Skip to main content
PermitBase

Plumbing Permit in San Jose, California

San Jose publishes a Plumbing Permit table with the widest scope list of the three trades, and some entries explicitly bundle a mechanical permit with the plumbing one.

Verified 2026-09-11 · Source

When you need this permit

  • Eligible scopes include 'Repipe', 'Property Line Cleanout', 'Backflow / Vacuum Breaker' and 'Dry Well/French Drains'.
  • Two gas entries state the bundling in their own names: 'Gas Line Rough & Final (includes mechanical and plumbing permits)' and 'Gas Line Retest (includes mechanical & plumbing permits)'.
  • 'DWV (Drain-Waste-Vent) / Water Alteration' and 'Fixture - New' are single-family/duplex only; 'Fixture Replacement' extends to multifamily.
  • 'Gas Earthquake Valve' and 'Property Line Cleanout' are listed 'Yes' across all three property types.

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Plumbing Permit feesThe page sets out eligibility by scope and property type rather than dollar figures.
NOT PUBLISHED on the online permits page

Review timeline

Plan review
Not published — contact the department

How long did your Plumbing Permit permit actually take in San Jose?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Field inspection

    Required after the work; for single-family homes the trade review itself is done in the field by the assigned building inspector.

Tips

  • READ THE PERMIT NAME FOR BUNDLING. Two of San Jose's gas entries say in the name that they include the mechanical AND plumbing permits - pulling a separate one would be duplication.
  • A REPIPE IS SINGLE-FAMILY/DUPLEX ONLY online, but 'Repipe, Gyp & Shear Repair' is listed for all three property types.

Frequently asked questions

San Jose requires a plumbing permit for: Eligible scopes include 'Repipe', 'Property Line Cleanout', 'Backflow / Vacuum Breaker' and 'Dry Well/French Drains'.; Two gas entries state the bundling in their own names: 'Gas Line Rough & Final (includes mechanical and plumbing permits)' and 'Gas Line Retest (includes mechanical & plumbing permits)'.; 'DWV (Drain-Waste-Vent) / Water Alteration' and 'Fixture - New' are single-family/duplex only; 'Fixture Replacement' extends to multifamily.; 'Gas Earthquake Valve' and 'Property Line Cleanout' are listed 'Yes' across all three property types.. If your project isn't listed, confirm with City of San Jose - Development Services Permit Center at 408-535-3555 before starting work.

In San Jose, the published Plumbing Permit fees is: NOT PUBLISHED on the online permits page. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

San Jose does not publish a plan-review timeline for this permit. Contact City of San Jose - Development Services Permit Center at 408-535-3555 for current turnaround.

You'll need: Online application at SJPermits.org. See the required-documents checklist on this page for details on each.

San Jose requires 1 inspection(s) for a plumbing permit, in order: Field inspection. Schedule each through City of San Jose - Development Services Permit Center (408-535-3555).

Apply through City of San Jose - Development Services Permit Center at San Jose City Hall, 200 E. Santa Clara St., 1st Floor, San Jose, CA 95113. Phone: 408-535-3555. Office hours: Phone Hours: M-F, 7am-4pm. Permit Center visiting hours M-Tu-Th-F: 8am-12pm & 1pm-5pm, W: 9am-12pm & 1pm-5pm, and the City states 'No tickets after 3pm'. Speak with a Planner: M 10:30am-12pm & 1pm-4pm, Tu-W 9am-12pm & 1pm-4pm, Th-F 9am-12pm & 1pm-2:30pm. Parking is under City Hall Tower with validation available.. Official information: https://www.sanjoseca.gov/business/development-services-permit-center.

San Jose, California has adopted: California Building Standards Code, Title 24 California Code of Regulations, as adopted statewide. NOT ASSERTED FOR SAN JOSE SPECIFICALLY: this record does not state the City's own local amendment ordinance, so no edition or amendment is claimed here. The statewide 2025 edition took effect 1 January 2026 per the City of San Diego's adoption document; San Jose's own adoption is not asserted here and must not be inferred from it.. Local amendments apply — see the San Jose overview page for the full list.

No - the City bundles them. Its own entry reads 'Gas Line Rough & Final (includes mechanical and plumbing permits)', so one application covers both trades.

Sources & verification

Verified against official sources. Last reviewed 2026-09-11.

Online permit portal

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the San Jose building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Property Access

San Jose's permit history is searchable by address

87,559 permits on record for San Jose, 1967–2026 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.

Start your 7-day free trial7 days free for new customers, then $79/mo · the guide above stays free