Mountain View building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Mountain View, Colorado.
Verified 2026-07-23 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- Mountain View Town Hall, 4176 Benton Street, Mountain View, CO 80212
- Phone
- (303) 450-8746
- Office hours
- Building division operates weekdays 8:00 a.m.-5:00 p.m. (Town's FAQ page prints this as '8:00 a.m. - 5:00 a.m.', which is evidently a typo for 5:00 p.m. given the Town Hall's own general business hours; noted honestly rather than silently corrected without flagging). Inspection request line (303) 450-8748 — call by 4:00 p.m. for next-business-day inspection. Town Hall main line (303) 421-7282.
- Website
- Official site
Published scheduling rules
- Call the inspection line ((303) 450-8748) by 4:00 p.m. to get an inspection scheduled for the next business day. (Residential Building Permit (New Construction))
Inspection sequence
Applies to: Residential Building Permit (New Construction)
- 1
Foundation/Setback
Verifies footing/foundation placement and required setbacks before concrete pour
- 2
Rough Framing
Structural framing complete before cover
- 3
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment (insulation, drywall, etc.)
- 4
Insulation / Drywall-Screw
Per the Town's FAQ list of possible inspection types for a given permit
- 5
Final Inspection
All work complete per approved plans; permit card collected by inspector upon satisfactory completion
Applies to: Residential Addition / Remodel Permit
- 1
Foundation (additions with new footings only)
Before concrete pour, if the addition includes new foundation work
- 2
Rough Framing
Framing complete, tie-in to existing structure verified
- 3
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment
- 4
Final Inspection
All work complete per approved plans
Applies to: Deck / Covered Patio / Patio Enclosure Permit
- 1
Footing/Foundation
Deck footings or patio-cover foundation before concrete pour, if applicable
- 2
Framing
Deck or patio-cover framing complete before final
- 3
Final Inspection
Completed structure verified against approved plans
Applies to: Electric Vehicle (EV) Charger Permit
- 1
Rough Electrical
New circuit wiring and panel installed before concealment
- 2
Final Inspection
System complete, inspected before power release
Applies to: Electrical Permit
- 1
Rough Electrical
Wiring and panel installed before concealment by insulation, drywall, paneling, etc.
- 2
Final Inspection
System complete, inspected prior to occupancy and permanent power release
Applies to: Mechanical / HVAC Permit
- 1
Rough Mechanical
Ductwork, flues, and equipment placement before concealment
- 2
Final Inspection
Equipment operational, combustion air/venting verified
Applies to: Plumbing Permit
- 1
Rough Plumbing
Pipe, drain, waste, and vent installation before concealment
- 2
Final Inspection
Fixtures connected, system complete and tested prior to occupancy
Applies to: Rooftop Solar / Photovoltaic Permit
- 1
Rough Electrical
Conduit runs, wiring, and disconnect placement before cover
- 2
Final Inspection
Racking, roof penetrations, and electrical connections verified, system energized
Final inspection only: Demolition Permit, Reroofing Permit
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Mountain View building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Mountain View building permits
Get alerts for Mountain View
We'll email you when Mountain View's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.