Inspection sequence, scheduling, and re-inspection fees for building permits in Colorado City, Arizona.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
25 S Central Street, Colorado City, AZ 86021
Phone
928-875-9165
Office hours
Building Official: Andrew J. Barlow (928-875-9165, fax 928-875-2778, building@tocc.us). General Town phone (928) 875-9160, clerk@tocc.us. ALL building permit applications and building inspections are processed through the CITY INSPECT online portal (tocc.cityinspect.com) — the Town's Building Department page directs applicants to log in or register there rather than submit paper applications in person, though the physical Building Department office is at 25 S Central Street. Addressing/address-verification requests go to Lucille Barlow at addressing@tocc.us. The Building Department works closely with Planning & Zoning (planning@tocc.us) on development review. Source: Town of Colorado City Building Department page (tocc.us/building).

Published scheduling rules

  • Application and inspection scheduling submitted entirely through the CITY INSPECT online portal (tocc.cityinspect.com) (Residential Building Permit (New Construction))

Inspection sequence

Applies to: Plumbing Permit

  1. 1

    Underground/Slab

    Before concrete pour — verify pipe slope, materials, cleanouts

  2. 2

    Rough-In

    After pipes installed, before walls closed

  3. 3

    Final

    Fixtures connected, backwater valve and sewer connection verified per Town amendments

Applies to: Residential Addition / Remodel / Accessory Structure Permit

  1. 1

    Foundation/Footing

    Required before concrete pour for additions exceeding the accessory-structure exemption

  2. 2

    Framing

    Structural connections to existing structure

  3. 3

    Final

    Completed work verified against approved plans

Applies to: Residential Building Permit (New Construction)

  1. 1

    Foundation/Footing

    Before concrete pour; empirical foundation option available for R-3/U occupancies three stories or less per Town Code § 150.01(J) (Utah DOPL Table 1805.5(6))

  2. 2

    Framing

    Structural framing, connections, egress, per 2006 IRC and Town of Colorado City Design Criteria

  3. 3

    Final

    All work complete per approved plans; scheduled through the CITY INSPECT portal

Applies to: Electrical Permit

  1. 1

    Rough-In

    Wiring and panel connections before walls are closed

  2. 2

    Final / Meter Approval

    Devices installed and panel verified per 2008 NEC; meter may not be energized until Town approval per Town Code § 150.05(B)

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In

    Ductwork and equipment placement before walls closed

  2. 2

    Final

    Equipment operational, clearances and combustion air verified per 2006 IMC

Applies to: Solar Photovoltaic (PV) Permit

  1. 1

    Foundation/Framing (structural)

    Roof penetrations, mounting-system attachment, or ground-mount footing verified per approved plans

  2. 2

    Final / Meter Approval (electrical)

    Interconnection and panel work verified per the 2008 NEC; the meter may not be energized until Town approval per Town Code § 150.05(B)

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Colorado City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Colorado City building permits

Get alerts for Colorado City

We'll email you when Colorado City's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.