Gunnison building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Gunnison, Colorado.
Verified 2026-07-19 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- City Municipal Building, 201 W. Virginia Ave., PO Box 239, Gunnison, CO 81230
- Phone
- 970.641.8151
- building@gunnisonco.gov (Building Office); ejansen@gunnisonco.gov (Eric Jansen, Building Official)
- Office hours
- Building Official: Eric Jansen, 970.641.8151 (fax/cell 970.209.0988). Electrical and plumbing permits/inspections for property within City limits are NOT handled by this office — they are administered directly by the State of Colorado: Local State Electrical Inspector Dustin Behounek, 303.869.3451; Local State Plumbing Inspector Andy Clark, 303.869.3471; state permit portal https://dpo.colorado.gov/EandP/Permits.
- Website
- Official site
Published scheduling rules
- Do not contact the City of Gunnison Building Office to schedule an EV charger electrical inspection -- electrical work within City limits is administered entirely by the State of Colorado (Local State Electrical Inspector Dustin Behounek, 303.869.3451). (EV Charger / Electric Vehicle Charging Station Permit)
Inspection sequence
Applies to: Building Permit
- 1
Footing/Foundation
Per the City-adopted 2021 IBC/IRC; a City-specific inspection checklist/sequence was not found separately published online as of 2026-07-19.
- 2
Framing
Structural framing inspection consistent with the adopted 2021 IBC/IRC.
- 3
Final
Final building inspection prior to occupancy; City occupancy is withheld until water, sewer, and electrical utilities are in place and functional.
Applies to: Solar Photovoltaic (PV) Permit
- 1
State Electrical Inspection (interconnection)
Performed by a State of Colorado electrical inspector; required before the system's electrical connection can be energized, since Gunnison does not administer its own electrical permitting
- 2
Final Inspection
Racking/roof-penetration attachment and structural compliance verified by the City Building Office
Final inspection only: EV Charger / Electric Vehicle Charging Station Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gunnison building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Gunnison building permits
Get alerts for Gunnison
We'll email you when Gunnison's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.