Residential Building Permit in Jerome, Idaho

Required for new construction, additions, and other building work on one- and two-family dwellings within Jerome city limits. Reviewed against the 2018 IRC (Parts I, II, III and IX) and 2018 IECC with Idaho amendments as locally administered by the City of Jerome Building Safety Department. Applications are submitted online through the Cloudpermit portal.

Verified 2026-07-13 · Source

When you need this permit

  • Building permit required for new structures over 120 square feet, additions, and other construction affecting structure or life-safety systems
  • Plans designed to the 2018 IRC (Parts I, II, III, IX) and 2018 IECC with Idaho amendments (2020 Edition)
  • Application submitted online via Cloudpermit.com; include plans, a site plan, and other project-specific documents
  • Declared project value must reflect total value of construction work including labor, materials, and contractor profit; the Building Official may apply the current ICC Building Valuation Data Table if declared value appears understated
  • Permit expires if work does not start within 180 days, is abandoned for 180 days, or 180 days from the last recorded inspection
  • Homeowners may self-permit work on their own primary residence

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — valuation $1 to $500Per application. City of Jerome Master City-Wide Fee Schedule
$23.50
Building Permit Fee — valuation $501 to $2,000City of Jerome Master City-Wide Fee Schedule
$23.50 for the first $500, plus $3.05 for each additional $100 or fraction thereof
Building Permit Fee — valuation $2,001 to $25,000City of Jerome Master City-Wide Fee Schedule
$69.25 for the first $2,000, plus $14.00 for each additional $1,000 or fraction thereof
Building Permit Fee — valuation $25,001 to $50,000City of Jerome Master City-Wide Fee Schedule
$391.75 for the first $25,000, plus $10.10 for each additional $1,000 or fraction thereof
Building Permit Fee — valuation $50,001 to $100,000City of Jerome Master City-Wide Fee Schedule
$643.75 for the first $50,000, plus $7.00 for each additional $1,000 or fraction thereof
Building Permit Fee — valuation $100,001 to $500,000City of Jerome Master City-Wide Fee Schedule
$993.75 for the first $100,000, plus $5.60 for each additional $1,000 or fraction thereof
Building Permit Fee — valuation $500,001 to $1,000,000City of Jerome Master City-Wide Fee Schedule
$3,233.75 for the first $500,000, plus $4.75 for each additional $1,000 or fraction thereof
Building Permit Fee — valuation $1,000,001 to $5,000,000City of Jerome Master City-Wide Fee Schedule
$5,608.75 for the first $1,000,000, plus $3.65 for each additional $1,000 or fraction thereof
Building Permit Fee — valuation $5,000,001 to $10,000,000City of Jerome Master City-Wide Fee Schedule
$20,208.75 for the first $5,000,000, plus $2.75 for each additional $1,000 or fraction thereof
Building Permit Fee — valuation $10,000,001 and upCity of Jerome Master City-Wide Fee Schedule
$33,958.75 for the first $10,000,000, plus $2.00 for each additional $1,000 or fraction thereof
Residential Plan Review FeeCity of Jerome Master City-Wide Fee Schedule
40% of the building permit fee
Additional Plan Review FeeFor all change orders, additions, or revisions requiring a review. City of Jerome Master City-Wide Fee Schedule
$47.00
Re-inspection FeeCity of Jerome Master City-Wide Fee Schedule
$47.00
Inspection Outside of Business HoursCity of Jerome Master City-Wide Fee Schedule
$47.00 per hour, minimum 1 hour
Work Without a PermitCity of Jerome Master City-Wide Fee Schedule
Double the required permit fee

Review timeline

Plan reviewJerome’s published plan-review target
5–10 business days

How long did your Residential Building Permit permit actually take in Jerome?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Setbacks/Footings/Foundation Wall

    Foundation and footing placement verified against approved plans and property setbacks; concrete inspections are given scheduling priority

  2. 2

    Floor Framing / Shear Wall

    Floor framing and shear wall inspection prior to enclosing structural elements

  3. 3

    Rough-In (Electrical, Mechanical, Plumbing)

    Electrical, mechanical, and plumbing rough-in inspections are performed by Idaho DOPL (not the City); DOPL rough-in sign-off is required before the City's framing inspection can be requested

  4. 4

    Framing

    Requested after DOPL rough-ins are signed off and windows/doors are sealed

  5. 5

    Insulation

    Insulation inspection prior to drywall/finish cover

  6. 6

    Final (Building, plus DOPL Electrical/Mechanical/Plumbing finals)

    All final inspections (building final from the City; electrical/mechanical/plumbing finals from DOPL) must be complete before Certificate of Occupancy is processed

See the full Jerome inspection guide — scheduling & re-inspection fees →

Tips

  • Residential plan review typically takes 5-10 business days per the City's published FAQ processing times, depending on project complexity. Note: the City's separate Plan Review Information page states a longer 'first review' goal of 2-4 weeks for residential plans, which is not reconciled with the FAQ figure -- see reviewTimelineNote for both exact quotes.
  • Certificate of Occupancy is processed in the order received and can take up to 3 business days for return after final inspections pass.
  • Inspections ordinarily occur 8:00 a.m.-5:00 p.m. Monday-Thursday (not Friday); schedule via Cloudpermit.com or by calling (208) 324-8189 ext. 131 with the permit number ready.
  • Electrical, HVAC/mechanical, and plumbing permits and inspections in Jerome are handled by Idaho DOPL, not the City of Jerome Building Safety Department -- apply separately through DOPL's system for those trades.

Frequently asked questions

Jerome requires a residential building permit for: Building permit required for new structures over 120 square feet, additions, and other construction affecting structure or life-safety systems; Plans designed to the 2018 IRC (Parts I, II, III, IX) and 2018 IECC with Idaho amendments (2020 Edition); Application submitted online via Cloudpermit.com; include plans, a site plan, and other project-specific documents; Declared project value must reflect total value of construction work including labor, materials, and contractor profit; the Building Official may apply the current ICC Building Valuation Data Table if declared value appears understated; Permit expires if work does not start within 180 days, is abandoned for 180 days, or 180 days from the last recorded inspection; Homeowners may self-permit work on their own primary residence. If your project isn't listed, confirm with City of Jerome Building Safety Department at 208-324-8189 before starting work.

In Jerome, the published Building Permit Fee — valuation $1 to $500 is: $23.50. Additional published fees: Building Permit Fee — valuation $501 to $2,000 — $23.50 for the first $500, plus $3.05 for each additional $100 or fraction thereof; Building Permit Fee — valuation $2,001 to $25,000 — $69.25 for the first $2,000, plus $14.00 for each additional $1,000 or fraction thereof; Building Permit Fee — valuation $25,001 to $50,000 — $391.75 for the first $25,000, plus $10.10 for each additional $1,000 or fraction thereof; Building Permit Fee — valuation $50,001 to $100,000 — $643.75 for the first $50,000, plus $7.00 for each additional $1,000 or fraction thereof; Building Permit Fee — valuation $100,001 to $500,000 — $993.75 for the first $100,000, plus $5.60 for each additional $1,000 or fraction thereof; Building Permit Fee — valuation $500,001 to $1,000,000 — $3,233.75 for the first $500,000, plus $4.75 for each additional $1,000 or fraction thereof; Building Permit Fee — valuation $1,000,001 to $5,000,000 — $5,608.75 for the first $1,000,000, plus $3.65 for each additional $1,000 or fraction thereof; Building Permit Fee — valuation $5,000,001 to $10,000,000 — $20,208.75 for the first $5,000,000, plus $2.75 for each additional $1,000 or fraction thereof; Building Permit Fee — valuation $10,000,001 and up — $33,958.75 for the first $10,000,000, plus $2.00 for each additional $1,000 or fraction thereof; Residential Plan Review Fee — 40% of the building permit fee; Additional Plan Review Fee — $47.00; Re-inspection Fee — $47.00; Inspection Outside of Business Hours — $47.00 per hour, minimum 1 hour; Work Without a Permit — Double the required permit fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Typical processing time is 5-10 business days for residential projects, depending on project complexity, per the City of Jerome FAQ page. Source: City of Jerome, FAQ, https://www.ci.jerome.id.us/378/FAQ.

You'll need: Cloudpermit Online Application; Construction Drawings. See the required-documents checklist on this page for details on each.

Jerome requires 6 inspection(s) for a residential building permit, in order: Setbacks/Footings/Foundation Wall, Floor Framing / Shear Wall, Rough-In (Electrical, Mechanical, Plumbing), Framing, Insulation, Final (Building, plus DOPL Electrical/Mechanical/Plumbing finals). Schedule each through City of Jerome Building Safety Department (208-324-8189).

Apply through City of Jerome Building Safety Department at 152 East Avenue A, Jerome, ID 83338. Phone: 208-324-8189, email: kkent@cityofjerome.org. Office hours: Monday - Thursday, 8:00 a.m. to 5:00 p.m., excluding observed holidays. Building Official: Kortnie Kent, office (208) 324-8189 ext. 131, cell (208) 749-4971. Inspections requested by calling (208) 324-8189 ext. 131 or via the Cloudpermit portal, ordinarily performed 8:00 a.m.-5:00 p.m. Monday-Thursday.. Official information: https://www.ci.jerome.id.us/153/Building-Safety-Code-Enforcement.

Jerome, Idaho has adopted: Idaho Building Code Act (Idaho Code Title 39, Chapter 41) makes building code standards a matter of statewide concern; local governments that issue building permits and perform code enforcement must adopt the International Building Code and Idaho Residential Code (Parts I-III and IX) and the Idaho Energy Conservation Code as amended by the Idaho Building Code Board through negotiated rulemaking. Source: Idaho Legislature, Idaho Code Title 39 Chapter 41 (39-4116), https://legislature.idaho.gov/statutesrules/idstat/title39/t39ch41/; 2018 International Building Code (IBC), with Idaho amendments, locally administered and enforced by the City of Jerome Building Safety Department for commercial construction within city limits. Source: City of Jerome, Building Codes & Design Criteria, https://www.ci.jerome.id.us/352/Building-Codes-Statues-and-Design-Criter; 2018 International Residential Code (IRC), Parts I, II, III and IX, with Idaho State amendments (2020 Edition), locally administered by the City of Jerome for one- and two-family dwellings and townhouses within city limits. Source: City of Jerome, Building Codes & Design Criteria; 2018 International Energy Conservation Code (IECC), with Idaho State amendments (2020 Edition), locally administered by the City of Jerome. Source: City of Jerome, Building Codes & Design Criteria; 2018 International Existing Building Code, locally administered by the City of Jerome. Source: City of Jerome, Building Codes & Design Criteria; 2018 International Mechanical Code and 2018 International Fuel Gas Code, locally administered by the City of Jerome. Source: City of Jerome, Building Codes & Design Criteria; 2023 National Electrical Code (NEC), with amendments. Source: City of Jerome, Building Codes & Design Criteria; 2017 Idaho State Plumbing Code, based on the 2015 Uniform Plumbing Code. Source: City of Jerome, Building Codes & Design Criteria; 2018 International Fire Code, administered by the Idaho State Fire Marshal (not the City of Jerome). Source: City of Jerome, Building Codes & Design Criteria; The City of Jerome Building Safety Department issues and inspects general building permits directly within city limits, but has partnered with the Idaho Division of Occupational and Professional Licensing (DOPL) for electrical, HVAC/mechanical, and plumbing permits and inspections rather than administering those trades itself -- distinct from the City of Twin Falls model, where the city runs its own MEP program. Source: City of Jerome, HVAC, Electrical & Plumbing Permits page ('The City of Jerome is proud to partner with The State of Idaho Division of Occupational & Professional Licensing for all Electrical, HVAC and/or Plumbing permits'), https://www.ci.jerome.id.us/354/HVAC-Electrical-Plumbing-Permits, cross-checked against City of Jerome Inspections page noting framing inspections require completed DOPL rough-ins, https://www.ci.jerome.id.us/359/Inspections; This CITY of Jerome Building Safety Department (issuing permits for property within Jerome city limits, via Cloudpermit.com) is a distinct department and permitting authority from the Jerome County Building Department (which serves unincorporated Jerome County and any cities under interlocal/IGA agreement, https://www.jeromecountyid.us/158/Building-Department) -- the two maintain separate permit systems, applications, and fee schedules.. Local amendments apply — see the Jerome overview page for the full list.

The State of Idaho Division of Occupational and Professional Licensing (DOPL) handles electrical, HVAC, and plumbing permits and inspections in Jerome under a partnership with the City; the City of Jerome Building Safety Department issues and inspects the general building permit. Source: City of Jerome, HVAC, Electrical & Plumbing Permits page, https://www.ci.jerome.id.us/354/HVAC-Electrical-Plumbing-Permits.

Sources & verification

Verified against official sources. Last reviewed 2026-07-13.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Jerome building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.