Skip to main content
PermitBase

Sign Permit in Louisville, Colorado

The City of Louisville publishes a dedicated Sign Code page (Planning Department, Zoning & Design Regulations). All permanent signs require a sign permit, including any new installation or a copy change, face change, or other alteration to an existing permanent sign — with the exception that permanent non-illuminated window signs and non-illuminated wall-mounted display signs do not require a permit.

Verified 2026-08-14 · Source

When you need this permit

  • A sign permit is required for all permanent signs, including new installations and any copy change, face change, or other alteration to an existing permanent sign
  • EXEMPT from permit: permanent non-illuminated window signs, and permanent non-illuminated wall-mounted display signs
  • Governed by the City's Sign Code (Planning Department, Zoning & Design Regulations)
  • Contact the Planning Department or Building Safety Division to confirm current application requirements and fees

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Sign Permit FeeContact the Planning Department or Building Safety Division ((303) 335-4584, building@louisvilleco.gov) for a current fee quote
Not independently confirmed during this review

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in Louisville?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Louisville inspection guide — scheduling & re-inspection fees →

    Tips

    • Louisville exempts non-illuminated window signs and non-illuminated wall-mounted display signs from the permit requirement outright — a simple non-lit window sign likely doesn't need a permit, but any copy/face change to an existing PERMANENT sign does, even without new construction.

    Frequently asked questions

    Louisville requires a sign permit for: A sign permit is required for all permanent signs, including new installations and any copy change, face change, or other alteration to an existing permanent sign; EXEMPT from permit: permanent non-illuminated window signs, and permanent non-illuminated wall-mounted display signs; Governed by the City's Sign Code (Planning Department, Zoning & Design Regulations); Contact the Planning Department or Building Safety Division to confirm current application requirements and fees. If your project isn't listed, confirm with City of Louisville Building Safety Division at (303) 335-4584 before starting work.

    In Louisville, the published Sign Permit Fee is: Not independently confirmed during this review. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Louisville does not publish a plan-review timeline for this permit. Contact City of Louisville Building Safety Division at (303) 335-4584 for current turnaround.

    You'll need: Sign Permit Application. See the required-documents checklist on this page for details on each.

    Apply through City of Louisville Building Safety Division at City Hall, 749 Main St, Louisville, CO 80027. Phone: (303) 335-4584, email: building@louisvilleco.gov. Office hours: Monday-Thursday 8AM-4PM (in-person; remote 4PM-5PM); Friday 8AM-5PM remote/by appointment only; Tuesday 11AM-12PM limited staff availability (staff meeting). Inspection hours Monday-Friday 6:30AM-5PM.. Official information: https://www.louisvilleco.gov/local-government/government/departments/building-safety.

    Louisville, Colorado has adopted: 2024 International Building Code (IBC), effective 12/6/2025 — City of Louisville Building Codes page; 2024 International Residential Code (IRC), effective 12/6/2025; 2024 International Energy Conservation Code (IECC), effective 12/6/2025; 2024 International Fire Code (IFC), effective 12/6/2025; 2024 International Plumbing Code (IPC), effective 12/6/2025; 2024 International Fuel Gas Code (IFGC), effective 12/6/2025; 2024 International Mechanical Code (IMC), effective 12/6/2025; 2024 International Existing Building Code (IEBC), effective 12/6/2025; 2024 International Property Maintenance Code (IPMC), effective 12/6/2025; 2023 National Electrical Code (NEC), effective 1/5/2024; local amendment NEC 210.8(F) Exception #2 takes effect 9/1/2026 requiring GFCI protection on all new outdoor A/C units; 1997 Uniform Code for the Abatement of Dangerous Buildings, effective 12/6/2025; 1997 Uniform Housing Code, effective 12/6/2025; Colorado Model Electric Ready and Solar Ready Code, effective 12/6/2025; Louisville Fire Hardening Code — Ordinance 1884 (series 2024), updated by Ordinance 1891 (series 2025) and Emergency Ordinance 1913 (series 2026, effective 1/21/2026) — sets minimum fire-resistant construction standards for new construction, accessory structures, and repair/replacement of specific home systems (roofing, siding, decks, fencing, vents, gutters) to reduce wildfire spread risk; applies citywide, not limited to a mapped WUI zone; Louisville Municipal Code Chapter 15 — Buildings and Construction (local amendments and adoption-by-reference); Louisville Municipal Code Chapter 5.12 (Section 5.12.090) — Contractor Licensing: any contractor employed on a building project must be licensed with the City of Louisville and listed on the permit; Prior to 12/6/2025 the City operated under the 2018 ICC codes; the 2024 ICC code adoption ordinance and effective date are confirmed on the City's Building Codes page. Local amendments apply — see the Louisville overview page for the full list.

    Yes, for all permanent signs — including new installations and copy/face changes to existing signs — per the City's Sign Code, with the exception of non-illuminated window signs and non-illuminated wall-mounted display signs. Contact the Building Safety Division ((303) 335-4584) for current fees.

    Sources & verification

    Verified against official sources. Last reviewed 2026-08-14.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Louisville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.