Residential Building Permit (New Construction) — Quartzsite, Arizona · Requirements sheet
Verified 2026-07-07 · Source: https://www.ci.quartzsite.az.us/government/departments/community_development/index.php
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit (New Construction) in Quartzsite, Arizona
Required for new single-family and two-family residential construction in the Town of Quartzsite. Reviewed against the 2018 IRC as adopted and amended by the Town. Applications are submitted exclusively through the Town's iWorq Citizen Portal.
Verified 2026-07-07 · Source
When you need this permit
- Building permit required for new single-family and two-family dwelling construction within Quartzsite town limits (exempt only if 120 sq ft or less and otherwise exempted under Chapter 150)
- Plans must comply with the 2018 IRC (Appendices G, H, P, Q) as adopted by the Town, plus the Chapter 150 uniform amendments (§ 150.03): jurisdiction name insertion, Fire Code cross-reference, Building Safety Division as enforcement agency, Flood Damage Prevention ordinance cross-reference for flood hazard areas/design flood elevations
- Submittal via the Town's iWorq Citizen Portal (quartzsite.portal.iworq.net/portalhome/quartzsite) — no separate paper/PDF application form is published outside the portal
- Building Safety Division reviews submitted documents prior to determining the building permit fee, which may take up to 24 hours to calculate, per the Development Procedures Handbook (Ord. 23-05)
- Building plans are reviewed by Town Staff or referred to a third-party plan review consultant if necessary; a separate agreement between the applicant and the third-party consultant is required in that case
- Building Permit Fee is calculated dynamically through iWorq per Table 1-A of the currently adopted International Building Code (ICC Building Valuation Data updated annually per Resolution 19-15) — no static town-published dollar table exists
- Work commencing before permit issuance triggers an investigation fee (minimum $50.00, maximum up to the Table 1-A permit fee amount) in addition to the permit fee, per § 150.03(B)(6)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation/Footing
Required before concrete pour, per the 2018 IRC/IBC as adopted by the Town
- 2
Framing
Structural framing, connections, and egress per 2018 IRC as adopted by the Town
- 3
Final
Completed work verified against approved plans prior to Certificate of Occupancy
See the full Quartzsite inspection guide — scheduling & re-inspection fees →
Tips
- CONFIRMED GAP, not an assumption: no numeric review-timeframe (business/calendar/working days) for the Building Permit application/plan-review process is published anywhere by the Town of Quartzsite. Chased exhaustively across: Town Code § 150.02 (silent on timing); § 150.03 (uniform Chapter 150 amendments, silent on timing); the Development Procedures Handbook (Ord. 23-05, Article II Section 2, states only that fee determination 'may take up to 24 hours' and plans are reviewed by Town Staff or a third-party consultant 'if necessary' — no day-count given for that review itself); the Schedule of Fees - Rates (2024) PDF (text-extracted, 630 lines, no timeframe language); and the iWorq Citizen Portal's own Building Permit Application landing page (states only 'submit the application and wait for the City to contact you'). A.R.S. § 9-835 requires municipalities to publish their own administrative-completeness and substantive-review time frames but supplies no statutory default figure when a municipality has not done so; § 9-835(O) merely exempts sub-7-working-day licenses from the full dual-timeframe posting requirement and is not itself an issuance deadline. No separate enacted Arizona statute mandating a fixed single-family-dwelling permit-issuance deadline could be verified (a purported 'single-family 7-day' provision surfaced only in preliminary web-search AI summaries, not in the actual enacted text of A.R.S. Title 9 §§ 831-843 checked directly against azleg.gov; a candidate section number returned HTTP 404). Applicants should contact the Building Safety Division directly (928-927-4333 ext. 601) for a current informal processing estimate.
- Because Quartzsite is a small, seasonal RV/gem-show town, actual in-practice turnaround may vary significantly with the Town's winter (October-March) tourist-season staffing and application volume versus its quieter summer months — this seasonal variation is not itself published or quantified anywhere in Town materials.
- The 120-sq-ft permit-exemption threshold (§ 150.02) is smaller than several other Arizona jurisdictions in this dataset (e.g., Buckeye's 200 sq ft) — verify carefully before assuming a larger accessory structure is exempt.
- All permit types (Building, Electrical, Plumbing, Mechanical) are submitted through the single iWorq Citizen Portal 'Building Permit Application' — there is no separate portal workflow per trade beyond selecting scope within the application itself.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Quartzsite building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Quartzsite
Residential Building Permit (New Construction) in other cities
Compare residential building permit (new construction) fees across Arizona →
Look up this fee in a different city →