Electric Vehicle (EV) Charger / EVSE Permit — Jerome, Idaho · Requirements sheet
Verified 2026-07-20 · Source: https://www.ci.jerome.id.us/354/HVAC-Electrical-Plumbing-Permits
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electric Vehicle (EV) Charger / EVSE Permit in Jerome, Idaho
The City of Jerome does not issue electrical permits at all -- like all electrical, HVAC/mechanical, and plumbing work, EV charger/EVSE circuit installation is permitted and inspected by the Idaho Division of Occupational and Professional Licensing (DOPL) under the City's standing partnership arrangement, not by the City of Jerome Building Safety Department. No dedicated EV charger/EVSE fee category exists in IDAPA 24.39.10 (Rules of the Idaho Electrical Board) either, nor on the City of Jerome's Fees page or Master City-Wide Fee Schedule -- an EV charger circuit added to an existing residence is billed under the flat $65 Existing Residential Dwelling Unit Permit fee, while a commercial or multi-family installation is billed under the Other Installation (Including Industrial and Commercial) Permit's wiring-cost-tiered schedule, both confirmed directly against DOPL's own published electrical board rules (the same statewide schedule verified for Idaho City, ID in this same research pass). A City of Jerome building permit is separately required only if the installation includes a structural/mounting element (e.g., a charger pedestal or canopy).
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit for the EV charger circuit is obtained through Idaho DOPL, not the City of Jerome or Cloudpermit
- Governed by the 2023 NEC as administered by DOPL, including NEC Article 625 (Electric Vehicle Charging System) provisions
- If a structural element (pedestal, canopy, or similar) is installed, a separate City of Jerome building permit is required for that portion, submitted via Cloudpermit, with the fee based on declared project value per the City's standard valuation approach (the same approach the City uses for solar installations, since ICC valuation data does not cover this type of work)
- DOPL rough-in sign-off is a prerequisite for the City's own framing inspection if the project also requires a City building permit for a structural element
- Contact Idaho DOPL directly for the current electrical permit fee; contact the City of Jerome Building Safety Department (208-324-8189) for any structural-element building permit fee
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In (DOPL)
Circuit, conduit, and disconnect placement before concealment, if applicable -- performed by Idaho DOPL inspectors
- 2
Final (DOPL)
Charger mounted, circuit labeled, and installation verified per the 2023 NEC as administered by DOPL
See the full Jerome inspection guide — scheduling & re-inspection fees →
Tips
- The City of Jerome itself does not issue electrical permits of any kind, including for EV chargers -- you must go through Idaho DOPL directly, the same as for any other electrical work in the city.
- If your installation is a simple wall-mounted charger on an existing structure with no new structural element, only the DOPL electrical permit applies; a separate City building permit is only needed if you are adding a structural element like a pedestal or canopy.
- The City's Fees page notes that solar installation permit fees are based on the submitted project value directly (since ICC valuation data doesn't cover that type of work) -- the same value-based approach would likely apply to any structural EV-charger element requiring a City building permit, though this has not been explicitly confirmed by the City for EV charging equipment specifically.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Jerome building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Jerome
Electric Vehicle (EV) Charger / EVSE Permit in other cities
Compare electric vehicle (ev) charger / evse permit fees across Idaho →
Look up this fee in a different city →
Related guides
Now live
Build your Jerome project checklist
Describe your project once and get every permit, document, and fee it triggers in Jerome — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →