Sign Permit — Lyons, Colorado · Requirements sheet
Verified 2026-08-14 · Source: https://lyonscolorado.com/261/Signs
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Sign Permit in Lyons, Colorado
The Town of Lyons requires a sign permit to erect, move, alter, reconstruct, or repair any permanent or temporary sign, except signs exempt under Municipal Code Section 16-9-50, per Chapter 16, Article 9 (Sign Regulations). In multiple-tenant buildings, a separate permit is required for each business entity's sign. Separate building and electrical permits may also be required depending on the sign, determined case-by-case. Prohibited sign types include flashing, rotating, blinking, or moving signs; animated signs; signs with moving/rotating/flashing lights or that create an illusion of movement; and any sign causing visual obstruction or interference with traffic or traffic-control devices.
Verified 2026-08-14 · Source
When you need this permit
- A sign permit is required to erect, move, alter, reconstruct, or repair any permanent or temporary sign, except signs exempt under Municipal Code Section 16-9-50
- In multiple-tenant buildings, a separate sign permit is required for EACH business entity's sign
- Separate building and electrical permits may be required for a given sign, determined on a case-by-case basis
- Prohibited sign types: flashing, rotating, blinking, or moving signs; animated signs; signs with moving/rotating/flashing lights or an illusion-of-movement effect; signs causing visual obstruction or interference with traffic or traffic-control devices
- Standards for lighting, size, and placement of business signs are set in Municipal Code Chapter 16, Article 9
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
See the full Lyons inspection guide — scheduling & re-inspection fees →
Tips
- In a multi-tenant building in Lyons, each business needs its OWN sign permit — a single building-wide sign permit does not cover multiple tenants' signage.
- Lyons prohibits flashing, rotating, blinking, animated, or otherwise moving-light signage outright — check Chapter 16, Article 9 before designing an eye-catching illuminated sign.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-14.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lyons building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Lyons
Sign Permit in other cities
Compare sign permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Lyons project checklist
Describe your project once and get every permit, document, and fee it triggers in Lyons — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →