Westcliffe building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Westcliffe, Colorado.
Verified 2026-07-06 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 1000 Main Street, P.O. Box 406, Westcliffe, CO 81252
- Phone
- 719-783-2282, ext. 12 (Building Department); ext. 10 or 11 (other permit/application forms)
- Office hours
- Building and Zoning office hours: Monday through Thursday, 8:00 a.m. to 5:00 p.m. (Town Hall general hours: Monday through Friday, 8:00 a.m. to 5:00 p.m.).
- Website
- Official site
Inspection sequence
Applies to: Residential Building Permit (New Construction)
- 1
Foundation
Before concrete pour, per 40-inch minimum frost line depth
- 2
Framing
Structural framing complete before cover
- 3
Mechanical Rough-In
Mechanical/HVAC rough-in before concealment; fee set off cost of job per the Administration Fee Schedule
- 4
Final Inspection
All work complete per approved plans and applicable codes
Applies to: Accessory Dwelling Unit (ADU) Permit
- 1
Foundation (new-construction ADU only)
Before concrete pour, if new construction rather than a conversion
- 2
Framing
Structural framing complete before cover
- 3
Final Inspection
All work complete per approved plans and applicable codes
Applies to: Commercial Tenant Improvement / Commercial Building Permit
- 1
Foundation
Before concrete pour
- 2
Framing
Structural framing complete before cover
- 3
Final Inspection
All work complete per approved plans and applicable codes
Applies to: Deck / Covered Patio / Carport Permit
- 1
Footing/Foundation
Before concrete pour, per 40-inch minimum frost line depth, if footings are required
- 2
Final Inspection
Structure complete per approved plans
Applies to: Electrical Permit
- 1
Rough Electrical (State Inspector)
Performed by a Colorado State Electrical Inspector before concealment
- 2
Final Inspection (State Inspector)
Performed by a Colorado State Electrical Inspector; system energized and verified
Applies to: Mechanical / HVAC Permit
- 1
Rough Mechanical
Ductwork, flues, and equipment placement before concealment
- 2
Final Inspection
Equipment operational, combustion air and venting verified
Applies to: Plumbing Permit
- 1
Rough Plumbing (State Inspector)
Performed by a Colorado State Plumbing Inspector before concealment
- 2
Final Inspection (State Inspector)
Performed by a Colorado State Plumbing Inspector; fixtures connected, no leaks, proper venting verified
Applies to: Residential Addition / Remodel Permit
- 1
Framing
Framing complete, connection to existing structure verified
- 2
Final Inspection
All work complete per approved plans
Applies to: Solar Photovoltaic (PV) Permit
- 1
Building Final (Town)
Racking, roof penetrations, and structural attachment verified by the Town Building Official
- 2
Electrical Final (State Inspector)
Performed by a Colorado State Electrical Inspector; wiring, inverter, and interconnection verified before energizing
Final inspection only: Demolition Permit, Electric Vehicle (EV) Charging Station Permit, Re-Roofing Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Westcliffe building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Westcliffe building permits
Get alerts for Westcliffe
We'll email you when Westcliffe's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.