Required for tenant finish/tenant improvement work in existing commercial buildings in Milliken. The Town publishes a dedicated 'Commercial Permit Submissions (Tenant Finish)' submittal checklist (ProCode/SAFEbuilt) distinct from the new-commercial checklist, but tenant finishes share the same 'Commercial Permits' review tier (14-21 business days from full submittal) and the same Commercial/Industrial fee structure — the distinction is in submittal requirements, not a separate fee or timeline.

Verified 2026-08-02 · Source

When you need this permit

  • Submitted online via CommunityCore — tenant finishes are explicitly grouped with new commercial buildings and additions on the Building Application Process page
  • Plans must be designed and stamped by a Colorado Registered Architect; structural changes and MEP (mechanical, electrical, plumbing) work require an engineer's stamp, per the Town's Tenant Finish checklist
  • Planning Approval may be required prior to permit issuance, per the Tenant Finish checklist
  • Multi-family and all commercial projects require Front Range Fire Rescue approval (970-587-4464 ext. 105, Plans@frfr.co)
  • A Colorado licensed electrician and/or plumber must perform the work; all contractors must be licensed with the Town via CommunityCore Contractor
  • A ComCheck energy-code compliance report is required unless an alternative design is provided by the designer

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 8 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit FeeNo tenant-finish-specific fee line exists in the Fee Schedule; tenant finishes are charged under the same Chapter 18 commercial structure as other commercial permits
Valuation-based per the Town's 1997 UBC fee schedule
Plan Review — Commercial/IndustrialTown of Milliken Fee Schedule, effective May 1, 2026, Chapter 18, p.7 — the same Commercial/Industrial rate applies; there is no separate tenant-finish plan review rate
65% of Building Permit Fee; repeat submittal $100
Building Permit Admin. Fee
10% of combined Building, Electrical, Construction Meter, and Plan Review fees
Use Tax — Commercial (2.5%)Fee Schedule Section 18-1-20
2.5% of materials cost, or 50% of job valuation as determined by the Town using Building Standards Magazine

Review timeline

Plan reviewMilliken’s published plan-review target
14–21 business days

How long did your Commercial Tenant Improvement / Tenant Finish Permit permit actually take in Milliken?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Structural/Framing Rough

    New/altered framing before cover, where applicable

  2. 2

    Electrical Rough / Mechanical Rough / Plumbing Rough

    Trade rough-ins before concealment

  3. 3

    Electrical Final / Mechanical Final / Plumbing Final

    Trade finals

  4. 4

    Final / Certificate of Occupancy

    Final inspection before occupancy of the finished tenant space

See the full Milliken inspection guide — scheduling & re-inspection fees →

Tips

  • Tenant finish is a distinct published submittal track (its own ProCode/SAFEbuilt checklist with an architect-stamped code study and ComCheck requirement) but NOT a separately priced or separately timed permit — it shares the Commercial Permits 14-21 business day window and the Commercial/Industrial 65% plan review rate.
  • If the tenant finish includes a commercial kitchen, the Town publishes a separate additional Commercial Kitchen Submittal Checklist.
  • Planning Approval may be required before the building permit can be issued — confirm zoning/use compatibility with Community Development early, especially for a change of use (the Fee Schedule lists a $500 'Change of Use Review (Commercial w/no building alterations)' under the Land Use Code chapter).
  • Whether the per-square-foot commercial capital improvement fees (Public Facilities, Police Infrastructure, General Administration at $0.10/sq ft each) and street/drainage fees apply to a tenant finish within an existing shell — versus only to new construction — is not spelled out in the published Fee Schedule; confirm with the Building Department when budgeting a TI.

Frequently asked questions

Yes — the Town's Tenant Finish checklist states plans must be designed and stamped by a Colorado Registered Architect, with an engineer's stamp required for structural changes and MEP work.

In Milliken, the published Building Permit Fee is: Valuation-based per the Town's 1997 UBC fee schedule. Additional published fees: Plan Review — Commercial/Industrial — 65% of Building Permit Fee; repeat submittal $100; Building Permit Admin. Fee — 10% of combined Building, Electrical, Construction Meter, and Plan Review fees; Use Tax — Commercial (2.5%) — 2.5% of materials cost, or 50% of job valuation as determined by the Town using Building Standards Magazine. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Milliken's published plan-review target for a commercial tenant improvement / tenant finish permit is 14–21 business days.

You'll need: Commercial Building Permit Application (CommunityCore); Code Study; Framing Details; Interior Elevations; Floor Plan; Window and Door Schedules; Mechanical, Plumbing, and Electrical Plans; Energy Code Documentation (ComCheck). Depending on your project, Milliken may also ask for: Engineered Structural Plan. See the required-documents checklist on this page for details on each.

Milliken requires 4 inspection(s) for a commercial tenant improvement / tenant finish permit, in order: Structural/Framing Rough, Electrical Rough / Mechanical Rough / Plumbing Rough, Electrical Final / Mechanical Final / Plumbing Final, Final / Certificate of Occupancy. Schedule each through Town of Milliken Building Department (contracted operations administered by SAFEbuilt, formerly branded ProCode Inc.) (970-587-4331 (Town Hall / general inquiries); 970-652-5224 (Building Permit Tech / Community Development); 970-305-3161 ext. 1 (Inspections, ProCode/SAFEbuilt)).

Apply through Town of Milliken Building Department (contracted operations administered by SAFEbuilt, formerly branded ProCode Inc.) at 1101 Broad Street, Milliken, CO 80543 (Town Hall / Building Department); ProCode/SAFEbuilt regional office at 39 S. Parish Avenue, Suite 220, Johnstown, CO 80534. Phone: 970-587-4331 (Town Hall / general inquiries); 970-652-5224 (Building Permit Tech / Community Development); 970-305-3161 ext. 1 (Inspections, ProCode/SAFEbuilt), email: bldgdept@millikenco.gov (Building Department); COemail@safebuilt.com (SAFEbuilt general); jgesick@safebuilt.com and jogonzalez@safebuilt.com (Building Officials). Office hours: Monday-Friday, 8 a.m. to 5 p.m., per the Town's Building Department page. Official information: https://millikenco.gov/160/Building.

Milliken, Colorado has adopted: 2024 International Building Code (IBC) — Town of Milliken Inspections & Building Codes page, https://millikenco.gov/163/Inspections-Building-Codes; 2024 International Residential Code (IRC); 2024 International Existing Building Code (IEBC); 2024 International Fuel Gas Code (IFGC); 2024 International Property Maintenance Code (IPMC); 2024 International Mechanical Code (IMC); 2024 International Plumbing Code (IPC); 2024 International Swimming Pool and Spa Code (ISPSC); 2023 National Electrical Code (NEC); 2024 International Energy Conservation Code (IECC); 2024 International Fire Code (IFC); Code Amendments and Adopting — Ordinance No. 834 (adopted December 22, 2025), which brings the Town's codes into alignment with the respective 2024 ICC editions listed above; Milliken Municipal Code, Chapter 18 (Building Regulations). Local amendments apply — see the Milliken overview page for the full list.

Partly. The Town publishes a dedicated Tenant Finish submittal checklist (architect-stamped code study, MEP plans, ComCheck, etc.) that differs from the new-commercial checklist, but tenant finishes share the same Commercial Permits review tier (14-21 business days) and the same Commercial/Industrial fee structure — there is no separate tenant-finish fee or timeline.

Sources & verification

Verified against official sources. Last reviewed 2026-08-02.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Milliken building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Milliken.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.