Skip to main content
PermitBase

Sign Permit in Gunnison, Colorado

Required for all signs erected within the City of Gunnison. Signs placed within the public right-of-way additionally require a separate License Agreement with the City. Sign standards are set out in the City's Land Development Code, Section 4.8.

Verified 2026-07-19 · Source

When you need this permit

  • Required for all signs erected within City of Gunnison limits
  • Signs placed in the public right-of-way require a separate Revocable License Agreement with the City, in addition to the Sign Permit
  • Must conform to the Sign Standards in Land Development Code Section 4.8

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Sign PermitApplication admin review fee. Community Development, Building and Planning Fee Table, effective January 1, 2026.
$60.00
License Agreements (Except Sandwich Boards)Application fee, required for signs placed within the public right-of-way in addition to the Sign Permit. Community Development, Building and Planning Fee Table, effective January 1, 2026.
$300.00

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in Gunnison?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Gunnison inspection guide — scheduling & re-inspection fees →

    Tips

    • A sign placed in the public right-of-way needs BOTH a Sign Permit ($60 admin review fee) AND a separate License Agreement ($300 application fee) — budgeting for only one will undercount the total cost.

    Frequently asked questions

    Gunnison requires a sign permit for: Required for all signs erected within City of Gunnison limits; Signs placed in the public right-of-way require a separate Revocable License Agreement with the City, in addition to the Sign Permit; Must conform to the Sign Standards in Land Development Code Section 4.8. If your project isn't listed, confirm with City of Gunnison Community Development Department, Building Office at 970.641.8151 before starting work.

    The Sign Permit application admin review fee is $60.00 per the Community Development, Building and Planning Fee Table effective January 1, 2026. Signs placed within the public right-of-way additionally require a $300.00 License Agreement application fee.

    Gunnison does not publish a plan-review timeline for this permit. Contact City of Gunnison Community Development Department, Building Office at 970.641.8151 for current turnaround.

    You'll need: Sign Permit Application. Depending on your project, Gunnison may also ask for: License Agreement Application for Personal Property or Use. See the required-documents checklist on this page for details on each.

    Apply through City of Gunnison Community Development Department, Building Office at City Municipal Building, 201 W. Virginia Ave., PO Box 239, Gunnison, CO 81230. Phone: 970.641.8151, email: building@gunnisonco.gov (Building Office); ejansen@gunnisonco.gov (Eric Jansen, Building Official). Office hours: Building Official: Eric Jansen, 970.641.8151 (fax/cell 970.209.0988). Electrical and plumbing permits/inspections for property within City limits are NOT handled by this office — they are administered directly by the State of Colorado: Local State Electrical Inspector Dustin Behounek, 303.869.3451; Local State Plumbing Inspector Andy Clark, 303.869.3471; state permit portal https://dpo.colorado.gov/EandP/Permits.. Official information: https://www.gunnisonco.gov/departments/building/index.php.

    Gunnison, Colorado has adopted: International Building Code (IBC), 2021 Edition, including Appendix Chapters E, I, J, and the Errata to the IBC, First Printing, October 2020 — adopted by the City of Gunnison Municipal Code, Chapter 14.10 'Building Code of the City of Gunnison' (Ord. 9-2022 § 2), per eCode360 (ecode360.com/47882243).; International Residential Code (IRC), 2021 Edition, including Appendix Chapters AE, AF, AG, AH, AJ, AL, AQ, AR, AS, AT [RE], AU, and the Errata to the IRC, First Printing, January 2021 — adopted by Chapter 14.10, per eCode360.; International Energy Conservation Code (IECC), 2021 Edition, including Appendix Chapter RB, First Printing, September 2021 — adopted as the 'Energy Conservation Code of the City of Gunnison' per City of Gunnison Municipal Code, Title 14, per eCode360 search indexing (ecode360.com/47882242, GU4469 Table of Contents).; International Mechanical Code (IMC), 2021 Edition, including Appendix Chapter A, First Printing, September 2021 — adopted by City of Gunnison Municipal Code, Chapter 14.20 'Mechanical Code', per eCode360 indexing.; A Chapter 14.30 'Fire Code' and Chapter 14.40 'Property Maintenance Code' also exist within Title 14 Technical Codes per the eCode360 Table of Contents (GU4469), but the specific adopted Fire Code edition year was not independently confirmed during this research pass — the full chapter text renders client-side on ecode360.com and could not be retrieved as static text; omitted rather than assumed.; Electrical and plumbing work within City limits is regulated under state-adopted National Electrical Code (NEC) and plumbing code editions and is administered directly by the State of Colorado (Division of Professions and Occupations, Electrical and Plumbing Boards) rather than by a City-adopted Title 14 chapter — per the City's Building & Sign Permits page and Building Department page, which each list a 'Local State Electrical Inspector' and 'Local State Plumbing Inspector' in place of a City electrical/plumbing permitting process.. Local amendments apply — see the Gunnison overview page for the full list.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-19.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gunnison building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.