Plumbing Permit in Cottonwood, Arizona

Required for plumbing installation, alteration, or repair work in the City of Cottonwood, governed by the 2024 International Plumbing Code (IPC) as adopted and amended by the City effective July 1, 2025.

Verified 2026-07-06 · Source

When you need this permit

  • Plumbing permit required for water heater replacement, gas line work, sinks/toilets/tubs/valves/faucets added/relocated/replaced, and other plumbing system work
  • Governed by the 2024 IPC as adopted by the City of Cottonwood (Cottonwood City Code § 15.12.010), including Appendices B, C, D, and E
  • For plastic sewer piping, an insulated copper tracer wire (or other approved conductor, min. 18 AWG, listed for direct burial) must be installed adjacent to and over the full length of the piping, accessible or terminating at the cleanout (new IPC § P2604.5)
  • Water heaters shall be equipped with a temperature and pressure relief valve terminated per code
  • Apply via the CloudPermit online portal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Plumbing Base Fee (plus fixture fees)City of Cottonwood 2025 Community Development Fee Schedule, p.10, Plumbing Fees
$45.24
Water HeatersCity of Cottonwood 2025 Community Development Fee Schedule, p.10
$10.45 each
FixturesCity of Cottonwood 2025 Community Development Fee Schedule, p.10
$7.70
Sewer FeeCity of Cottonwood 2025 Community Development Fee Schedule, p.10
$22.00
Gas 1-5 Outlets / Gas Over 5 OutletsCity of Cottonwood 2025 Community Development Fee Schedule, p.10
$5.50 each / $2.20 each
Backflow Preventer (<=2" / >2")City of Cottonwood 2025 Community Development Fee Schedule, p.10
$19.80 / $39.60
Lawn Sprinkler SystemCity of Cottonwood 2025 Community Development Fee Schedule, p.10
$9.90
Repair or AlterationCity of Cottonwood 2025 Community Development Fee Schedule, p.10
$16.50
Plan Review Fee (all permits)City of Cottonwood 2025 Community Development Fee Schedule, p.8; applies where plan review is required beyond itemized fixture fees
65% of the calculated Building Permit Fee

Review timeline

Plan review
Not published — contact the department

How long did your Plumbing Permit permit actually take in Cottonwood?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Underground/Slab

    Before concrete pour — verify pipe slope, materials, cleanouts, and tracer wire on plastic sewer piping

  2. 2

    Rough-In

    After pipes installed, before walls closed

  3. 3

    Final

    Fixtures connected, water heater T&P relief valve and gas connections verified, no leaks

See the full Cottonwood inspection guide — scheduling & re-inspection fees →

Tips

  • As of July 2026, the City of Cottonwood does not appear to publish permit-specific plan review turnaround times for plumbing permits on its public website. There is no verifiable online source for a specific day-count for this permit type — call the Community Development Department at (928) 634-5505 directly.
  • Most plumbing work is billed on a per-fixture/per-device basis ($45.24 base plus itemized fees) rather than by valuation.
  • Plastic sewer piping now requires a tracer wire under the City's 2025 IPC amendment (§ P2604.5) — a new requirement not found in the base 2024 IPC.

Frequently asked questions

Yes. Water heater replacement is listed among the City's common projects requiring a building/plumbing permit, at a fee of $10.45 per unit plus the $45.24 plumbing base fee, per the 2025 Community Development Fee Schedule.

In Cottonwood, the published Plumbing Base Fee (plus fixture fees) is: $45.24. Additional published fees: Water Heaters — $10.45 each; Fixtures — $7.70; Sewer Fee — $22.00; Gas 1-5 Outlets / Gas Over 5 Outlets — $5.50 each / $2.20 each; Backflow Preventer (<=2" / >2") — $19.80 / $39.60; Lawn Sprinkler System — $9.90; Repair or Alteration — $16.50; Plan Review Fee (all permits) — 65% of the calculated Building Permit Fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Cottonwood does not publish a plan-review timeline for this permit. Contact City of Cottonwood Community Development Department — Building Division at 928-634-5505 for current turnaround.

You'll need: Plumbing Permit Application; Plumbing Plan / Fixture Unit Calculation. See the required-documents checklist on this page for details on each.

Cottonwood requires 3 inspection(s) for a plumbing permit, in order: Underground/Slab, Rough-In, Final. Schedule each through City of Cottonwood Community Development Department — Building Division (928-634-5505).

Apply through City of Cottonwood Community Development Department — Building Division at 111 North Main Street, Cottonwood, AZ 86326 (Building Division counter also referenced at 827 N. Main St., Cottonwood, AZ 86326 in the City's online directory). Phone: 928-634-5505, email: building@cottonwoodaz.gov. Office hours: Community Development Office: Monday-Thursday, 7 a.m. to 5 p.m. (closed Fridays). Building Inspection Hours: Monday-Thursday, 7:30 a.m. to 3:30 p.m. Certificates of occupancy are not issued on Fridays. Permits are applied for and tracked online via CloudPermit (us.cloudpermit.com/gov/login); inspections may be requested through the online portal ('MY INSPECTION') or by calling (928) 340-2724 — inspection requests submitted before 4:00 p.m. are scheduled for the next business day, and final inspections require 48 hours' notice.. Official information: https://cottonwoodaz.gov/158/Building-Division.

Cottonwood, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Cottonwood's Community Development Department (Planning Division, Building Division, and Ordinance Enforcement Division) independently adopts and administers its own construction codes under Title 15 (Buildings and Construction) of the Cottonwood City Code. Source: City of Cottonwood Building Division page (cottonwoodaz.gov/158/Building-Division).; 2024 International Building Code (IBC), including Appendices C, G, H, I, and J, adopted by reference as the City's building code (Cottonwood City Code § 15.08.020), with City of Cottonwood amendments (§ 15.08.021), effective July 1, 2025. Source: City of Cottonwood Ordinance No. 761, '2025 Technical Code Update,' adopted by City Council and approved by the Mayor May 20, 2025, effective July 1, 2025.; 2024 International Residential Code (IRC), including Appendices A, B, C, G, H, J, O, P and Q (with Appendices BB, BD, BF, BH, BO, CA, CB, CD, CE, and CF also adopted), adopted by reference as the one- and two-family dwelling code (§ 15.08.060), with City of Cottonwood amendments (§ 15.08.061), effective July 1, 2025. Source: City of Cottonwood Ordinance No. 761 (2025 Technical Code Update).; 2024 International Fuel Gas Code (IFGC), including Appendices A and B, adopted by reference (§ 15.08.070), with City of Cottonwood amendments (§ 15.08.071), effective July 1, 2025. Source: City of Cottonwood Ordinance No. 761 (2025 Technical Code Update).; 2024 International Existing Building Code (IEBC), including Appendices A, B, C, and E, adopted by reference (§ 15.08.080), effective July 1, 2025. Source: City of Cottonwood Ordinance No. 761 (2025 Technical Code Update).; 2018 International Energy Conservation Code (IECC) — NOTE: unlike the other ICC codes, the City's energy code was NOT advanced to the 2024 edition in the 2025 Technical Code Update; it remains the 2018 IECC (Cottonwood City Code § 15.10.010), with City amendments at § 15.10.011 (including a residential building-thermal-envelope air-leakage-test field-verification exception). The IRC's own Chapter 11 (Energy Efficiency) is separately deleted and replaced with Chapter 11 of the 2018 IRC per the Ordinance's IRC amendments. Source: City of Cottonwood Ordinance No. 761 (2025 Technical Code Update); City of Cottonwood Building Division page (confirms '2024 International Codes' adopted effective 7/1/2025 without listing IECC among the upgraded editions).; 2024 International Plumbing Code (IPC), including Appendices B, C, D, and E, adopted by reference (§ 15.12.010), with City of Cottonwood amendments (§ 15.12.011), effective July 1, 2025. Source: City of Cottonwood Ordinance No. 761 (2025 Technical Code Update).; 2023 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted by reference (§ 15.16.010), effective July 1, 2025 (electrical code cycle is one edition behind the 2024 ICC set, consistent with typical Arizona NEC adoption lag). Source: City of Cottonwood Ordinance No. 761 (2025 Technical Code Update); City of Cottonwood Building Division page.; 2024 International Mechanical Code (IMC), including Appendix A, adopted by reference (§ 15.20.010), with City of Cottonwood amendments (§ 15.20.011, including a mandatory third-party test-and-balance report requirement for altered ventilation/exhaust systems where required to verify code compliance), effective July 1, 2025. Source: City of Cottonwood Ordinance No. 761 (2025 Technical Code Update).; 2024 International Fire Code (IFC), including Appendices B through O, adopted by reference (§ 15.24.010) as the City's uniform fire code, with City of Cottonwood amendments (open-flame/aerial-fireworks restrictions in high fire-risk areas; automatic fire sprinkler requirements per NFPA 13/13-R/13-D expanded beyond the base IFC thresholds; fire-permit surety-bond amounts), effective July 1, 2025. Administered by the City of Cottonwood Fire Prevention Division. Source: City of Cottonwood Ordinance No. 761 (2025 Technical Code Update).; 2024 International Property Maintenance Code (IPMC), adopted effective July 1, 2025. Source: City of Cottonwood Building Division page (cottonwoodaz.gov/158/Building-Division).; ICC A117.1-2017 Accessibility Standard, plus the Arizonans with Disabilities Act (A.R.S. Title 41, Chapter 9, Article 8) and its implementing rules ('Americans with Disabilities Act Accessibility Guidelines for Buildings and Facilities,' declared a public record by Resolution No. 1610), adopted as an amendment to the IBC (Cottonwood City Code § 15.08.050) applying to public entities, public accommodations, and commercial facilities; also incorporated into IBC Chapter 11 (§ 1102.1) alongside the 2010 ADA Standards (Title II and Title III regulations, 28 CFR 35.15 / 36 subpart D, and the 2004 ADAAG). Source: City of Cottonwood Ordinance No. 761 (2025 Technical Code Update).; Effective July 1, 2025 the City also adopted its 2025 Community Development and Fire Department Fee Schedule, which governs all building/fire permit, plan review, and inspection fees; the base valuation-per-square-foot cost tables in that schedule are labeled 'August 2018' (carried forward unchanged from the prior fee-schedule cycle) while the general Schedule of Building Permit Fees (dollar-valuation brackets) and all mechanical/plumbing/electrical/miscellaneous fee line items were updated for 2025. Source: City of Cottonwood 2025 Community Development Fee Schedule (cottonwoodaz.gov/DocumentCenter/View/8316).. Local amendments apply — see the Cottonwood overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cottonwood building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.