Gunnison building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Gunnison, Colorado.
Verified 2026-07-19 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- City Municipal Building, 201 W. Virginia Ave., PO Box 239, Gunnison, CO 81230
- Phone
- 970.641.8151
- building@gunnisonco.gov (Building Office); ejansen@gunnisonco.gov (Eric Jansen, Building Official)
- Office hours
- Building Official: Eric Jansen, 970.641.8151 (fax/cell 970.209.0988). Electrical and plumbing permits/inspections for property within City limits are NOT handled by this office — they are administered directly by the State of Colorado: Local State Electrical Inspector Dustin Behounek, 303.869.3451; Local State Plumbing Inspector Andy Clark, 303.869.3471; state permit portal https://dpo.colorado.gov/EandP/Permits.
- Website
- Official site
Published scheduling rules
- Do not contact the City of Gunnison Building Office to schedule an EV charger electrical inspection -- electrical work within City limits is administered entirely by the State of Colorado (Local State Electrical Inspector Dustin Behounek, 303.869.3451). (EV Charger / Electric Vehicle Charging Station Permit)
Inspection sequence
Applies to: Building Permit
- 1
Footing/Foundation
Per the City-adopted 2021 IBC/IRC; a City-specific inspection checklist/sequence was not found separately published online as of 2026-07-19.
- 2
Framing
Structural framing inspection consistent with the adopted 2021 IBC/IRC.
- 3
Final
Final building inspection prior to occupancy; City occupancy is withheld until water, sewer, and electrical utilities are in place and functional.
Applies to: Commercial Building Permit (New Construction, Additions, Remodels & Tenant Improvement)
- 1
Footing/Foundation
Per the City-adopted 2021 IBC; a City-specific commercial inspection checklist/sequence was not found separately published online.
- 2
Framing
Structural framing inspection consistent with the adopted 2021 IBC.
- 3
Final
Final building inspection prior to occupancy; City occupancy is withheld until water, sewer, and electrical utilities are in place and functional. Fire final sign-off, where applicable, is coordinated separately through the Gunnison Volunteer Fire Department.
Applies to: Solar Photovoltaic (PV) Permit
- 1
State Electrical Inspection (interconnection)
Performed by a State of Colorado electrical inspector; required before the system's electrical connection can be energized, since Gunnison does not administer its own electrical permitting
- 2
Final Inspection
Racking/roof-penetration attachment and structural compliance verified by the City Building Office
Final inspection only: Change of Use / Change of Occupancy, EV Charger / Electric Vehicle Charging Station Permit
Re-inspection fees
Mechanical Permit Fee · Found in the same Ordinance No. Show full citationHide
Mechanical Permit Fee · Found in the same Ordinance No. 9, Series 2022 exhibit as the Building Permit 'Appendix L' table (see building-permit permitType) — a 'MECHANICAL/FUEL GAS CODE FEE SCHEDULE' table attached to Chapter 14.10's International Mechanical Code Section 109.2, which reads: 'The fees for mechanical work shall be as set forth in the Mechanical/Fuel Gas Code fee schedule, attached hereto.' Source: Ordinance No. 9, Series 2022, City of Gunnison, adopted 11/08/2022, at gunnisonco.gov/departments/city_clerk/ordinance.no9.series2022.pdf (linked from the City Clerk Ordinances page). This schedule is not reproduced in the Jan. 1, 2026 Community Development Fee Table PDF or the citywide Resolution No. 3, Series 2026 fee schedule (both re-checked in full 2026-07-19, 2 and 10 pages respectively) — those cover only Community Development/Building & Planning line items, not the Mechanical/Fuel Gas-specific table, which remains governed by this still-current (unamended, per ecode360's 'legislation through 03-24-2026' notice) 2022 ordinance exhibit. This SUPERSEDES the previously-flagged 'Example SFR Building Valuation Worksheet' (revised 08/2019) as the correct current source — that worksheet was a staff-created illustrative estimate, not the actual adopted fee ordinance, though its rates were in the same ballpark.Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fee schedules
Applications & forms
Online permit portal
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gunnison building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Gunnison building permits
Get alerts for Gunnison
We'll email you when Gunnison's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.