Small Wastewater Treatment Facility Permit (Septic) — Unincorporated Albany County, Wyoming · Requirements sheet
Verified 2026-07-17 · Source: https://www.albanycountywy.gov/268/Water-Wastewater
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Small Wastewater Treatment Facility Permit (Septic) in Unincorporated Albany County, Wyoming
Required to construct, install, discharge, or modify an on-site (septic) wastewater system in unincorporated Albany County. Issued directly by the Albany County Planning Department (not the state DEQ) under the Albany County Wastewater Regulations; must be installed by a licensed installer, though property owners may install their own system under county guidance.
Verified 2026-07-17 · Source
When you need this permit
- Complete Small Wastewater Treatment Facility application
- Site plan, easements (if applicable), proof of ownership
- Completed percolation test with photos, and exploratory pit inspection/photos
- For engineered (PE-designed) systems: stamped, signed, and dated engineering documentation
- An Authorization to Construct letter must be issued BEFORE construction begins ($200 late fee if construction starts first)
- Post-installation inspection required before backfilling
- If the site is within the Aquifer Protection Overlay Zone (APOZ), the septic field must be designed by a Wyoming-licensed Professional Engineer or Professional Geologist
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Pre-backfill inspection
Planning Department inspects the installed system after installation but before backfilling, to confirm it was built per approved plans and county wastewater regulation standards.
See the full Unincorporated Albany County inspection guide — scheduling & re-inspection fees →
Tips
- Authorization to Construct expires two years from issuance if installation/inspection isn't completed; a renewal may be requested at least 30 days before expiration if plans are unchanged.
- Albany County does NOT permit water wells — those go through the Wyoming State Engineer's Office (307-777-6163), not the county.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-17.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Albany County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Albany County
Compare small wastewater treatment facility permit (septic) fees across Wyoming →
Look up this fee in a different city →