Change of Use Permit in Poncha Springs, Colorado
A change in the use of land or a structure within the Town of Poncha Springs is a distinct Town Land Use Application, administered directly by the Town under its Land Use Code (Chapter 30), with its own flat fee on the Town's Land Use Application Fees schedule. Any accompanying construction remains subject to the same two-step Town-then-Chaffee-County building-permit process already established elsewhere in this file.
Verified 2026-08-14 · Source
When you need this permit
- Land Use Code Sec. 6.1.1.2, verbatim: 'Existing uses not creating a public health, safety or nuisance hazard are grandfathered if they existed in use prior to the adoption of this code until such time the use is changed and/or expanded. Expansion of a use requires compliance with this code unless a variance is granted by the Town.'
- Sec. 6.1.1.3 applies the same principle to existing signs and other appurtenances: they remain grandfathered only 'until the Structure, Sign or other appurtenances are changed, replaced or expanded.'
- Sec. 6.1.2.2: 'Any use specifically listed is either allowed or prohibited per Table 12. Any use not specifically listed in Table 12 may be interpreted by the Board of Trustees majority vote to determine if it fits within a listed use' — a proposed new use must be checked against Table 12 (Matrix of Permitted and Conditional Uses by Zoning District, Land Use Code Sec. 6.5)
- Sec. 5.11.2.2.2: 'Any building expansion or change of use that results in an increase in required [parking] spaces over the number of existing spaces shall provide additional parking spaces only for that increment of the expansion, as if it were a separate development' — a change of use can independently trigger new parking requirements
- CCFPD's own Plan Reviews page confirms a change of use (its own example: 'from a residence to a restaurant') independently triggers a fire-code plan review, separate from the Town's zoning-side review
- Where the change of use involves any construction/alteration, the standard two-step process applies: Town of Poncha Springs Building Permit Coversheet (Town Zoning Criteria, Land Use Application Fee, 2% Building Construction Materials Use Tax, confirmed Salida sewer payment) followed by Chaffee County Building Safety Department plan review/permit issuance/inspections, per this file's residential-building-permit and commercial-building-permit entries
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
See the full Poncha Springs inspection guide — scheduling & re-inspection fees →
Tips
- A change of use can reopen compliance obligations the property was previously grandfathered out of — per Sec. 6.1.1.2 and 6.1.1.3, existing (nonconforming) uses, structures, and signs are only protected 'until' the use changes; once it does, the property must be brought into compliance with the current Land Use Code.
- Check whether your proposed new use adds parking demand — Sec. 5.11.2.2.2 requires additional on-site parking spaces specifically for the incremental demand created by a change of use, treated as if it were a separate development.
- A change of use involving food service (e.g., 'from a residence to a restaurant,' the fire district's own example) independently triggers a Chaffee County Fire Protection District plan review — budget for that review alongside the Town's $50 Change of Use fee.
- The $50 Change of Use fee covers the Town's zoning-compliance review only — any accompanying construction/alteration still needs the full two-step Town Building Permit Coversheet + Chaffee County Building Permit process documented elsewhere in this file.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-14.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Poncha Springs building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Poncha Springs
Change of Use Permit in other cities
Compare change of use permit fees across Colorado →
Look up this fee in a different city →