Sign Permit — Grand Junction, Colorado · Requirements sheet
Verified 2026-08-13 · Source: https://ecode360.com/45358786
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Sign Permit in Grand Junction, Colorado
Grand Junction regulates signage under Grand Junction Municipal Code (GJMC) Chapter 21.10 (Sign Standards), part of Title 21 (Zoning), read in full via the City's eCode360-hosted code. No sign may be displayed in any zone district without a Sign Permit, except where the chapter expressly provides otherwise (signs placed by a governmental entity are exempt). A Sign Permit can only be obtained by a licensed sign contractor. The chapter was substantially rewritten by Ordinance 5190 (effective 12/20/2023) as part of the City's Zoning and Development Code repeal-and-replace.
Verified 2026-08-13 · Source
When you need this permit
- No sign may be displayed in any zone district without a Sign Permit, except where GJMC Chapter 21.10 expressly provides otherwise; signs placed by a governmental entity are exempt (§ 21.10.010)
- Only a licensed sign contractor can obtain a Sign Permit (§ 21.10.070(a)(3))
- Touching up, repainting, or changing existing letters/text/symbols/graphics is considered maintenance and repair and does not require a permit (§ 21.10.070(a)(2))
- Permit-exempt signs under § 21.10.030 include: one sign integral to or flush-mounted on a building, no greater than 4 sq ft; and non-illuminated, non-digital, non-permanent signs, limited to 6 signs per parcel under 1 acre (each ≤6 sq ft, except one may be up to 32 sq ft during active construction/subdivision development) or 6 signs per acre on larger parcels
- A banner permit is required prior to any use of wind-driven signs or banners; these may be displayed up to 30 consecutive days, up to 4 times per 12-month period, and must be secured directly to a permanently affixed structure (§ 21.10.040)
- No single sign may exceed 300 square feet in area regardless of zone-district allowances, and all exterior signs must be engineered to withstand a minimum wind load of 30 pounds per square foot (§ 21.10.070(a))
- Digital/electronic signs are capped at 0.3 footcandles over ambient light levels (measured 30 minutes after sunset/before sunrise per a distance table keyed to sign area) and must have photocell technology to auto-dim from dusk to dawn; interactive signs are prohibited entirely (§ 21.10.060, § 21.10.020(i))
- Prohibited signs include obscene content, imitation traffic-control signs/signals, portable/tent signs or non-mounted string lights (with a narrow shopping-area exception ≤12 sq ft/3 ft wide), signs placed on public right-of-way (except by a governmental entity), and interactive signs readable from the public right-of-way (§ 21.10.020)
- All existing on-site signage must be brought into conformance with the current Code before any new Sign Permit is approved for the property (§ 21.10.050(a))
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
See the full Grand Junction inspection guide — scheduling & re-inspection fees →
Tips
- Only licensed sign contractors can obtain a Sign Permit in Grand Junction — a property owner or general contractor cannot self-apply for most signage.
- If your property already has nonconforming signage, it must be brought into conformance with the current Code before the City will approve any NEW sign permit for that property — check existing signage compliance first.
- Digital/electronic sign brightness is capped at 0.3 footcandles over ambient light and measured against a distance table keyed to sign area (e.g., 30 ft for signs up to 10 sq ft, 150 ft for 200-300 sq ft signs) — budget for photocell auto-dimming technology and possible City re-inspection/recalibration at the permittee's expense.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Grand Junction building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Grand Junction
Sign Permit in other cities
Compare sign permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Grand Junction project checklist
Describe your project once and get every permit, document, and fee it triggers in Grand Junction — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →