Small Wastewater Treatment Facility Permit (Septic) in Unincorporated Albany County, Wyoming

Required to construct, install, discharge, or modify an on-site (septic) wastewater system in unincorporated Albany County. Issued directly by the Albany County Planning Department (not the state DEQ) under the Albany County Wastewater Regulations; must be installed by a licensed installer, though property owners may install their own system under county guidance.

Verified 2026-07-17 · Source

When you need this permit

  • Complete Small Wastewater Treatment Facility application
  • Site plan, easements (if applicable), proof of ownership
  • Completed percolation test with photos, and exploratory pit inspection/photos
  • For engineered (PE-designed) systems: stamped, signed, and dated engineering documentation
  • An Authorization to Construct letter must be issued BEFORE construction begins ($200 late fee if construction starts first)
  • Post-installation inspection required before backfilling
  • If the site is within the Aquifer Protection Overlay Zone (APOZ), the septic field must be designed by a Wyoming-licensed Professional Engineer or Professional Geologist

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Small Wastewater Treatment Facility Application
$400.00
Late fee (construction begun prior to authorization)
$200.00
Wastewater Installer & Hauler Licensure
$100.00

Review timeline

Plan reviewTypical estimate — confirm current times with the Unincorporated Albany County building department
~5–20 business days

How long did your Small Wastewater Treatment Facility Permit (Septic) permit actually take in Unincorporated Albany County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Pre-backfill inspection

    Planning Department inspects the installed system after installation but before backfilling, to confirm it was built per approved plans and county wastewater regulation standards.

See the full Unincorporated Albany County inspection guide — scheduling & re-inspection fees →

Tips

  • Authorization to Construct expires two years from issuance if installation/inspection isn't completed; a renewal may be requested at least 30 days before expiration if plans are unchanged.
  • Albany County does NOT permit water wells — those go through the Wyoming State Engineer's Office (307-777-6163), not the county.

Frequently asked questions

Unincorporated Albany County requires a small wastewater treatment facility permit (septic) for: Complete Small Wastewater Treatment Facility application; Site plan, easements (if applicable), proof of ownership; Completed percolation test with photos, and exploratory pit inspection/photos; For engineered (PE-designed) systems: stamped, signed, and dated engineering documentation; An Authorization to Construct letter must be issued BEFORE construction begins ($200 late fee if construction starts first); Post-installation inspection required before backfilling; If the site is within the Aquifer Protection Overlay Zone (APOZ), the septic field must be designed by a Wyoming-licensed Professional Engineer or Professional Geologist. If your project isn't listed, confirm with Albany County Planning Department at (307) 721-2568 before starting work.

In Unincorporated Albany County, the published Small Wastewater Treatment Facility Application is: $400.00. Additional published fees: Late fee (construction begun prior to authorization) — $200.00; Wastewater Installer & Hauler Licensure — $100.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a small wastewater treatment facility permit (septic) in Unincorporated Albany County typically runs 5–20 business days. This is an estimate, not a published figure — confirm current review times with Albany County Planning Department at (307) 721-2568.

You'll need: Application for Small Wastewater Treatment Facility. See the required-documents checklist on this page for details on each.

Unincorporated Albany County requires 1 inspection(s) for a small wastewater treatment facility permit (septic), in order: Pre-backfill inspection. Schedule each through Albany County Planning Department ((307) 721-2568).

Apply through Albany County Planning Department at 1002 S 3rd Street, Laramie, WY 82070. Phone: (307) 721-2568, email: planning@albanycountywy.gov. Office hours: Monday–Thursday, 7:30am–5:00pm (business by phone, email, and mail also available; staff may be unavailable during posted hours, call ahead to guarantee availability — per albanycountywy.gov/253/Planning, checked 2026-07-17). Official information: https://www.albanycountywy.gov/253/Planning.

Unincorporated Albany County, Wyoming has adopted: Albany County has NOT adopted a countywide building code and does NOT issue a general IBC/IRC-style building permit for private construction in unincorporated areas. Under Wyoming's local-option delegation statute (W.S. § 35-9-121), county-level building-code enforcement authority is opt-in via application to the State Fire Marshal; Albany County has not taken that authority, so the State Fire Marshal's Office retains BOTH building and electrical jurisdiction countywide (WSFM 'Local and State Jurisdictions' chart, header reads 'UPDATED 7/7/2026' — corrected 2026-07-17 from a stale '5/11/2026' citation, embedded at https://wsfm.wyo.gov/electrical-safety, lists Albany County BLDG INSP/PR = S and ELEC INSP/PR = S, re-confirmed unchanged 2026-07-17).; The county's OWN site confirms this: Albany County Planning's permit menu and Land Use Permit Fee Schedule (https://www.albanycountywy.gov/253/Planning ; fee schedule PDF https://www.albanycountywy.gov/DocumentCenter/View/6249/Fee-Schedule) contain NO International Building Code / International Residential Code adoption and NO 'building permit' fee line — only zoning, floodplain, wastewater, subdivision, sign, tower, and wind/solar fees. The county's own application labels its zoning approval for new residential/commercial structures 'Zoning Certificate & Rural Address (Building Permit)' — i.e., the county's stand-in for a building permit is a ZONING review against the Albany County Zoning Resolution, not a state building-code plan review/inspection.; The Albany County Zoning Certificate application (https://www.albanycountywy.gov/DocumentCenter/View/4521/Zoning-Certificate-Application) confirms review is 'by the Planning Department' for compliance with 'the Albany County Zoning Resolution' — land-use/setback/use compliance, not IBC/IRC structural or life-safety code compliance.; Practical takeaway: if you are building in unincorporated Albany County, you generally do NOT need a county building permit for the construction itself, but you DO need the county's Zoning Certificate (a land-use/placement approval, sometimes informally called the 'building permit' by the county) plus any of the real exceptions below that apply to your project (floodplain, septic/small wastewater, driveway access, state electrical).. Local amendments apply — see the Unincorporated Albany County overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-17.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Albany County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.