Encroachment / Driveway Permit — Unincorporated Yuma County, Arizona · Requirements sheet
Verified 2026-07-23 · Source: https://www.yumacountyaz.gov/home/showpublisheddocument/28926/636228368161800000
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Encroachment / Driveway Permit in Unincorporated Yuma County, Arizona
Required to access a paved county road right-of-way from a new driveway (protects the pavement edge with a driveway apron), and more broadly for any work performed within Yuma County road right-of-way (utility crossings, culverts, curb/gutter, special events, etc.). Administered by the DDS Engineering Division. New homes, mobile homes, or buildings must construct a driveway prior to occupancy unless a driveway apron already exists at the site.
Verified 2026-07-23 · Source
When you need this permit
- Required to access a paved county road via a new driveway; not required if a driveway apron already exists at the site
- Required more broadly for any construction activity within the county road right-of-way (utility lines, culverts, curb & gutter, sidewalks, special events, survey monuments, etc.), per the detailed Encroachment Permit Fees Detail Charges schedule
- New homes, mobile homes, or other buildings must construct a driveway before occupancy is granted
- Driveway requirements depend on whether the parcel's access is off a paved or maintained county right-of-way; specific standards are published in Public Works Standards Volume I
- Mandatory minimum insurance coverage while working under an Encroachment Permit: bodily injury $500,000 per person / $1,000,000 more than one person; property damage $500,000 per occurrence (or $1,000,000 excess liability)
- 'After the Fact' permits (work performed without an approved permit) are charged double the normal fee
- Apply/inquire through the DDS Engineering Department, 2351 West 26th Street, Yuma; (928) 817-5123
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Driveway Apron / Right-of-Way Final Inspection
Verifies the constructed driveway apron, curb/gutter, or other right-of-way work conforms to Public Works Standards Volume I and the approved encroachment permit
See the full Unincorporated Yuma County inspection guide — scheduling & re-inspection fees →
Tips
- If a driveway apron already exists at your site, you do not need a new Encroachment Driveway Permit to access the paved county road.
- Encroachment permit fees are itemized per unit of work (per driveway, per linear foot of curb/culvert/utility line, etc.) rather than a single flat fee — call DDS Customer Service, (928) 817-5000, for a project-specific cost estimate.
- Working within the right-of-way without an approved permit doubles the normal fee under the 'After the Fact' provision — always obtain the encroachment permit before starting work.
- Review timelines vary by project tier per the Department of Engineering's A.R.S. §11-1605(G)-compliant Submittal Review Timelines table: 14 business days for a straightforward residential driveway/landscaping/minor traffic-control/special-event application (Type 3), 24 business days for a utility relocation/intersection/irrigation-facility application (Type 1), or 29 business days for a commercial-project application (Type 2). If the applicant does not respond to review comments within 30 business days, Yuma County considers the application withdrawn; after approval, the applicant has 30 business days to pick up the permit before it is likewise considered withdrawn.
- Permits expire after issuance: Type 1 permits in 45 business days (extendable up to 180 days total across 3 extensions); Type 2 and Type 3 permits in 90 business days (extendable up to 1 year total).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Yuma County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Yuma County
Compare encroachment / driveway permit fees across Arizona →
Look up this fee in a different city →
Now live
Build your Unincorporated Yuma County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Yuma County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →