Commercial Building Permit (New Construction, Additions, Remodels & Tenant Improvement) in Gunnison, Colorado

Reviewed under the same City of Gunnison Building Permit that covers all occupancies — the City publishes no separate commercial application, commercial permit type, or tenant-improvement permit. Commercial and multi-family projects are reviewed against the 2021 IBC as adopted and locally amended in Municipal Code Chapter 14.10 (Ordinance No. 9, Series 2022, Section 2), issued directly by the City's own Building Office; Gunnison County has no jurisdiction inside City limits. What differs from residential IRC projects is the fee inputs: a 2.30% Regional Building Valuation Multiplier per square foot versus 1.60% residential, a Plan Review Fee of 65% of the building permit fee versus 30% under the IRC, and a $600 Preliminary Site Development Review pre-application tier for 3+ unit residential and commercial projects versus $300 for 1-2 unit residential — all per the Community Development, Building and Planning Fee Table effective January 1, 2026.

Verified 2026-08-26 · Source

When you need this permit

  • Property must be within City of Gunnison limits — Gunnison County's Building Office states it has no jurisdiction inside any city or town in the county, including Gunnison
  • Reviewed under the 2021 International Building Code, adopted by Municipal Code Chapter 14.10 (Ordinance No. 9, Series 2022, Section 2), including Appendix Chapters E, I, J and the Errata to the IBC, First Printing, October 2020
  • A Preliminary Site Development Review pre-application submittal, at $600.00 per review submittal, applies to 3+ unit residential and commercial projects, per the Community Development, Building and Planning Fee Table effective January 1, 2026
  • Commercial valuation for fee-calculation purposes uses a 2.30% Regional Building Valuation Multiplier per square foot by occupancy type, versus 1.60% for residential, per the same Fee Table
  • Building Permit Plan Review Fee for commercial and multi-family projects is 65% of the building permit fee, versus 30% for other IRC projects, per the same Fee Table
  • Use tax on construction materials is calculated per the City of Gunnison Use Tax Formula — project valuation times 50% times 4% — per the 2021 Permit Fee Schedule Appendix L exhibit to Ordinance No. 9, Series 2022
  • Electrical and plumbing scopes are permitted and inspected separately by the State of Colorado, not the City, consistent with the City's general electrical/plumbing carve-out
  • Fire protection review is provided by the Gunnison Volunteer Fire Department, a City-affiliated department rather than a separate special fire protection district; the City publishes no fire plan-review fee bundled into or itemized alongside the Building Permit fee

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Base Building Permit Fee (valuation-based schedule)
2021 Permit Fee Schedule Appendix L, an exhibit to Ordinance No. Show full citation2021 Permit Fee Schedule Appendix L, an exhibit to Ordinance No. 9, Series 2022, City of Gunnison, adopted 11/08/2022 — same bracket table used for both residential and commercial valuations; gunnisonco.gov/departments/city_clerk/ordinance.no9.series2022.pdf, page bearing the '2021 PERMIT FEE SCHEDULE APPENDIX L' heading.
$1.00-$500.00: $24.00. $501.00-$2,000.00: $24.00 for the first $500 plus $3.00 for each additional $1,000 or fraction thereof. $2,001.00-$40,000.00: $69.00 for the first $2,000 plus $11.00 for each additional $1,000 or fraction thereof. $40,001.00-$100,000.00: $487.00 for the first $40,000 plus $9.00 for each additional $1,000 or fraction thereof. $100,001.00-$500,000.00: $1,027.00 for the first $100,000 plus $7.00 for each additional $1,000 or fraction thereof. $500,001.00-$1,000,000.00: $3,827.00 for the first $500,000 plus $5.00 for each additional $1,000 or fraction thereof. $1,000,001.00-$5,000,000.00: $6,327.00 for the first $1,000,000 plus $3.00 for each additional $1,000 or fraction thereof. $5,000,001.00 and over: $18,327.00 for the first $5,000,000 plus $1.00 for each additional $1,000 or fraction thereof.
Building Permit Plan Review Fee — Commercial and Multi-FamilyCommunity Development, Building and Planning Fee Table, effective January 1, 2026 (Resolution No. 25, Series 2025); gunnisonco.gov/Community Development 01.01.2026 Fee Table.pdf.
65% of building permit fee
Regional Building Valuation Multiplier — CommercialCommunity Development, Building and Planning Fee Table, effective January 1, 2026.
2.30% cost multiplier per sq ft (by occupancy type per building code)
Preliminary Site Development Review (3+ Residential Units and Commercial)
Preapplication admin review fee per submittal review — precedes a commercial Building Permit submittal. Show full citationPreapplication admin review fee per submittal review — precedes a commercial Building Permit submittal. The 1-and-2-unit residential counterpart ('Site Development Review') is $300.00 per submittal review. Community Development, Building and Planning Fee Table, effective January 1, 2026.
$600.00
Use Tax on Construction Materials
'City of Gunnison Use Tax Formula = Valuation of project x 50% x .04 = Use Tax', printed directly on the 2021 Permit Fee Schedule Appendix L exhibit page, Ordinance No. Show full citation'City of Gunnison Use Tax Formula = Valuation of project x 50% x .04 = Use Tax', printed directly on the 2021 Permit Fee Schedule Appendix L exhibit page, Ordinance No. 9, Series 2022, City of Gunnison — the same exhibit as the Base Building Permit Fee bracket table above. This is the applied rate behind the Fee Table's separate 'Use Tax Prepayment Estimate: 50.00% of ICC table or provided valuation' line.
Project valuation x 50% x 4%
Change of Use/Occupancy (up to $5,000 valuation of permit)Community Development, Building and Planning Fee Table, effective January 1, 2026 — applies where a tenant improvement changes the occupancy classification.
$225.00
Change of Use/Occupancy (valuation of improvements over $5,000)Community Development, Building and Planning Fee Table, effective January 1, 2026; the underlying IBC/IRC valuation table dollar figures are not reproduced in the fee table itself.
% per IBC/IRC Table — fee per Title 14
Fire Department Plan ReviewContact the Gunnison Volunteer Fire Department (970-641-8153) for a current fee quote — the Fire Department page publishes no plan-review fee schedule, and no line for it appears on the Community Development, Building and Planning Fee Table.
Not published on the City's website
Engineering/Consultant Support ServicesCommunity Development, Building and Planning Fee Table, effective January 1, 2026 — applies when the City engages outside consultants for plan review or inspection.
15.00% (Actual Cost Plus Overhead %)

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Building Permit (New Construction, Additions, Remodels & Tenant Improvement) permit actually take in Gunnison?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footing/Foundation

    Per the City-adopted 2021 IBC; a City-specific commercial inspection checklist/sequence was not found separately published online.

  2. 2

    Framing

    Structural framing inspection consistent with the adopted 2021 IBC.

  3. 3

    Final

    Final building inspection prior to occupancy; City occupancy is withheld until water, sewer, and electrical utilities are in place and functional. Fire final sign-off, where applicable, is coordinated separately through the Gunnison Volunteer Fire Department.

See the full Gunnison inspection guide — scheduling & re-inspection fees →

Tips

  • Gunnison publishes no separate commercial building permit, commercial application, or tenant-improvement permit — commercial and multi-family projects use the same Building Permit Application as residential work, differing only in fee inputs.
  • Budget for the commercial-specific fee inputs: a 2.30% Regional Building Valuation Multiplier (versus 1.60% residential), a 65% Plan Review Fee (versus 30% for IRC projects), and the $600 Preliminary Site Development Review pre-application tier (versus $300 for 1-2 unit residential).
  • Use tax on construction materials is calculated under the City's own formula — project valuation times 50% times 4% — printed on the 2021 Permit Fee Schedule Appendix L exhibit to Ordinance No. 9, Series 2022.
  • Plan review is performed in-house by the City's own Building Official (Eric Jansen, 970.641.8151) — no third-party firm (e.g. SAFEbuilt, Colorado Code Consulting) administers building review for Gunnison.
  • Fire protection review runs through the Gunnison Volunteer Fire Department (970-641-8153), a City-affiliated department rather than a separate special district — the City publishes no fire plan-review fee alongside the Building Permit fee, so confirm any fire-related charges directly with the Fire Department.

Frequently asked questions

Gunnison requires a commercial building permit (new construction, additions, remodels & tenant improvement) for: Property must be within City of Gunnison limits — Gunnison County's Building Office states it has no jurisdiction inside any city or town in the county, including Gunnison; Reviewed under the 2021 International Building Code, adopted by Municipal Code Chapter 14.10 (Ordinance No. 9, Series 2022, Section 2), including Appendix Chapters E, I, J and the Errata to the IBC, First Printing, October 2020; A Preliminary Site Development Review pre-application submittal, at $600.00 per review submittal, applies to 3+ unit residential and commercial projects, per the Community Development, Building and Planning Fee Table effective January 1, 2026; Commercial valuation for fee-calculation purposes uses a 2.30% Regional Building Valuation Multiplier per square foot by occupancy type, versus 1.60% for residential, per the same Fee Table; Building Permit Plan Review Fee for commercial and multi-family projects is 65% of the building permit fee, versus 30% for other IRC projects, per the same Fee Table; Use tax on construction materials is calculated per the City of Gunnison Use Tax Formula — project valuation times 50% times 4% — per the 2021 Permit Fee Schedule Appendix L exhibit to Ordinance No. 9, Series 2022; Electrical and plumbing scopes are permitted and inspected separately by the State of Colorado, not the City, consistent with the City's general electrical/plumbing carve-out; Fire protection review is provided by the Gunnison Volunteer Fire Department, a City-affiliated department rather than a separate special fire protection district; the City publishes no fire plan-review fee bundled into or itemized alongside the Building Permit fee. If your project isn't listed, confirm with City of Gunnison Community Development Department, Building Office at 970.641.8151 before starting work.

In Gunnison, the published Base Building Permit Fee (valuation-based schedule) is: $1.00-$500.00: $24.00. $501.00-$2,000.00: $24.00 for the first $500 plus $3.00 for each additional $1,000 or fraction thereof. $2,001.00-$40,000.00: $69.00 for the first $2,000 plus $11.00 for each additional $1,000 or fraction thereof. $40,001.00-$100,000.00: $487.00 for the first $40,000 plus $9.00 for each additional $1,000 or fraction thereof. $100,001.00-$500,000.00: $1,027.00 for the first $100,000 plus $7.00 for each additional $1,000 or fraction thereof. $500,001.00-$1,000,000.00: $3,827.00 for the first $500,000 plus $5.00 for each additional $1,000 or fraction thereof. $1,000,001.00-$5,000,000.00: $6,327.00 for the first $1,000,000 plus $3.00 for each additional $1,000 or fraction thereof. $5,000,001.00 and over: $18,327.00 for the first $5,000,000 plus $1.00 for each additional $1,000 or fraction thereof.. Additional published fees: Building Permit Plan Review Fee — Commercial and Multi-Family — 65% of building permit fee; Regional Building Valuation Multiplier — Commercial — 2.30% cost multiplier per sq ft (by occupancy type per building code); Preliminary Site Development Review (3+ Residential Units and Commercial) — $600.00; Use Tax on Construction Materials — Project valuation x 50% x 4%; Change of Use/Occupancy (up to $5,000 valuation of permit) — $225.00; Change of Use/Occupancy (valuation of improvements over $5,000) — % per IBC/IRC Table — fee per Title 14; Fire Department Plan Review — Not published on the City's website; Engineering/Consultant Support Services — 15.00% (Actual Cost Plus Overhead %). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Gunnison does not publish a plan-review timeline for this permit. Contact City of Gunnison Community Development Department, Building Office at 970.641.8151 for current turnaround.

You'll need: Building Permit Application. Depending on your project, Gunnison may also ask for: Do I Need a Building Permit? (guide). See the required-documents checklist on this page for details on each.

Apply through City of Gunnison Community Development Department, Building Office at City Municipal Building, 201 W. Virginia Ave., PO Box 239, Gunnison, CO 81230. Phone: 970.641.8151, email: building@gunnisonco.gov (Building Office); ejansen@gunnisonco.gov (Eric Jansen, Building Official). Office hours: Building Official: Eric Jansen, 970.641.8151 (fax/cell 970.209.0988). Electrical and plumbing permits/inspections for property within City limits are NOT handled by this office — they are administered directly by the State of Colorado: Local State Electrical Inspector Dustin Behounek, 303.869.3451; Local State Plumbing Inspector Andy Clark, 303.869.3471; state permit portal https://dpo.colorado.gov/EandP/Permits.. Official information: https://www.gunnisonco.gov/departments/building/index.php.

No. The same City Building Permit application used for residential construction also covers commercial, multi-family, and tenant-improvement work, reviewed under the 2021 IBC. Commercial projects differ only in fee inputs: a 2.30% valuation multiplier, a 65% Plan Review Fee, and a $600 Preliminary Site Development Review pre-application, versus 1.60%, 30%, and $300 for smaller residential projects, per the Community Development, Building and Planning Fee Table effective January 1, 2026.

Yes. The City of Gunnison's own Use Tax Formula, printed on the 2021 Permit Fee Schedule Appendix L exhibit to Ordinance No. 9, Series 2022, calculates use tax as project valuation times 50% times 4%.

In-house. The City's own Building Official, Eric Jansen, reviews and issues Building Permits directly out of the Community Development Department — no third-party plan-review contractor is identified for Gunnison.

Sources & verification

Verified against official sources. Last reviewed 2026-08-26.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gunnison building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Gunnison.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.