Inspection sequence, scheduling, and re-inspection fees for building permits in Quartzsite, Arizona.

Verified 2026-07-07 · Source

How to schedule

Inspections are requested through the building department below.

Address
465 N. Plymouth Ave. / PO Box 2812, Quartzsite, AZ 85346
Phone
928-927-4333 ext. 601
Office hours
Monday - Thursday, 7:00 a.m. - 6:00 p.m. (closed Fridays); Fax 928-927-4400. All building, electrical, plumbing, mechanical, demolition, grading, sign, and manufactured/mobile home permit applications are submitted through the Town's iWorq Citizen Portal (quartzsite.portal.iworq.net/portalhome/quartzsite) — there is no separate PDF/paper Building Permit Application form published outside the portal. The portal's own instructions direct applicants to 'submit the application and wait for the City to contact you,' with no stated numeric response time.

Inspection sequence

Applies to: Plumbing Permit

  1. 1

    Underground/Slab

    Before concrete pour — verify pipe slope, materials, cleanouts

  2. 2

    Rough-In

    After pipes installed, before walls closed

  3. 3

    Final

    Fixtures connected, no leaks, grease-trap/interceptor compliance verified where applicable

Applies to: Residential Addition / Remodel / Accessory Structure Permit

  1. 1

    Foundation/Footing

    Required before concrete pour for additions/accessory structures over the 120 sq ft threshold

  2. 2

    Framing

    Structural connections to existing structure or new accessory-structure framing

  3. 3

    Final

    Completed work verified against approved plans

Applies to: Residential Building Permit (New Construction)

  1. 1

    Foundation/Footing

    Required before concrete pour, per the 2018 IRC/IBC as adopted by the Town

  2. 2

    Framing

    Structural framing, connections, and egress per 2018 IRC as adopted by the Town

  3. 3

    Final

    Completed work verified against approved plans prior to Certificate of Occupancy

Applies to: Electrical Permit

  1. 1

    Rough-In

    Wiring, box placement, and panel connections before walls are closed

  2. 2

    Final

    Devices installed and panel labeled, per 2017 NEC as adopted by the Town

Applies to: Grading Permit

  1. 1

    Rough Grading

    Verifies cut/fill slopes and drainage prior to final grading, per IBC Appendix J as adopted by the Town

  2. 2

    Final

    Final grading and drainage verified against approved plan

Applies to: Manufactured Home / Mobile Home / Park Model / Office Trailer Installation Permit

  1. 1

    Foundation/Tie-Down

    Verifies hold-down anchors and foundation/blocking before utility connection

  2. 2

    Final

    Utility connections, skirting, and site improvements verified

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In

    Ductwork and equipment placement before walls closed

  2. 2

    Final

    Equipment operational, clearances and combustion air verified

Applies to: Solar PV Permit

  1. 1

    Rough-In

    Structural mounting and electrical wiring/box placement before covering or energizing

  2. 2

    Final

    Completed installation verified against approved plans and the 2017 NEC as adopted by the Town

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Quartzsite building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Quartzsite building permits

Get alerts for Quartzsite

We'll email you when Quartzsite's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.