Skip to main content
PermitBase

Residential Addition / Remodel Permit in Mountain View, Colorado

Required for additions, garage/attic/sunroom conversions to habitable space, kitchen/basement/bathroom remodels, and structural modifications to existing residential structures in Mountain View.

Verified 2026-08-02 · Source

When you need this permit

  • Same application, valuation, use-tax, and insurance-documentation process as new residential construction
  • Town Building Department FAQ explicitly lists 'Additions,' 'Remodeling IE: Kitchen remodel, Basement finish, Bathroom remodel, etc.,' 'Garage Conversions, Attic Space Conversion and Sunroom Conversions to habitable space,' and 'Structural Modifications' among common projects requiring a permit
  • A Licensed professional (not homeowner self-performed) is required if the home is intended for immediate sale/resale or is a rental occupied/to-be-occupied by tenants

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Permit Fee
Per Resolution No. 2024-12-16H, Exhibit A 'Town of Mountain View Fee Schedule' (Chapter 18 - Building Regulations, 'Building Permit Fees Set By Resolution' table, updated 12/12/2024, tomv.org/media/2046). Show full citationPer Resolution No. 2024-12-16H, Exhibit A 'Town of Mountain View Fee Schedule' (Chapter 18 - Building Regulations, 'Building Permit Fees Set By Resolution' table, updated 12/12/2024, tomv.org/media/2046). Applied to the addition/remodel's stated total valuation, same as new construction.
$40.00 for total valuation $1.00-$500.00; $40.00 for the first $500.00 plus $2.00 per additional $100.00 (or fraction) from $501.00-$2,000.00; $70.00 for the first $2,000.00 plus $14.00 per additional $1,000.00 (or fraction) from $2,001.00-$25,000.00; $391.25 for the first $25,000.00 plus $10.10 per additional $1,000.00 (or fraction) from $25,001.00-$50,000.00; $643.75 for the first $50,000.00 plus $7.00 per additional $1,000.00 (or fraction) from $50,001.00-$100,000.00; $993.75 for the first $100,000.00 plus $5.60 per additional $1,000.00 (or fraction) from $100,001.00-$500,000.00; $3,233.75 for the first $500,000.00 plus $4.75 per additional $1,000.00 (or fraction) from $500,001.00-$1,000,000.00; $5,608.75 for the first $1,000,000.00 plus $3.65 per additional $1,000.00 (or fraction) above $1,000,000.00
Plan Review FeePer Resolution No. 2024-12-16H, Exhibit A Fee Schedule ('Plan Review Fees by Resolution' table, updated 12/12/2024). Paid up front, before review, per the Building Department FAQ.
65% of the Building Permit Fee
Use Tax
4% per the Town's live Building Department FAQ ('Use Tax = total valuation x 50 percent x 4 percent'), which governs over the Use Tax Guidelines PDF's older 3% figure -- see… Show full citation4% per the Town's live Building Department FAQ ('Use Tax = total valuation x 50 percent x 4 percent'), which governs over the Use Tax Guidelines PDF's older 3% figure -- see residential-building-permit's Use Tax fee entry for the full note. Applies to additions that add new materials/value; interior remodels are valued per the same formula on the remodel's stated valuation.
Total valuation x 50% x 4%

Review timeline

Plan reviewMountain View’s published plan-review target
5–10 business days

How long did your Residential Addition / Remodel Permit permit actually take in Mountain View?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation (additions with new footings only)

    Before concrete pour, if the addition includes new foundation work

  2. 2

    Rough Framing

    Framing complete, tie-in to existing structure verified

  3. 3

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  4. 4

    Final Inspection

    All work complete per approved plans

See the full Mountain View inspection guide — scheduling & re-inspection fees →

Tips

  • A basement finish, kitchen remodel, or bathroom remodel each require a Building Department permit in Mountain View even though they don't change the building footprint — the Town's FAQ explicitly calls these out as commonly-missed permit triggers.
  • If a wall you plan to remove may be load-bearing, confirm with the Building Department/SAFEbuilt whether an engineer's letter is expected as part of your submittal — the Town's published materials do not include a structural-review document checklist.

Frequently asked questions

Mountain View requires a residential addition / remodel permit for: Same application, valuation, use-tax, and insurance-documentation process as new residential construction; Town Building Department FAQ explicitly lists 'Additions,' 'Remodeling IE: Kitchen remodel, Basement finish, Bathroom remodel, etc.,' 'Garage Conversions, Attic Space Conversion and Sunroom Conversions to habitable space,' and 'Structural Modifications' among common projects requiring a permit; A Licensed professional (not homeowner self-performed) is required if the home is intended for immediate sale/resale or is a rental occupied/to-be-occupied by tenants. If your project isn't listed, confirm with Town of Mountain View Building Department (administered by SAFEbuilt under contract) at (303) 450-8746 before starting work.

In Mountain View, the published Permit Fee is: $40.00 for total valuation $1.00-$500.00; $40.00 for the first $500.00 plus $2.00 per additional $100.00 (or fraction) from $501.00-$2,000.00; $70.00 for the first $2,000.00 plus $14.00 per additional $1,000.00 (or fraction) from $2,001.00-$25,000.00; $391.25 for the first $25,000.00 plus $10.10 per additional $1,000.00 (or fraction) from $25,001.00-$50,000.00; $643.75 for the first $50,000.00 plus $7.00 per additional $1,000.00 (or fraction) from $50,001.00-$100,000.00; $993.75 for the first $100,000.00 plus $5.60 per additional $1,000.00 (or fraction) from $100,001.00-$500,000.00; $3,233.75 for the first $500,000.00 plus $4.75 per additional $1,000.00 (or fraction) from $500,001.00-$1,000,000.00; $5,608.75 for the first $1,000,000.00 plus $3.65 per additional $1,000.00 (or fraction) above $1,000,000.00. Additional published fees: Plan Review Fee — 65% of the Building Permit Fee; Use Tax — Total valuation x 50% x 4%. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Mountain View's published plan-review target for a residential addition / remodel permit is 5–10 business days.

You'll need: Building Permit Application; Plot Plan; Use Tax Calculation. See the required-documents checklist on this page for details on each.

Mountain View requires 4 inspection(s) for a residential addition / remodel permit, in order: Foundation (additions with new footings only), Rough Framing, Rough Electrical / Plumbing / Mechanical, Final Inspection. Schedule each through Town of Mountain View Building Department (administered by SAFEbuilt under contract) ((303) 450-8746).

Apply through Town of Mountain View Building Department (administered by SAFEbuilt under contract) at Mountain View Town Hall, 4176 Benton Street, Mountain View, CO 80212. Phone: (303) 450-8746, email: Buildingpermits@tomv.org. Office hours: Building division operates weekdays 8:00 a.m.-5:00 p.m. (Town's FAQ page prints this as '8:00 a.m. - 5:00 a.m.', which is evidently a typo for 5:00 p.m. given the Town Hall's own general business hours; noted honestly rather than silently corrected without flagging). Inspection request line (303) 450-8748 — call by 4:00 p.m. for next-business-day inspection. Town Hall main line (303) 421-7282.. Official information: https://www.tomv.org/building-department.

Mountain View, Colorado has adopted: 2021 International Residential Code (IRC) — referenced as the current adopted standard on the Town's 'Helpful Building Permit Handouts' page (page title/meta-description: 'Handouts developed by the Colorado Chapter of the International Code Council as a basic plan submittal under the 2021 International Residential Code') and cross-confirmed on the Town's own Building Permit Application (page 3, Homeowner Electrical/Plumbing certification): 'in accordance with the current edition of the National Electric Code, International Residential Code, and International Plumbing Code adopted by the Town of Mountain View as the minimum standard.'; National Electrical Code (NEC) — current edition, per the same Building Permit Application homeowner-certification language; the Town's live public-facing pages do not print the specific NEC year cycle (e.g. 2020 vs 2023) anywhere checked (Building Department page, Building Permits page, Handouts page, Application PDF) — noted as a gap rather than guessed.; International Plumbing Code (IPC), 2021 Edition — per the Town's own codified Municipal Code §18.08.010 ('International Plumbing Code adopted,' mountainview.municipal.codes/Code/18.8): 'The International Plumbing Code, 2021 Edition... is adopted by reference... The provisions of the International Plumbing Code shall apply to the construction of, and renovations or additions to, all commercial and residential buildings within the Town.' (Ord. 2024-07-15A §17; Ord. 2019-02-11F §1; Ord. 2010-7 §4). The Building Department's public-facing webpages do not print the specific year cycle; the Municipal Code's own codified Article 8 does.; An older page is still online from the Town's previous CivicLive-hosted site (mountainviewco.hosted.civiclive.com/services/building_department_/building_permits, and its townofmountainviewcolorado.org mirror) stating that 'The 2015 International Building Code is the official adopted reference for building codes and applicable to Mountain View, effective March 28, 2019.' That page predates the Town's current SAFEbuilt-administered site at tomv.org and its CommunityCore permitting system. Work from the Town's live Helpful Building Permit Handouts page, which references the 2021 IRC-based ICC Colorado Chapter guides, and confirm the adopted edition with the Building Department before designing to the older page.; The Town's Municipal Code Chapter 18 (Building Regulations, mountainview.municipal.codes/Code/18) adopts the following editions, each quoted directly from its codified section: International Fire Code (IFC), 2021 Edition — §18.05.010 ('The International Fire Code, 2021 Edition... is adopted by reference'; Ord. 2024-07-15A §11), further amended per West Metro Fire Protection District Resolution No. 2022-08 (§18.05.030). International Mechanical Code (IMC), 2021 Edition — §18.07.010 (Ord. 2024-07-15A §14; Ord. 2019-02-11E §1; Ord. 2010-7 §4). International Plumbing Code (IPC), 2021 Edition — §18.08.010 (Ord. 2024-07-15A §17; see also the dedicated IPC codesAdopted entry above). International Fuel Gas Code (IFGC), 2015 Edition — §18.11.010 ('The International Fuel Gas Code, 2015 Edition... is adopted by reference'; Ord. 2019-02-11H §1) — notably NOT bumped to 2021 by the Town's 2024-07-15A omnibus code-update ordinance, unlike every other International code family in Chapter 18; this lag is a real, confirmed feature of the Town's current code. International Existing Building Code (IEBC), 2021 Edition — §18.12.010 (Ord. 2024-07-15A §19; Ord. 2019-02-11G §1). International Energy Conservation Code (IECC), 2021 Edition — §18.045.010 (Ord. 2024-07-15A §9); see also the dedicated HB22-1362 entry below, which this same Article resolves. Every Article states its provisions 'shall apply to the construction of, and renovations or additions to, all commercial and residential buildings within the Town' (near-identical boilerplate in each Article), so none of these adopted codes are residential- or commercial-only carve-outs.; No IBC, IFC, IMC, IFGC, IECC, or IEBC edition is printed anywhere on the Town's live public-facing pages, its Building Permit Application, or its Use Tax Guidelines — Mountain View's public-facing materials are IRC/NEC/IPC-focused. The Town's Municipal Code Chapter 18 (Building Regulations, mountainview.municipal.codes/Code/18) does, however, include dedicated Articles for the IBC (Art. 4, 2021 Edition, Ord. 2024-07-15A/2019-02-11A/2010-7), IRC (Art. 13, 2021 Edition, Ord. 2024-07-15A/2019-02-11I), Fire Code (Art. 5), Mechanical Code (Art. 7), Fuel Gas Code (Art. 11), Existing Building Code (Art. 12), and Energy Conservation Code (Art. 4.5). The IBC and IRC edition years (2021) are confirmed from Articles 4 and 13; the specific edition years adopted in Articles 5/7/8/11/12/4.5 (covering the IFC, IMC, IFGC, IEBC, and IECC) are not stated in the Town's public-facing materials and are not recorded here rather than assumed — see the entry above for the confirmed figures.; The Town has taken its own HB22-1362 adoption action, codified directly in Municipal Code §18.045.010 (Article 4.5, Energy Conservation Code, mountainview.municipal.codes/Code/18.4.5): 'In addition to the IECC, the Town of Mountain View will also be adopting the Colorado Model Electric Ready and Solar Ready Code as required by State law under HB22-1362. These requirements will be in addition to those found in this Code.' (Ord. 2024-07-15A §9). The same Article's amendments (§18.045.020) further amend IECC Sections C401.2 and R401.2 to require commercial and residential buildings, respectively, to 'comply with the Colorado Model Electric Ready and Solar Ready Code.' The codified ordinance itself thus directly and specifically confirms the Town's HB22-1362 compliance action.; Superseded by the entry above; retained for the record. HB22-1362 (Colorado's statewide building energy code / greenhouse-gas-emissions law, requiring local governments to adopt an energy code and, per its later compliance milestones, the Colorado Electric and Solar Ready Code) is not mentioned anywhere on the Town's live Building Department, Building Permits, or Helpful Handouts pages. Given Mountain View's tiny size and thin published program (no separate energy-code page, no mechanical/energy-specific permit-type page), public sources do not establish whether the Town has taken its own HB22-1362 adoption action or is relying on some other mechanism; this is left unresolved rather than stated as fact either way.. Local amendments apply — see the Mountain View overview page for the full list.

Yes. The Town's Building Department FAQ explicitly lists basement finishes (along with kitchen and bathroom remodels) among projects that most people do not realize require a permit.

Sources & verification

Verified against official sources. Last reviewed 2026-08-02.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Mountain View building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Mountain View's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Mountain View yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Mountain View lands. Privacy.