Residential Solar Photovoltaic (PV) Permit — SolarAPP+ — Phoenix, Arizona · Requirements sheet
Verified 2026-07-16 · Source: https://www.phoenix.gov/administration/departments/pdd/residential-building/resident-plan-reviews/solarapp-photovoltaic.html
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Solar Photovoltaic (PV) Permit — SolarAPP+ in Phoenix, Arizona
The City of Phoenix accepts SolarAPP+ approved designs for application and permitting of residential rooftop photovoltaic (PV) projects. SolarAPP+ is a third-party software program used to verify code compliance for residential PV. After obtaining a SolarAPP+ approval, the applicant applies for the permit through the SHAPE PHX online permit portal, enters the SolarAPP+ approval ID, emails the approved documents (three-line diagram and plot plan) to PDD, then schedules an inspection. Phoenix also offers fixed-fee PV permit options. Note: the Phoenix Fire Department requires a separate permit for photovoltaic and battery energy storage systems.
Verified 2026-07-16 · Source
When you need this permit
- Must be an Arizona licensed contractor Contractor
- Residential (single-family or duplex residence) rooftop installations only
- Structure supporting the PV system must be a legal, permitted, code-compliant structure
- No battery storage; no ballasted or ground-mounted systems
- Not located within a Historic Preservation district or a FEMA Special Flood Hazard Area
- Technical limits: no existing PV/energy storage; no panel upgrades or derating; PV roof loading not to exceed 4 psf dead load; 400-amp maximum electrical service, single phase only; maximum of 2 DC strings in parallel; if using microinverters, one module per microinverter; only one module type; up to two inverter types (string) or one inverter type (microinverter)
- Submit the proposed design to SolarAPP+ for review, then apply through the SHAPE PHX online permit portal entering the SolarAPP+ approval ID
- Email the SolarAPP+ approved document and uploads (manufacturer spec sheets), three-line diagram, and plot plan to pdd.records@phoenix.gov with the PDD permit number and property address in the subject line
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
PV Inspection (scheduled via SHAPE PHX)
After permit issuance, the applicant schedules the inspection by entering the permit number and web inspection key (SolarAPP/Photovoltaic Projects page, step 4). This single PV inspection step is performed once per the number of inspections in the selected fixed-fee option — Options A pays for 3 inspections, B and C for 2, and D and E for 1 (PDD Fee Schedule, Residential Solar Photovoltaic System Permit Fixed Fee Options).
See the full Phoenix inspection guide — scheduling & re-inspection fees →
Tips
- Phoenix accepts SolarAPP+ approved designs — obtain the SolarAPP+ approval first, then apply through the SHAPE PHX portal entering the approval ID.
- The Phoenix Fire Department requires a SEPARATE permit for photovoltaic and battery energy storage systems.
- SolarAPP+ eligibility excludes battery storage, ground-mounted/ballasted systems, Historic Preservation districts, and FEMA Special Flood Hazard Areas.
- Choose a fixed-fee option (A–E) based on whether plan review is needed and how many inspections your project requires.
- The SolarAPP+ approved checklist, three-line diagram and plot plan must correlate or inspection delays will occur.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-16.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Phoenix building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Phoenix
Residential Solar Photovoltaic (PV) Permit — SolarAPP+ in other cities
Compare residential solar photovoltaic (pv) permit — solarapp+ fees across Arizona →
Look up this fee in a different city →
Now live
Build your Phoenix project checklist
Describe your project once and get every permit, document, and fee it triggers in Phoenix — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →