Residential Building Permit (New Construction, Addition, Remodel) — Unincorporated Yuma County, Arizona · Requirements sheet
Verified 2026-07-07 · Source: https://www.yumacountyaz.gov/government/development-services/permit-process/residential-permit-information
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit (New Construction, Addition, Remodel) in Unincorporated Yuma County, Arizona
Required for new single-family homes, duplexes, and townhome construction, plus remodels and additions to existing homes (garage/carport construction or conversion, porch enclosures, demolition, patio covers, fences/walls, and other construction projects) in unincorporated Yuma County. Reviewed under the county's amended 2018 IRC/IBC by the Department of Development Services (DDS) Building Safety Division via a two-step Administrative Review + Technical Review process. Applications are submitted through the county's Online Permit Application Center or in person at the DDS office.
Verified 2026-07-07 · Source
When you need this permit
- Any new construction or addition exceeding $1,000 in value requires a building permit per A.R.S. § 11-321 as adopted by the Yuma County Board of Supervisors; accessory structures valued under $1,000 by the Building Official may be built without a permit
- Two-step review: Administrative Review (confirms all applicable forms/plans submitted) then Technical Review (confirms compliance with all applicable ordinances, codes, and regulations)
- Apply online through the county's Permit Application Center (https://yumacountyaz.portal.opengov.com/) or in person at 2351 West 26th Street, Yuma
- Submit two (2) scaled site plans (8.5x11) and two (2) sets of construction documents (any legible/reproducible format) for the Administrative Review Building Safety checklist
- Must comply with all Engineering (Public Works Standards Vol. I & II), Flood Control (PWS III, Floodplain Regulations), and Environmental Health approvals applicable to the site, in addition to Building Safety
- Permits expire if no inspection has occurred within 180 days of issuance
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation/Footing
Prior to concrete pour — verify forms, rebar, and footing dimensions per the county's amended 2018 IRC/IBC
- 2
Framing
Structural framing complete per approved plans, before insulation or wall cover
- 3
Final
Completed construction inspected for code compliance; schedule by calling (928) 817-5196 before 4:00 p.m. for next-business-day service
See the full Unincorporated Yuma County inspection guide — scheduling & re-inspection fees →
Tips
- Per the Residential Project Information Guide & Application Instructions, timelines vary by review complexity: Single Review 35 business days; Multiple Reviews (most projects touching Building Safety, Engineering, Flood Control, and/or Environmental Programs) 40 business days; Small Project Reviews 22 business days. This jurisdiction file uses the 22-40 business-day range spanning Small Project through Multiple Reviews.
- A.R.S. § 11-321's $1,000 value threshold (adopted by the Yuma County Board of Supervisors) means very minor accessory construction may not need a permit at all — confirm the Building Official's valuation before assuming a project is exempt.
- Unlike unincorporated Maricopa County, Yuma County's Building Safety FAQ states that replacing a water heater or adding a permanently-wired light fixture DOES require a permit — do not assume the Maricopa exemption applies here.
- Projects touching floodplain areas, wells, or septic systems require separate Flood Control, ADWR, and Environmental Programs reviews/permits in addition to the building permit; the Administrative Review checklist itemizes exactly which documents each division needs.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Yuma County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Yuma County
Residential Building Permit (New Construction, Addition, Remodel) in other cities
Compare residential building permit (new construction, addition, remodel) fees across Arizona →
Look up this fee in a different city →
Now live
Build your Unincorporated Yuma County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Yuma County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →