Residential Building Permit (New Construction) in Westcliffe, Colorado
Required for new construction of single-family homes in the Town of Westcliffe. Reviewed under the 2006 IRC/IBC as locally adopted and amended, including the Town's Climatic and Geographic Design Criteria (50 psf ground snow load, 110 mph wind speed, 40-inch frost depth, no mandatory ice barrier underlayment). Issued by the Town's Building and Zoning Official.
Verified 2026-07-06 · Source
When you need this permit
- Plans must comply with the 2006 IRC/IBC as locally adopted and amended by Municipal Code Title 3, Chapter 2
- Must meet the Town's Climatic and Geographic Design Criteria: 50 psf ground snow load, 110 mph wind speed, Exposure C seismic design, 40-inch minimum frost line depth, -10°F winter design temperature
- Electrical and plumbing work require SEPARATE permits issued by the State of Colorado (DORA/DPO), not the Town — see electrical-permit and plumbing-permit entries
- Building permit fee determined by the Building Official from total project valuation per the Town's standalone Fee Schedule
- Plan Review Fee (50% of permit fee for residential new construction) due at time of application submittal, separate from the permit fee itself
- If work is started before a permit is obtained, the permit fee doubles
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation
Before concrete pour, per 40-inch minimum frost line depth
- 2
Framing
Structural framing complete before cover
- 3
Mechanical Rough-In
Mechanical/HVAC rough-in before concealment; fee set off cost of job per the Administration Fee Schedule
- 4
Final Inspection
All work complete per approved plans and applicable codes
See the full Westcliffe inspection guide — scheduling & re-inspection fees →
Tips
- Electrical and plumbing permits are NOT issued by the Town — they must be obtained separately and directly from the Colorado Division of Professions and Occupations (DORA/DPO) at dpo.colorado.gov/EandP/Permits. Do not expect the Town's building permit to cover trade work.
- Westcliffe's Climatic and Geographic Design Criteria (50 psf ground snow load, 110 mph wind speed, no mandatory ice barrier underlayment) are notably lighter than higher-profile Colorado mountain resort towns at similar elevation — confirm your structural engineer designs to Westcliffe's own published chart rather than a generic high-country assumption.
- If work begins before a permit is obtained, the Town's Fee Schedule states the permit fee will double — always secure the permit first.
- The Plan Review Fee (50% of the permit fee for residential new construction) is due at the time of application submittal, separate from and in addition to the permit fee itself.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Westcliffe building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Westcliffe
Residential Building Permit (New Construction) in other cities
Compare residential building permit (new construction) fees across Colorado →
Look up this fee in a different city →
Now live
Build your Westcliffe project checklist
Describe your project once and get every permit, document, and fee it triggers in Westcliffe — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →