Jerome building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Jerome, Idaho.
Verified 2026-07-13 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 152 East Avenue A, Jerome, ID 83338
- Phone
- 208-324-8189
- Office hours
- Monday - Thursday, 8:00 a.m. to 5:00 p.m., excluding observed holidays. Building Official: Kortnie Kent, office (208) 324-8189 ext. 131, cell (208) 749-4971. Inspections requested by calling (208) 324-8189 ext. 131 or via the Cloudpermit portal, ordinarily performed 8:00 a.m.-5:00 p.m. Monday-Thursday.
- Website
- Official site
Inspection sequence
Applies to: Residential Building Permit
- 1
Setbacks/Footings/Foundation Wall
Foundation and footing placement verified against approved plans and property setbacks; concrete inspections are given scheduling priority
- 2
Floor Framing / Shear Wall
Floor framing and shear wall inspection prior to enclosing structural elements
- 3
Rough-In (Electrical, Mechanical, Plumbing)
Electrical, mechanical, and plumbing rough-in inspections are performed by Idaho DOPL (not the City); DOPL rough-in sign-off is required before the City's framing inspection can be requested
- 4
Framing
Requested after DOPL rough-ins are signed off and windows/doors are sealed
- 5
Insulation
Insulation inspection prior to drywall/finish cover
- 6
Final (Building, plus DOPL Electrical/Mechanical/Plumbing finals)
All final inspections (building final from the City; electrical/mechanical/plumbing finals from DOPL) must be complete before Certificate of Occupancy is processed
Applies to: Commercial Building Permit
- 1
Footing/Foundation
Foundation and footing placement verified against approved plans; concrete inspections given scheduling priority
- 2
Rough-In (Electrical, Mechanical, Plumbing via DOPL)
Trade rough-ins performed by Idaho DOPL; must be signed off before the City's framing inspection
- 3
Framing
Requested after DOPL rough-ins are signed off
- 4
Final
Building final from the City plus DOPL trade finals required before Certificate of Occupancy
Applies to: Electric Vehicle (EV) Charger / EVSE Permit
- 1
Rough-In (DOPL)
Circuit, conduit, and disconnect placement before concealment, if applicable -- performed by Idaho DOPL inspectors
- 2
Final (DOPL)
Charger mounted, circuit labeled, and installation verified per the 2023 NEC as administered by DOPL
Applies to: Electrical / HVAC / Plumbing Permit (DOPL-Administered)
- 1
Rough-In (DOPL)
Performed by Idaho DOPL inspectors; must be signed off before the City of Jerome's own framing inspection can be requested on the same project
- 2
Final (DOPL)
Performed by Idaho DOPL inspectors; required before the City's Certificate of Occupancy is issued
Applies to: Factory Built Structures / Manufactured Home Permit
- 1
Foundation/Set
Foundation system, tie-downs, and home placement inspected
- 2
Final
Utility connections, stairs, and landings verified complete
Applies to: Solar Photovoltaic (PV) Installation Permit
- 1
Framing/Structural (Racking Attachment)
Roof or ground-mount racking attachment and structural connections verified by City Building Safety
- 2
Electrical Interconnection (DOPL)
Performed by the State of Idaho Division of Occupational and Professional Licensing, not the City, per the City's standing DOPL partnership for electrical trade work
Final inspection only: Demolition Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Jerome building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Jerome building permits