Accessory Dwelling Unit (ADU) Permit — Westcliffe, Colorado · Requirements sheet
Reviewed 2026-07-06 · Source: https://townofwestcliffe.colorado.gov/press-release/public-notice-for-ordinance-4-2024
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Accessory Dwelling Unit (ADU) Permit in Westcliffe, Colorado
Required for construction or conversion of an Accessory Dwelling Unit in Westcliffe. ADUs were established as a permitted use by right (within certain parameters) by Ordinance No. 4-2024 (adopted October 15, 2024), which added Title 10, Chapter 1, Section 17 to the Municipal Code. An ADU may be new construction or a conversion of an existing accessory structure (e.g. shed, garage).
Reviewed 2026-07-06 · Source
When you need this permit
- Permitted as a use by right within certain parameters per Ordinance No. 4-2024 (Title 10, Chapter 1, Section 17) — confirm specific dimensional/parameter limits (size caps, setbacks, owner-occupancy requirements, etc.) directly with the Building and Zoning office, as the full ordinance text could not be independently retrieved in machine-readable form during this review
- May be new construction or conversion of an existing accessory structure (shed, garage) per the Town Manager/Building & Zoning Officer's own public description of the program
- Underlying construction must still comply with the 2006 IRC/IBC as locally adopted, including the Town's Climatic and Geographic Design Criteria
- A Board of Trustees resolution delaying ADU permit and other fees applies ONLY to town-owned lots, not privately-owned lots generally — do not assume a blanket fee deferral
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation (new-construction ADU only)
Before concrete pour, if new construction rather than a conversion
- 2
Framing
Structural framing complete before cover
- 3
Final Inspection
All work complete per approved plans and applicable codes
See the full Westcliffe inspection guide — scheduling & re-inspection fees →
Tips
- Confirm the specific ADU parameters (size limits, setbacks, parking, owner-occupancy conditions, etc.) directly with the Building and Zoning office at 719-783-2282 ext. 12 — the full text of Ordinance No. 4-2024 was not available in machine-readable form during this research pass, so treat the 'use by right within certain parameters' framing as directional, not a complete parameter list.
- A shed or existing garage may be converted into an ADU rather than requiring ground-up new construction, per the Town Manager's own public description of the program.
- Do not assume a blanket ADU permit-fee deferral — the Board of Trustees' fee-delay resolution applies only to town-owned lots, not privately-owned parcels generally.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Westcliffe building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Westcliffe
Accessory Dwelling Unit (ADU) Permit in other cities
Compare accessory dwelling unit (adu) permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Westcliffe project checklist
Describe your project once and get every permit, document, and fee it triggers in Westcliffe — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →