Change of Use / Change of Occupancy Permit — Castle Rock, Colorado · Requirements sheet
Verified 2026-08-13 · Source: https://www.crgov.com/DocumentCenter/View/50737/2026-Fee-Schedule-PDF
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Change of Use / Change of Occupancy Permit in Castle Rock, Colorado
Required when a tenant space's use, or its IBC occupancy classification, changes without any accompanying construction work. Castle Rock genuinely splits this review into two independently priced tracks: the Building Division charges a flat Change of Occupancy fee (when the occupancy classification itself changes) or a lower Change of Tenancy fee (a pure tenant swap with no occupancy-classification change), while Castle Rock Fire and Rescue separately assesses its own 'Change of Use' plan-check-plus-inspection fee to re-verify fire code compliance for the new use.
Verified 2026-08-13 · Source
When you need this permit
- No construction is proposed and the occupancy classification changes: Building Division 'Change of Occupancy' review applies ($250.00)
- No construction is proposed and the occupancy classification does NOT change (a pure tenant swap): Building Division 'Change of Tenancy' review applies instead ($200.00) — the same fee line also documented in this file's Commercial Tenant Improvement Permit entry
- Separately and in addition, Castle Rock Fire and Rescue conducts its own 'Change of Use' fire-code plan check and inspection to confirm the new use complies with the current International Fire Code as locally amended — this is a distinct fee line item on the Town's own Fire and Rescue Systems and Other Fees schedule, independent of the Building Division fee
- If actual construction, demolition, or tenant-improvement work accompanies the change of use, the project is instead reviewed under the full Commercial Tenant Improvement Permit (this file's commercial-tenant-improvement-permit entry) rather than this construction-free change-of-use track
- Food-service changes of use require a separate Douglas County Health Department Retail Food Establishment Program application, independent of both the Town's Building and Fire reviews
- Application submitted electronically via the eTRAKiT Development Portal, consistent with the Town's other Building Division permits
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Fire and Life Safety Change-of-Use Inspection
Verifies the new use/occupancy against current Fire Code requirements; billed as the Fire Department's separate Change of Use inspection fee
- 2
Building Final (if occupancy classification changes)
Confirms the space meets applicable building/egress requirements for the new occupancy classification before sign-off
See the full Castle Rock inspection guide — scheduling & re-inspection fees →
Tips
- Budget for TWO separate fees, not one: the Building Division's $250 Change of Occupancy (or $200 Change of Tenancy) fee, PLUS Castle Rock Fire and Rescue's own separate $503.87 Change of Use plan-check-and-inspection fee — these are two different departments billing independently for the same underlying use change.
- Whether you owe $250 (Change of Occupancy) or $200 (Change of Tenancy) hinges entirely on whether the IBC occupancy classification itself is changing, not on whether the business name/tenant is changing — confirm which applies with the Building Division before assuming the lower fee.
- Any actual construction converts this into a full Commercial Tenant Improvement Permit instead of the lighter change-of-use-only track — the two are not interchangeable.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Castle Rock building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Castle Rock
Change of Use / Change of Occupancy Permit in other cities
Compare change of use / change of occupancy permit fees across Colorado →
Look up this fee in a different city →