How to schedule

Inspections are requested through the building department below.

Address
1101 Broad Street, Milliken, CO 80543 (Town Hall / Building Department); ProCode/SAFEbuilt regional office at 39 S. Parish Avenue, Suite 220, Johnstown, CO 80534
Phone
970-587-4331 (Town Hall / general inquiries); 970-652-5224 (Building Permit Tech / Community Development); 970-305-3161 ext. 1 (Inspections, ProCode/SAFEbuilt)
Office hours
Monday-Friday, 8 a.m. to 5 p.m., per the Town's Building Department page

Inspection sequence

Applies to: Residential Building Permit (New Construction / Any New Structure)

  1. 1

    Foundation

    Prior to backfill

  2. 2

    Structural/Framing Rough

    Framing complete before cover

  3. 3

    Electrical Rough / Mechanical Rough / Plumbing Rough

    Trade rough-ins before concealment

  4. 4

    Electrical Final / Mechanical Final / Plumbing Final

    Trade finals

  5. 5

    Certificate of Occupancy Inspection

    Final inspection; the Town states to allow up to one week for Final Certificate of Occupancy

Applies to: Residential Addition / Remodel Permit (including Basement Finish, Deck, Detached Garage)

  1. 1

    Structural/Framing Rough

    Framing complete before cover

  2. 2

    Electrical Rough / Mechanical Rough / Plumbing Rough

    Trade rough-ins, scope-dependent

  3. 3

    Electrical Final / Mechanical Final / Plumbing Final

    Trade finals

  4. 4

    Final Building

    All work complete per approved plans

Applies to: Residential Solar (PV) Permit

  1. 1

    Electrical Rough

    Conduit runs and wire sizing before cover

  2. 2

    Framing/Structural

    Verifies additional framing per the engineer's structural letter, where required

  3. 3

    Electrical Final

    System energized and verified

Applies to: Electrical Permit (Electrical Service Change), Electric Vehicle (EV) Charger Permit

  1. 1

    Electrical Rough

    Wiring and panel installed before concealment

  2. 2

    Electrical Final

    Devices installed, system energized

Applies to: Mechanical / HVAC Permit (Furnace, Air Conditioning, Gas Fireplace)

  1. 1

    Mechanical Rough

    Equipment/ductwork before concealment, where applicable

  2. 2

    Mechanical Final

    Equipment operational, venting verified

Applies to: Plumbing Permit (Water/Sewer Line Repair)

  1. 1

    Plumbing Rough

    Before concealment

  2. 2

    Plumbing Final

    Fixtures connected, system tested

Milliken building permits

Get alerts for Milliken

We'll email you when Milliken's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.