Colorado City building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Colorado City, Arizona.
Verified 2026-07-06 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 25 S Central Street, Colorado City, AZ 86021
- Phone
- 928-875-9165
- building@tocc.us
- Office hours
- Building Official: Andrew J. Barlow (928-875-9165, fax 928-875-2778, building@tocc.us). General Town phone (928) 875-9160, clerk@tocc.us. ALL building permit applications and building inspections are processed through the CITY INSPECT online portal (tocc.cityinspect.com) — the Town's Building Department page directs applicants to log in or register there rather than submit paper applications in person, though the physical Building Department office is at 25 S Central Street. Addressing/address-verification requests go to Lucille Barlow at addressing@tocc.us. The Building Department works closely with Planning & Zoning (planning@tocc.us) on development review. Source: Town of Colorado City Building Department page (tocc.us/building).
- Website
- Official site
Published scheduling rules
- Application and inspection scheduling submitted entirely through the CITY INSPECT online portal (tocc.cityinspect.com) (Residential Building Permit (New Construction))
Inspection sequence
Applies to: Plumbing Permit
- 1
Underground/Slab
Before concrete pour — verify pipe slope, materials, cleanouts
- 2
Rough-In
After pipes installed, before walls closed
- 3
Final
Fixtures connected, backwater valve and sewer connection verified per Town amendments
Applies to: Residential Addition / Remodel / Accessory Structure Permit
- 1
Foundation/Footing
Required before concrete pour for additions exceeding the accessory-structure exemption
- 2
Framing
Structural connections to existing structure
- 3
Final
Completed work verified against approved plans
Applies to: Residential Building Permit (New Construction)
- 1
Foundation/Footing
Before concrete pour; empirical foundation option available for R-3/U occupancies three stories or less per Town Code § 150.01(J) (Utah DOPL Table 1805.5(6))
- 2
Framing
Structural framing, connections, egress, per 2006 IRC and Town of Colorado City Design Criteria
- 3
Final
All work complete per approved plans; scheduled through the CITY INSPECT portal
Applies to: Electrical Permit
- 1
Rough-In
Wiring and panel connections before walls are closed
- 2
Final / Meter Approval
Devices installed and panel verified per 2008 NEC; meter may not be energized until Town approval per Town Code § 150.05(B)
Applies to: Mechanical / HVAC Permit
- 1
Rough-In
Ductwork and equipment placement before walls closed
- 2
Final
Equipment operational, clearances and combustion air verified per 2006 IMC
Applies to: Solar Photovoltaic (PV) Permit
- 1
Foundation/Framing (structural)
Roof penetrations, mounting-system attachment, or ground-mount footing verified per approved plans
- 2
Final / Meter Approval (electrical)
Interconnection and panel work verified per the 2008 NEC; the meter may not be energized until Town approval per Town Code § 150.05(B)
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Colorado City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Colorado City building permits
Get alerts for Colorado City
We'll email you when Colorado City's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.