Skip to main content
PermitBase

Roofing Permit (Re-roofing) in Milliken, Colorado

Required for re-roofing in Milliken. Categorized as a 'Counter Permit' (24-72 hour approval). As of 1/1/2026, the Town requires Class 4 impact-resistant shingles for reroofs.

Verified 2026-07-06 · Source

When you need this permit

  • 'Re-roofing' is listed among the Town's Counter Permit categories
  • As of January 1, 2026, Class 4 shingles are required for roofs, per the Town's Building Department page
  • Roofing contractors must be registered with the Town of Milliken via CommunityCore

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Admin. FeeTown of Milliken Fee Schedule, effective May 1, 2026, Chapter 18, p.7 — no standalone flat roofing-permit fee line item was found published
10% of combined Building, Electrical, Construction Meter, and Plan Review fees

Review timeline

Plan reviewMilliken’s published plan-review target
0–3 business days

How long did your Roofing Permit (Re-roofing) permit actually take in Milliken?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Roof

    Completed roof covering verified against approved application, including Class 4 shingle compliance

See the full Milliken inspection guide — scheduling & re-inspection fees →

Tips

  • As of 1/1/2026, the Town requires Class 4 impact-resistant shingles for all reroofing — confirm this applies to your specific project before ordering materials.
  • Re-roofing is on the fast 24-72 hour 'Counter Permit' track.

Frequently asked questions

Yes. Re-roofing is listed as a 'Counter Permit' on the Town's Building Application Process page, with 24-72 hour approval, and as of 1/1/2026 the Town requires Class 4 shingles.

In Milliken, the published Building Permit Admin. Fee is: 10% of combined Building, Electrical, Construction Meter, and Plan Review fees. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Milliken's published plan-review target for a roofing permit (re-roofing) is 0–3 business days.

You'll need: Roofing Permit Application (CommunityCore). See the required-documents checklist on this page for details on each.

Milliken requires 1 inspection(s) for a roofing permit (re-roofing), in order: Final Roof. Schedule each through Town of Milliken Building Department (contracted operations administered by SAFEbuilt, formerly branded ProCode Inc.) (970-587-4331 (Town Hall / general inquiries); 970-652-5224 (Building Permit Tech / Community Development); 970-305-3161 ext. 1 (Inspections, ProCode/SAFEbuilt)).

Apply through Town of Milliken Building Department (contracted operations administered by SAFEbuilt, formerly branded ProCode Inc.) at 1101 Broad Street, Milliken, CO 80543 (Town Hall / Building Department); ProCode/SAFEbuilt regional office at 39 S. Parish Avenue, Suite 220, Johnstown, CO 80534. Phone: 970-587-4331 (Town Hall / general inquiries); 970-652-5224 (Building Permit Tech / Community Development); 970-305-3161 ext. 1 (Inspections, ProCode/SAFEbuilt), email: bldgdept@millikenco.gov (Building Department); COemail@safebuilt.com (SAFEbuilt general); jgesick@safebuilt.com and jogonzalez@safebuilt.com (Building Officials). Office hours: Monday-Friday, 8 a.m. to 5 p.m., per the Town's Building Department page. Official information: https://millikenco.gov/160/Building.

Milliken, Colorado has adopted: 2024 International Building Code (IBC) — Town of Milliken Inspections & Building Codes page, https://millikenco.gov/163/Inspections-Building-Codes; 2024 International Residential Code (IRC); 2024 International Existing Building Code (IEBC); 2024 International Fuel Gas Code (IFGC); 2024 International Property Maintenance Code (IPMC); 2024 International Mechanical Code (IMC); 2024 International Plumbing Code (IPC); 2024 International Swimming Pool and Spa Code (ISPSC); 2023 National Electrical Code (NEC); 2024 International Energy Conservation Code (IECC); 2024 International Fire Code (IFC); Code Amendments and Adopting — Ordinance No. 834 (adopted December 22, 2025), which brings the Town's codes into alignment with the respective 2024 ICC editions listed above; Milliken Municipal Code, Chapter 18 (Building Regulations). Local amendments apply — see the Milliken overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Milliken building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.