Mobile Home Permit in Gunnison, Colorado

Required for mobile/manufactured home placement within City of Gunnison limits, listed as a distinct application on the City's Community Development Applications & Forms page, separate from the general Building Permit Application.

Verified 2026-07-19 · Source

When you need this permit

  • Applies to mobile/manufactured home placement within City of Gunnison limits
  • Property must have adequate public facilities and City utilities in place, per the general Building Permit requirements published on the City's Building & Sign Permits page

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Mobile Home Permit FeeRe-chased 2026-07-19 and confirmed via primary source (not a guess): Municipal Code Chapter 14.10, Section 109.3 'Building Permit Valuations' (added by Ordinance No. 9, Series 2022 § 2; confirmed still current via a real-browser render of ecode360.com/47882243, legislation through 03-24-2026) states: 'Valuation for any factory-built housing or factory-built non-residential unit shall be the actual cost, as those terms are defined in the Colorado Housing Act of 1970, C.R.S 24-32-701, plus the actual cost of the foundation.' Colorado's factory-built-structure statutes (C.R.S. Title 24, Article 32, Part 33, the successor scheme to the 1970 Housing Act provisions cited in the ordinance) define 'manufactured home' to expressly include mobile homes. Section 109.2 routes 'buildings, structures, additions, and/or alterations requiring a permit' generally through the Appendix L fee schedule (same Ordinance No. 9, Series 2022 exhibit; see building-permit permitType) with no separate mobile-home-specific fee schedule adopted anywhere else found — confirming mobile home placement is billed under the general valuation-based Building Permit fee structure, just with a different (actual-cost) valuation input than site-built construction. Source: gunnisonco.gov/departments/city_clerk/ordinance.no9.series2022.pdf.
Same valuation-based fee structure as the general Building Permit (the 'Appendix L' bracket schedule — see the building-permit permitType's 'Base Building Permit Fee' entry), applied to a valuation equal to the actual cost of the manufactured/mobile home plus the actual cost of the foundation — not the ICC Building Valuation Data Table used for site-built construction.

Review timeline

Plan review
Not published — contact the department

How long did your Mobile Home Permit permit actually take in Gunnison?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Gunnison inspection guide — scheduling & re-inspection fees →

    Tips

    • Gunnison County publishes its own separate Manufactured (Mobile) Homes permitting pages, but those apply only to unincorporated county land — for a placement inside City of Gunnison limits, use the City's Mobile Home Permit Application via the City's Building Office, not the County.
    • Mobile/manufactured home placement is billed under the same valuation-based Building Permit ('Appendix L') fee schedule as ordinary construction — per Municipal Code Chapter 14.10 § 109.3, its valuation is the actual cost of the unit plus the actual cost of the foundation, rather than the ICC Building Valuation Data Table rate used for site-built structures.

    Frequently asked questions

    Gunnison requires a mobile home permit for: Applies to mobile/manufactured home placement within City of Gunnison limits; Property must have adequate public facilities and City utilities in place, per the general Building Permit requirements published on the City's Building & Sign Permits page. If your project isn't listed, confirm with City of Gunnison Community Development Department, Building Office at 970.641.8151 before starting work.

    In Gunnison, the published Mobile Home Permit Fee is: Same valuation-based fee structure as the general Building Permit (the 'Appendix L' bracket schedule — see the building-permit permitType's 'Base Building Permit Fee' entry), applied to a valuation equal to the actual cost of the manufactured/mobile home plus the actual cost of the foundation — not the ICC Building Valuation Data Table used for site-built construction.. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Gunnison does not publish a plan-review timeline for this permit. Contact City of Gunnison Community Development Department, Building Office at 970.641.8151 for current turnaround.

    You'll need: Mobile Home Permit Application. See the required-documents checklist on this page for details on each.

    Apply through City of Gunnison Community Development Department, Building Office at City Municipal Building, 201 W. Virginia Ave., PO Box 239, Gunnison, CO 81230. Phone: 970.641.8151, email: building@gunnisonco.gov (Building Office); ejansen@gunnisonco.gov (Eric Jansen, Building Official). Office hours: Building Official: Eric Jansen, 970.641.8151 (fax/cell 970.209.0988). Electrical and plumbing permits/inspections for property within City limits are NOT handled by this office — they are administered directly by the State of Colorado: Local State Electrical Inspector Dustin Behounek, 303.869.3451; Local State Plumbing Inspector Andy Clark, 303.869.3471; state permit portal https://dpo.colorado.gov/EandP/Permits.. Official information: https://www.gunnisonco.gov/departments/building/index.php.

    Gunnison, Colorado has adopted: International Building Code (IBC), 2021 Edition, including Appendix Chapters E, I, J, and the Errata to the IBC, First Printing, October 2020 — adopted by the City of Gunnison Municipal Code, Chapter 14.10 'Building Code of the City of Gunnison' (Ord. 9-2022 § 2), per eCode360 (ecode360.com/47882243).; International Residential Code (IRC), 2021 Edition, including Appendix Chapters AE, AF, AG, AH, AJ, AL, AQ, AR, AS, AT [RE], AU, and the Errata to the IRC, First Printing, January 2021 — adopted by Chapter 14.10, per eCode360.; International Energy Conservation Code (IECC), 2021 Edition, including Appendix Chapter RB, First Printing, September 2021 — adopted as the 'Energy Conservation Code of the City of Gunnison' per City of Gunnison Municipal Code, Title 14, per eCode360 search indexing (ecode360.com/47882242, GU4469 Table of Contents).; International Mechanical Code (IMC), 2021 Edition, including Appendix Chapter A, First Printing, September 2021 — adopted by City of Gunnison Municipal Code, Chapter 14.20 'Mechanical Code', per eCode360 indexing.; A Chapter 14.30 'Fire Code' and Chapter 14.40 'Property Maintenance Code' also exist within Title 14 Technical Codes per the eCode360 Table of Contents (GU4469), but the specific adopted Fire Code edition year was not independently confirmed during this research pass — the full chapter text renders client-side on ecode360.com and could not be retrieved as static text; omitted rather than assumed.; Electrical and plumbing work within City limits is regulated under state-adopted National Electrical Code (NEC) and plumbing code editions and is administered directly by the State of Colorado (Division of Professions and Occupations, Electrical and Plumbing Boards) rather than by a City-adopted Title 14 chapter — per the City's Building & Sign Permits page and Building Department page, which each list a 'Local State Electrical Inspector' and 'Local State Plumbing Inspector' in place of a City electrical/plumbing permitting process.. Local amendments apply — see the Gunnison overview page for the full list.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-19.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gunnison building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    Compare mobile home permit fees across Colorado

    Look up this fee in a different city →

    Embed this data card →