Skip to main content
PermitBase

Westcliffe building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Westcliffe, Colorado.

Last verified 2026-07-06 · Source · Embed this page’s badge · Version history

Building department

Address
1000 Main Street, P.O. Box 406, Westcliffe, CO 81252
Phone
719-783-2282, ext. 12 (Building Department); ext. 10 or 11 (other permit/application forms)
Office hours
Building and Zoning office hours: Monday through Thursday, 8:00 a.m. to 5:00 p.m. (Town Hall general hours: Monday through Friday, 8:00 a.m. to 5:00 p.m.).

Inspection guide

See how inspections work in Westcliffe — sequence, scheduling & re-inspection fees.

Codes adopted

Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.

  • 2006 International Building Code (IBC), excluding all appendices unless specifically adopted — Westcliffe Municipal Code Title 3, Chapter 2, Section 3-2-1 (Ord. 7-2016, eff. 6/2/2016, repealing and replacing the section originally adopted by Ord. 3-1991, amended by Ord. 3-1996, Ord. 1-2000, Ord. 2-2008)
  • 2006 International Residential Code (IRC), with Appendix E (Manufactured Housing Used as Dwellings) adopted in its entirety
  • 2006 International Mechanical Code (IMC)
  • 2006 International Fire Code (IFC), with Wet Mountain Fire Protection District named as the Department of Fire Prevention for the Town (Section 103.1 amendment)
  • 2006 International Existing Building Code (IEBC) — locally amended to replace all references to the International Property Maintenance Code
  • 2006 International Energy Conservation Code (IECC)
  • No local International Plumbing Code (IPC) or National Electrical Code (NEC) edition is separately adopted by the Town — electrical and plumbing permitting/inspection authority is assigned entirely to the State of Colorado (see localAmendments and the electrical-permit/plumbing-permit entries below).
  • Currency note: the Town's own codified Municipal Code (Title 3, Chapter 2, most recently amended by Ord. 7-2016, eff. 6/2/2016) still specifies the 2006 ICC code family with no more recent edition-adoption ordinance found after a full chase (Municode library, Town press-release archive, and direct site search for a 2018/2021/2024-edition adoption ordinance all came up empty as of this review). Colorado is home-rule with no statewide-mandated code edition for a town this size, so the 2006 suite is treated as the current, governing adopted code for this file rather than assumed to have been silently upgraded.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
0units

0 buildings · $0 valuation

Trailing 12 months
5units

12 of 12 months reported · #59 in Colorado coverage by units

Year to date (2026 YTD through 2026-05)
1units

1 buildings · $300,000 valuation

5 month(s) reported to Census

Full year 2025
5units

5 buildings · $1.3M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity

Tips & gotchas

  • Westcliffe (2020 Census population 435; ~495 est. 2023) is a small home-rule/statutory town with its OWN Building and Zoning Official — currently combined with the Town Manager role (Caleb Patterson, as of the most recent verified interview) rather than a dedicated multi-person department. Confirm parcel jurisdiction (Town vs. unincorporated Custer County) before assuming these rules apply.
  • Electrical AND plumbing permits are issued and inspected ENTIRELY by the State of Colorado (DORA/DPO Electrical & Plumbing Permits program), NOT the Town — this is an explicit amendment written directly into the Town's own Municipal Code (Title 3, Chapter 2), and independently confirmed by checking that Custer County is not listed among the excluded counties on the DORA/DPO jurisdiction pages for either trade.
  • The Town's adopted code family is the 2006 ICC suite (IBC, IRC, IMC, IFC, IEBC, IECC) per the most recent amending ordinance found (Ord. 7-2016, eff. 6/2/2016) — no later edition-adoption ordinance was found after a full chase of the Municode library, the Town's press-release archive, and direct site search. This is notably older than many larger Colorado jurisdictions (which have moved to 2021/2024 editions); confirm current status directly with the Building Department (719-783-2282 ext. 12) before finalizing a code analysis for a specific project.
  • Westcliffe's own Climatic and Geographic Design Criteria (Municipal Code Title 3, Chapter 2, IRC Section R301.2(1)): 50 psf ground snow load, 110 mph wind speed, Exposure C seismic, 40-inch frost depth, -10°F winter design temp, and NO mandatory ice barrier underlayment — notably lighter design criteria than some higher-profile Colorado mountain resort towns at similar elevation (e.g. Vail's 145 psf snow load / 100% ice barrier). Do not reuse a generic 'Colorado mountain town' design assumption for a Westcliffe project.
  • Accessory Dwelling Units are permitted as a use by right within certain parameters per Ordinance No. 4-2024 (Oct. 15, 2024), but this file could not independently retrieve the full ordinance's dimensional/parameter text (Municode's public library viewer for this client is a JavaScript SPA whose backing API did not expose a working public content route during this review) — confirm specific ADU parameters directly with the Building and Zoning office. A Board of Trustees fee-delay resolution for ADUs applies only to town-owned lots, not private parcels generally.
  • The Town's actively-maintained standalone 'Fee Schedule' document (footer-dated 6/2021 but published under filename 'FEE SCHEDULE adopted 2024.pdf', and referenced as further amended by Ordinance #1-2025 for park-use fees specifically) is a DIFFERENT, more current document than the older fee table codified in Municipal Code Title 3, Chapter 2, Section 3-2-3 (set by the same Ord. 7-2016 that adopted the 2006 codes). This file's permitType fees use the standalone, actively-maintained Fee Schedule rather than the older codified table.
  • If work is started before a permit is obtained, the Town's Fee Schedule states the permit fee will DOUBLE — a stricter and more explicit penalty statement than many peer jurisdictions publish.
  • Mechanical (HVAC) permit fees are NOT set by the valuation-tier table used for Building/Residential permits — they are 'set off cost of job' at the Building and Zoning office's discretion; call ahead for a quote rather than estimating from the general fee table.
  • Commercial Plan Review is contracted out to the International Code Council itself (65% of permit fee) — a distinctly different and higher-cost arrangement than the Town's in-house Residential New Construction plan review (50% of permit fee).
  • The Town does not publish a numeric plan-review or permit-issuance turnaround (days/weeks) for ANY permit category anywhere on its site — not the Building Department page, the standalone Fee Schedule, or the codified Title 3 Chapter 2 ordinance text. Colorado is home-rule with no statewide clock for a town this size, and every permitType in this file is honestly null/unverified with a documented chase trail rather than an invented figure.
  • State-level housing/zoning legislation aimed at population thresholds (referenced by the Town's own Building & Zoning Officer as generally applying to towns of 1,000+ population) appears not to bind Westcliffe given its ~495-person population — but this file did not independently re-derive the exact statutory population threshold from bill text itself, so treat this as a directional, partial-confidence note rather than a verified statutory citation for any specific state mandate (including HB22-1362).
  • Full-header curl (custom User-Agent + Accept headers) was required to retrieve the Building Department page directly — a bare fetch without browser-like headers returned HTTP 403. If independently verifying these sources, use a full browser session or equivalent headers rather than a bare request.

Comparable nearby cities

Silver Cliff
Both in Custer County9 shared permit types~4 mi away
Compare fees →
Center
12 shared permit types~44 mi away
Compare fees →
Cripple Creek
12 shared permit types~45 mi away
Compare fees →