

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Floodplain Development ApplicationConfirmed in both the Albany County Land Use Permit Fee Schedule (approved April 7, 2026) and the Floodplain Development Application's own fee table; an older sentence elsewhere on the same application form cites $350, but the form's authoritative fee table and the current master fee schedule both show $400.
$400.00
Late fee (construction begun prior to approval)
$200.00

Review timeline

Plan reviewTypical estimate — confirm current times with the Unincorporated Albany County building department
~5–20 business days

How long did your Floodplain Development Permit permit actually take in Unincorporated Albany County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Unincorporated Albany County inspection guide — scheduling & re-inspection fees →

    Tips

    • Check the county's Floodplain and APOZ Interactive Web Map (via the Planning Department's Water & Wastewater page) to determine whether your parcel is in a mapped FIRM floodplain before assuming this permit doesn't apply to you.
    • This permit is separate from, and in addition to, the Zoning Certificate.

    Frequently asked questions

    Unincorporated Albany County requires a floodplain development permit for: Complete Floodplain Development Application; Site plan and building plan certified by a professional engineer or architect if flood-proofing is required; Documentation of access and proof of ownership; Elevation certification (lowest floor elevation relative to mean sea level) for new/substantially improved structures; Narrative description of the project and any watercourse alteration; A $200 late fee applies if construction begins before the permit is approved. If your project isn't listed, confirm with Albany County Planning Department at (307) 721-2568 before starting work.

    In Unincorporated Albany County, the published Floodplain Development Application is: $400.00. Additional published fees: Late fee (construction begun prior to approval) — $200.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Plan review for a floodplain development permit in Unincorporated Albany County typically runs 5–20 business days. This is an estimate, not a published figure — confirm current review times with Albany County Planning Department at (307) 721-2568.

    You'll need: Floodplain Development Application. See the required-documents checklist on this page for details on each.

    Apply through Albany County Planning Department at 1002 S 3rd Street, Laramie, WY 82070. Phone: (307) 721-2568, email: planning@albanycountywy.gov. Office hours: Monday–Thursday, 7:30am–5:00pm (business by phone, email, and mail also available; staff may be unavailable during posted hours, call ahead to guarantee availability — per albanycountywy.gov/253/Planning, checked 2026-07-17). Official information: https://www.albanycountywy.gov/253/Planning.

    Unincorporated Albany County, Wyoming has adopted: Albany County has NOT adopted a countywide building code and does NOT issue a general IBC/IRC-style building permit for private construction in unincorporated areas. Under Wyoming's local-option delegation statute (W.S. § 35-9-121), county-level building-code enforcement authority is opt-in via application to the State Fire Marshal; Albany County has not taken that authority, so the State Fire Marshal's Office retains BOTH building and electrical jurisdiction countywide (WSFM 'Local and State Jurisdictions' chart, header reads 'UPDATED 7/7/2026' — corrected 2026-07-17 from a stale '5/11/2026' citation, embedded at https://wsfm.wyo.gov/electrical-safety, lists Albany County BLDG INSP/PR = S and ELEC INSP/PR = S, re-confirmed unchanged 2026-07-17).; The county's OWN site confirms this: Albany County Planning's permit menu and Land Use Permit Fee Schedule (https://www.albanycountywy.gov/253/Planning ; fee schedule PDF https://www.albanycountywy.gov/DocumentCenter/View/6249/Fee-Schedule) contain NO International Building Code / International Residential Code adoption and NO 'building permit' fee line — only zoning, floodplain, wastewater, subdivision, sign, tower, and wind/solar fees. The county's own application labels its zoning approval for new residential/commercial structures 'Zoning Certificate & Rural Address (Building Permit)' — i.e., the county's stand-in for a building permit is a ZONING review against the Albany County Zoning Resolution, not a state building-code plan review/inspection.; The Albany County Zoning Certificate application (https://www.albanycountywy.gov/DocumentCenter/View/4521/Zoning-Certificate-Application) confirms review is 'by the Planning Department' for compliance with 'the Albany County Zoning Resolution' — land-use/setback/use compliance, not IBC/IRC structural or life-safety code compliance.; Practical takeaway: if you are building in unincorporated Albany County, you generally do NOT need a county building permit for the construction itself, but you DO need the county's Zoning Certificate (a land-use/placement approval, sometimes informally called the 'building permit' by the county) plus any of the real exceptions below that apply to your project (floodplain, septic/small wastewater, driveway access, state electrical).. Local amendments apply — see the Unincorporated Albany County overview page for the full list.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-17.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Albany County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.