Sign Permit — Phoenix, Arizona · Requirements sheet
Verified 2026-08-15 · Source: https://www.phoenix.gov/administration/departments/pdd/commercial-multifamily-building/commercial-plan-reviews-permits/signs.html
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Sign Permit in Phoenix, Arizona
Required before any sign is erected, displayed, relocated, or altered in Phoenix. The Phoenix Zoning Ordinance, Chapter 7, Section 705 (Signs) states that, unless otherwise provided in that section, all signs shall require a sign permit from the Planning and Development Department (PDD). Sign permits are administered by PDD's Sign Section and are billed in two parts: a Sign Plan Review fee (hourly, with a stated minimum) and a Sign Permit fee (a flat per-sign amount that covers the initial inspection). Fees are set by Phoenix City Code Chapter 9, Appendix A.2 (PDD Fee Schedule adopted per Ordinance G-7465, effective January 20, 2026).
Verified 2026-08-15 · Source
When you need this permit
- Phoenix Zoning Ordinance Section 705(B)(1) — 'Unless otherwise provided in this section, all signs shall require a sign permit from the Planning and Development Department before being erected, displayed, relocated or altered.'
- Written approval from Planning and Development Department personnel is required before any change, modification, alteration, or other deviation from the terms and conditions of an issued sign permit, and before any change in the use of the sign as originally permitted (Phoenix Zoning Ordinance Section 705)
- Applications may be filed by the owner, tenant, or lessee of the property on which the sign is located, or an authorized agent or contractor (Phoenix Zoning Ordinance Section 705, 'Qualifications to apply for a permit')
- Submit one application plus three copies of all attachments to PDD, 200 West Washington Street, 2nd Floor; multiple copies are not required when submitting through the Electronic Plan Review (EPR) system (Sign Permit Submittal Checklist, TRT 00298)
- Ground sign submittals must show the shortest distance from the leading edge of the sign to the property line and to any driveway, nearby utilities, sign height from adjacent street grade, the sight-distance triangle at any street or driveway intersection, the property's linear frontage, and — if using an existing structure — the prior building and/or sign permit number(s)
- Wall sign submittals must show the length of the elevation or tenant space where the sign will be placed, an elevation view indicating sign location, the distance from the top of roof and side of building, height to top of sign from grade, and building height (all heights if the roofline varies)
- Sign face/structure details must show height and length of the sign structure (individual letters enclosed within the smallest regular geometric figure), height and length of all wording with horizontal spacing and insignia, colors and materials of the structure and background, and must predominantly display the business name with uniform leading letter height
- Multi-tenant complexes must consult the site's Comprehensive Sign Plan for type, color, and style regulations; an approved site plan is required, plus a floor plan for the tenant space in a multiple-tenant building and an installation detail/section drawing of the sign
- A completed, signed Sign Permit Submittal Checklist certification must be attached to the plans at first review; PDD returns plans without formal review if checklist items are not addressed
- Billboards and off-premise signs are regulated separately under Phoenix Zoning Ordinance Section 705.2 and are billed at higher plan review and permit rates
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Initial Sign Inspection
Included with the sign permit fee; the first re-inspection to verify corrections is also included at no additional charge (PDD Fee Schedule, Appendix A.2, page 17, item 2.a).
- 2
Electric Component Inspection
Separate inspection of the electrical components of an electric sign, billed at $195 per sign (PDD Fee Schedule, Appendix A.2, page 17, item 1.c).
See the full Phoenix inspection guide — scheduling & re-inspection fees →
Tips
- A Phoenix sign permit is billed in two separate pieces: an hourly Sign Plan Review fee ($195/hour, minimum 1 hour for ordinary on-premise signs) and a flat Sign Permit fee ($98 for a wall sign, $195 for a base ground sign). Budget for both — the $98 or $195 figure alone is not the total cost.
- Illuminated signs cost meaningfully more: 'For Electric Signs' adds $195 per hour to the permit, and the Electric Component Inspection is a further $195 per sign.
- Billboards are the expensive path in every column — $195/hour with a 2-hour ($390) minimum for both office and field plan review, and $780 per face for the permit itself.
- In a multi-tenant complex, check the site's Comprehensive Sign Plan before designing: it governs sign type, color, and style. Establishing a new Comprehensive Sign Plan costs $1,710, a major amendment $1,080, and a minor amendment $270.
- The first re-inspection to verify corrections is free, but a second or subsequent re-inspection — or any inspection called before the work was ready, or that could not be made because of no access — is $195 each and must be paid before the re-inspection is performed.
- Ground and Wall/Window sign plan review cannot be logged in until zoning use approval for the site is verified, per the Project Sequence Guide — resolve the use approval first or the sign clock never starts.
- Contact the PDD Sign Section at 602-495-0301 or pdd.signservices@phoenix.gov; the underlying sign regulations are in Phoenix Zoning Ordinance Chapter 7, Section 705.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-15.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Phoenix building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Phoenix
Sign Permit in other cities
Compare sign permit fees across Arizona →
Look up this fee in a different city →
Now live
Build your Phoenix project checklist
Describe your project once and get every permit, document, and fee it triggers in Phoenix — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →