Castle Rock building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Castle Rock, Colorado.

Verified 2026-07-05 · Source

How to schedule

Inspections are requested through the building department below.

Address
100 N. Wilcox St., Castle Rock, CO 80104
Phone
720-733-3527
Office hours
Development Services Building Counter (Town Hall): Monday-Friday, 8 a.m. to 5 p.m. Inspection scheduling line: 303-660-1341.

Published scheduling rules

  • Contact: Development Services Building Counter (Town Hall, 100 N. Wilcox St.) open 8 a.m.-5 p.m. Monday-Friday, phone 720-733-3527, email buildingcounter@crgov.com. Inspection scheduling line: 303-660-1341. All permit applications and plan submittals are electronic-only via the eTRAKiT Development Portal (etrakitt9.crgov.com). (General)

Inspection sequence

Applies to: Residential Building Permit (New Construction)

  1. 1

    Foundation

    Before concrete pour; must be inspected/reported by a Colorado-licensed professional engineer or registered architect per local amendment R109.1.1.1, in addition to the Town's own foundation inspection

  2. 2

    Framing

    Structural framing per 2024 IRC and approved plans

  3. 3

    Electrical Rough-In

    Verifies wiring, panel capacity, and — where a solar-ready zone is installed — conduit/prewiring from the solar-ready zone to the electrical panel (local amendment R105.2.4.1)

  4. 4

    Insulation and Fenestration Rough-In

    Verifies insulation types/R-values and fenestration U-factors before interior finish, per local amendment R105.2.4.2

  5. 5

    Final

    All work complete, ready for Certificate of Occupancy

Applies to: Residential Addition / Remodel / Basement Finish Permit

  1. 1

    Foundation (if applicable)

    For additions or garages with new footings — 36-inch minimum frost depth

  2. 2

    Framing

    Structural framing and connection to existing structure

  3. 3

    MEP Rough-In

    Mechanical, electrical, plumbing rough-in before walls closed

  4. 4

    Final

    All work complete per approved plans

Applies to: Solar Photovoltaic (PV) Permit

  1. 1

    Structural/Racking (Building)

    Roof penetrations and mounting-system attachment verified per the Building Permit

  2. 2

    Electrical Rough-In

    Wiring and conduit verified; if a solar-ready zone was previously installed, conduit/prewiring routing to the panel is specifically checked per local amendment R105.2.4.1

  3. 3

    Final Electrical

    Interconnection, grounding, and disconnects verified per the 2026 NEC before the system is energized

Applies to: Electrical Permit

  1. 1

    Rough-In

    Wiring and conduit installed before walls closed; verify solar-ready conduit routing if applicable

  2. 2

    Final

    Devices installed, panel labeled, system energized

Applies to: EV Charger / EVSE Permit

  1. 1

    Rough-In

    New circuit wiring and conduit installed before walls are closed, if applicable; for new construction, verifies EV-ready conduit routing per the 2023 Colorado Model Electric-Ready and Solar-Ready Code

  2. 2

    Final

    Charger unit installed, devices connected, system energized

Applies to: Fence and Retaining Wall Permit

  1. 1

    Footing

    Required for retaining walls with a permit, before backfill

  2. 2

    Final

    Completed fence/wall verified against approved plans

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In / Equipment

    Equipment and ductwork installed before concealment

  2. 2

    Final

    Equipment operational, combustion air and venting verified

Applies to: Plumbing Permit

  1. 1

    Rough-In

    Pipe installation, slope, and materials verified before concealment

  2. 2

    Final

    Fixtures connected, no leaks, proper venting

Castle Rock building permits

Get alerts for Castle Rock

We'll email you when Castle Rock's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.