Commercial Building Permit (New Construction / Addition) in Idaho Falls, Idaho
Required for new commercial construction and additions to commercial buildings in Idaho Falls. Reviewed against the 2018 IBC and related commercial codes adopted by Idaho Falls City Code Title 7, with plan review handled by the City's dedicated Commercial Plans Examiner. Applications are submitted through the Cityworks online permitting portal.
Reviewed 2026-08-02 · Source
When you need this permit
- Building permit required for new commercial construction and additions per IBC Section 105.1 as adopted by the City
- A valid State of Idaho Building Contractors Registration Number and a valid City of Idaho Falls Class A or Class B Building Contractors license required prior to permit issuance, per the City's New Commercial Permit Submission Requirements Contractor
- Site plan showing the footprint of the structure, property lines, and setbacks (distance between structure and property line, other structures, and easements)
- Stamped architectural drawings including building elevations, wall sections, roof plans, building height, and required details
- Stamped engineered structural drawings (footing/foundation, framing, floor, roof details) and stamped engineered structural calculations
- Stamped engineered mechanical, plumbing, and electrical drawings, plus 2018 mechanical, electrical, and envelope COMcheck compliance documentation
- Engineered geotechnical soils report, when applicable
- Design criteria per the City's New Commercial Permit Submission Requirements: Ground Snow Load 47 lbs/SF; Wind Speed 90 MPH (3-sec. gust, 115 mph ultimate); Seismic Design Category D; Frost Line Depth 30 inches
- Governing codes listed on the City's submission-requirements sheet: 2018 IEBC (listed as "108 IEBC", apparent typo for 2018 IEBC given Idaho Falls City Code Title 7, Chapter 12 adopts the 2018 IEBC elsewhere in this record), 2018 IBC, 2017 Idaho State Plumbing Code, 2018 IFGC, 2018 IMC, 2017 NEC, 2018 IFC — note the listed "2017 NEC" appears not to reflect the City's more recent adoption of the 2023 NEC via Ordinance 3627 (effective 9-11-2025, per Idaho Falls City Code § 7-8-1 and the City's Electrical page); confirm current NEC edition with the Building Division before design
- Apply through the Cityworks portal
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
City of Idaho Falls Fee Schedule (October 2025), item 3.1.g, under Fire Department International Fire Code Permits and Fees. Show full citationHide
City of Idaho Falls Fee Schedule (October 2025), item 3.1.g, under Fire Department International Fire Code Permits and Fees. This is a separate Fire Department review fee distinct from the Community Development Services Commercial Plan Check Fee (item 2.8.b); the Fee Schedule does not specify which commercial occupancies/project types trigger it — confirm applicability with Fire Prevention before budgetingReview timeline
Inspection process
- 1
Footing
Before concrete pour
- 2
Foundation
Foundation wall and rebar schedule verification
- 3
Underground / Groundwork Plumbing
Underground/under-slab plumbing before backfill or slab pour; "Plumbing Groundwork Inspection" is a named inspection type in the City's Cityworks system
- 4
Wall Sheathing / Framing
Structural framing and wall sheathing before covering
- 5
Mechanical, Electrical, and Plumbing Rough-In
Combined MEP rough-in inspection; "Electrical Temporary Service Inspection" and "Electrical Trench Inspection" are named inspection types in the City's Cityworks system
- 6
Fire Alarm / Fire Sprinkler (if applicable)
Required for occupancies with fire alarm or fire sprinkler systems, reviewed and inspected per Fire Department Fee Schedule items 3.1.h-3.1.k
- 7
Insulation
Insulation installed per energy code before drywall
- 8
Drywall
Drywall/fire-taping verification, including fire-rated assemblies
- 9
Final
Combined Building, Mechanical, Electrical, and Plumbing final inspection
See the full Idaho Falls inspection guide — scheduling & re-inspection fees →
Tips
- This inspection sequence is the generic construction sequence under the adopted 2018 IBC plus named inspection types confirmed from the City's own Cityworks 'How to Schedule an Inspection' guide — Idaho Falls has not published a distinct, itemized commercial inspection checklist separate from this general sequence; confirm the exact required inspection list for a specific project through Cityworks once the permit is issued.
- The Commercial Plan Check Fee is 65% of the permit valuation (item 2.8.b) versus 25% for residential (item 2.8.a) — budget for a materially higher plan-review cost load on commercial projects.
- A City of Idaho Falls Class A or Class B Building Contractor license (in addition to State of Idaho Building Contractor Registration) is required before a commercial building permit will be issued — there is no owner-builder exception for commercial projects as there is for a homeowner's own single-family residence. Owner-builderContractor
- Dave Burt is listed as the City's dedicated Commercial Plans Examiner (208-612-8275), a distinct staff role from residential plan review, per the City's Building Division staff directory.
- Separate Fire Department review and fees (International Fire Code Permits and Fees, Fee Schedule Section 3.1) apply in addition to the Community Development Services building permit fees — budget for these separately when the project involves fire alarm, fire sprinkler, or fire pump systems.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-02.
Fee schedules
Checklists & handouts
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Idaho Falls building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Idaho Falls.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Idaho Falls's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Idaho Falls yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Idaho Falls lands. Privacy.
Other permits in Idaho Falls
Commercial Building Permit (New Construction / Addition) in other cities
Compare commercial building permit (new construction / addition) fees across Idaho →
Look up this fee in a different city →
Now live
Build your Idaho Falls project checklist
Describe your project once and get every permit, document, and fee it triggers in Idaho Falls — in one checklist. Free, for any city and any number of projects.
Get started →