Electric Vehicle (EV) Charger Permit in Milliken, Colorado

Milliken publishes no distinct EV-charger permit type, fee, or ordinance page. Colorado HB24-1173 (2024) requires counties with population 20,000+ and municipalities with population 10,000+ to adopt a streamlined EV-charging permit process by December 31, 2025; Milliken's population (approx. 8,400 at the 2020 Census, an estimated 9,400-9,700 in 2026) sits below the 10,000-population municipal threshold, so the Town is not confirmed to be legally required to have adopted a standalone EV-charging ordinance. A new circuit, outlet, or panel/service upgrade to serve an EV charger falls under the Town's standard 'Electrical Service Change' Counter Permit (24-72 hour approval) per the Building Application Process page.

Verified 2026-07-20 · Source

When you need this permit

  • A new circuit, outlet, or panel/service upgrade to serve an EV charger is permitted as an 'Electrical Service Change,' listed among the Town's Counter Permit categories (24-72 hour approval)
  • Electrical contractors must be registered with the Town of Milliken via CommunityCore and hold a current, active Colorado state electrical license
  • Homeowners may self-perform the work on their own residence via a notarized Homeowners Affidavit in lieu of hiring a licensed contractor Owner-builderContractor
  • No EV-specific application form, checklist, or expedited process distinct from the standard Electrical Service Change permit was found published

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical — Permits that do not require plan review but do require electrical work (applies to EV charger circuit/outlet)Town of Milliken Fee Schedule, effective May 1, 2026, Chapter 18 — no distinct EV-charger fee line exists; this is the general Counter Permit fee for standalone electrical work
$50.00
Building Permit Admin. FeeTown of Milliken Fee Schedule, effective May 1, 2026, Chapter 18
10% of combined Building, Electrical, Construction Meter, and Plan Review fees

Review timeline

Plan reviewTypical estimate — confirm current times with the Milliken building department
~0–3 business days

How long did your Electric Vehicle (EV) Charger Permit permit actually take in Milliken?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Rough

    Wiring and panel installed before concealment

  2. 2

    Electrical Final

    Devices installed, system energized

See the full Milliken inspection guide — scheduling & re-inspection fees →

Tips

  • There is no Milliken-specific 'EV charger permit' — a new circuit or outlet for EV charging falls under the standard 'Electrical Service Change' Counter Permit.
  • Colorado HB24-1173 required larger jurisdictions (counties 20,000+, municipalities 10,000+ population) to adopt a streamlined EV-charging permit ordinance by December 31, 2025; Milliken's population is estimated just under the 10,000 municipal threshold, so it is not confirmed to be covered by that mandate.
  • Confirm current requirements with the Building Department/SAFEbuilt before applying, since Milliken bills its base electrical fee 'According to State Regulations' for some categories.

Frequently asked questions

Milliken has not published EV-specific guidance, but a new electrical circuit or outlet to serve an EV charger would fall under the Town's standard 'Electrical Service Change' Counter Permit, with a $50.00 fee plus the 10% Building Permit Admin. Fee, per the Town of Milliken Fee Schedule effective May 1, 2026.

In Milliken, the published Electrical — Permits that do not require plan review but do require electrical work (applies to EV charger circuit/outlet) is: $50.00. Additional published fees: Building Permit Admin. Fee — 10% of combined Building, Electrical, Construction Meter, and Plan Review fees. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for an electric vehicle (ev) charger permit in Milliken typically runs 0–3 business days. This is an estimate, not a published figure — confirm current review times with Town of Milliken Building Department (contracted operations administered by SAFEbuilt, formerly branded ProCode Inc.) at 970-587-4331 (Town Hall / general inquiries); 970-652-5224 (Building Permit Tech / Community Development); 970-305-3161 ext. 1 (Inspections, ProCode/SAFEbuilt).

You'll need: Electrical Permit Application (CommunityCore). Depending on your project, Milliken may also ask for: Homeowners Affidavit. See the required-documents checklist on this page for details on each.

Milliken requires 2 inspection(s) for an electric vehicle (ev) charger permit, in order: Electrical Rough, Electrical Final. Schedule each through Town of Milliken Building Department (contracted operations administered by SAFEbuilt, formerly branded ProCode Inc.) (970-587-4331 (Town Hall / general inquiries); 970-652-5224 (Building Permit Tech / Community Development); 970-305-3161 ext. 1 (Inspections, ProCode/SAFEbuilt)).

Apply through Town of Milliken Building Department (contracted operations administered by SAFEbuilt, formerly branded ProCode Inc.) at 1101 Broad Street, Milliken, CO 80543 (Town Hall / Building Department); ProCode/SAFEbuilt regional office at 39 S. Parish Avenue, Suite 220, Johnstown, CO 80534. Phone: 970-587-4331 (Town Hall / general inquiries); 970-652-5224 (Building Permit Tech / Community Development); 970-305-3161 ext. 1 (Inspections, ProCode/SAFEbuilt), email: bldgdept@millikenco.gov (Building Department); COemail@safebuilt.com (SAFEbuilt general); jgesick@safebuilt.com and jogonzalez@safebuilt.com (Building Officials). Office hours: Monday-Friday, 8 a.m. to 5 p.m., per the Town's Building Department page. Official information: https://millikenco.gov/160/Building.

Milliken, Colorado has adopted: 2024 International Building Code (IBC) — Town of Milliken Inspections & Building Codes page, https://millikenco.gov/163/Inspections-Building-Codes; 2024 International Residential Code (IRC); 2024 International Existing Building Code (IEBC); 2024 International Fuel Gas Code (IFGC); 2024 International Property Maintenance Code (IPMC); 2024 International Mechanical Code (IMC); 2024 International Plumbing Code (IPC); 2024 International Swimming Pool and Spa Code (ISPSC); 2023 National Electrical Code (NEC); 2024 International Energy Conservation Code (IECC); 2024 International Fire Code (IFC); Code Amendments and Adopting — Ordinance No. 834 (adopted December 22, 2025), which brings the Town's codes into alignment with the respective 2024 ICC editions listed above; Milliken Municipal Code, Chapter 18 (Building Regulations). Local amendments apply — see the Milliken overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Milliken building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.