Inspection sequence, scheduling, and re-inspection fees for building permits in Idaho Falls, Idaho.

Verified 2026-07-03 · Source

How to schedule

Inspections are requested through the building department below.

Address
380 Constitution Way, P.O. Box 50220, Idaho Falls, ID 83405
Phone
208-612-8270
Office hours
Building Division, 380 Constitution Way, Idaho Falls, ID 83405 (mailing: P.O. Box 50220, Idaho Falls, ID 83405); main line 208-612-8270

Inspection sequence

Applies to: Residential Building Permit (New Construction)

  1. 1

    Footing

    Before concrete pour

  2. 2

    Foundation

    Foundation wall and rebar schedule verification

  3. 3

    Underground Plumbing

    Underground/under-slab plumbing before backfill or slab pour

  4. 4

    IF Power Trench

    Idaho Falls Power utility trench inspection for underground electrical service

  5. 5

    Wall Sheathing

    Structural wall sheathing before covering

  6. 6

    Mechanical, Electrical, and Plumbing Rough-In

    Combined MEP rough-in inspection

  7. 7

    Framing

    Structural framing complete before insulation/drywall

  8. 8

    Firestop

    Fire-resistant rated wall assemblies (Townhomes and Twinhomes)

  9. 9

    Insulation

    Insulation installed per energy code before drywall

  10. 10

    Drywall

    Drywall/fire-taping verification

  11. 11

    Electrical Service

    Electrical service inspection required before the utility will energize the service

  12. 12

    Final

    Combined Building, Mechanical, Electrical, Plumbing, Sidewalk, and Water Department final inspection

Applies to: Accessory Dwelling Unit (ADU) Permit

  1. 1

    Footing/Foundation

    For detached ADU construction, before concrete pour

  2. 2

    Framing

    Structural framing per approved plans

  3. 3

    Mechanical, Electrical, and Plumbing Rough-In

    Combined MEP rough-in for the ADU's independent systems

  4. 4

    Final

    Combined Building, Mechanical, Electrical, and Plumbing final inspection, including verification of the separate entrance and functional independence from the principal dwelling

Applies to: Residential Addition / Remodel Permit

  1. 1

    Footing/Foundation

    Required before concrete pour for additions, garages, and patio cover footings

  2. 2

    Framing

    Structural framing and connections to existing structure

  3. 3

    Mechanical, Electrical, and Plumbing Rough-In

    For additions/remodels affecting MEP systems

  4. 4

    Final

    Combined Building, Mechanical, Electrical, and Plumbing final inspection

Applies to: Electrical Permit

  1. 1

    Rough-In

    Wiring, box placement, and service connections before walls are closed

  2. 2

    Electrical Service

    Required before the utility (Idaho Falls Power) will energize the service

  3. 3

    Final

    Devices installed, panel labeled, protections verified per adopted NEC

Applies to: Plumbing Permit

  1. 1

    Underground Plumbing

    Before backfill or slab pour — verify pipe slope, materials, and cleanouts

  2. 2

    Rough-In

    After pipes installed, before walls closed

  3. 3

    Final

    All fixtures connected, no leaks, verified at combined Building/Mechanical/Electrical/Plumbing final

Applies to: Electric Vehicle (EV) Charger / EVSE Permit

  1. 1

    Rough-In

    Circuit, conduit, and disconnect placement before concealment, if applicable

  2. 2

    Final

    Charger mounted, circuit labeled, and installation verified per the adopted NEC (Article 625)

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In

    Ductwork per approved duct design; venting for exhaust fans/HVAC equipment; gas pressure verification; duct sealing; PVC vent pressure testing and labeling

  2. 2

    Final

    Equipment sizing matches approved duct design; all venting/registers/grills installed; gas equipment fully operational; air balance report uploaded; A/C equipment fully charged and connected

Applies to: Solar Photovoltaic (PV) Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, and disconnect placement before energizing

  2. 2

    Final

    Panel mounting, racking attachment, roof penetration sealing, electrical connections, and inverter interconnection verified

Final inspection only: Demolition Permit, Re-Roofing Permit

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Idaho Falls building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Idaho Falls building permits

Get alerts for Idaho Falls

We'll email you when Idaho Falls's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.