How to schedule

Inspections are requested through the building department below.

Address
8047 W Main Street #2, Rathdrum, ID 83858
Phone
(208) 687-7242 (Building Department)
Office hours
Monday through Friday, 8:00 a.m. to 5:00 p.m. (published on the Community Development contact block). Applications are submitted electronically through the BS&A Online portal (bsaonline.com/?uid=2897); the City's own checklists state no hard copy or emailed submittals are accepted.

Inspection sequence

Applies to: Change of Occupancy / Tenant Improvement Permit

  1. 1

    Building Department Courtesy Site Visit

    Pre-application visit to classify the project as Same Occupancy, Minor Change, or Major Change; determines the remainder of the review/permit path

  2. 2

    Construction Inspections (as applicable)

    Required inspections and approvals for any permitted building/mechanical/sign work performed under a Minor or Major Change permit

  3. 3

    Final / Certificate of Occupancy

    Certificate of Occupancy issued once required inspections and approvals are complete and, for Same Occupancy/Minor Change, the permit invoice is paid; for Major Change, any finalizations are also submitted on the Regulatory Compliance Form

Applies to: Commercial Building Permit (New Construction / Addition or Alteration)

  1. 1

    Foundation/Footing

    Before concrete pour, per 2018 IBC and City Design Criteria (24-inch minimum frost depth); new construction only

  2. 2

    Framing

    Structural framing per approved plans

  3. 3

    Final

    All work complete per approved plans; requires signed Owner/Lessee Consent for Required Permit Inspections

Applies to: Residential Addition or Alteration Permit

  1. 1

    Footing/Foundation

    Required before concrete pour for new footings

  2. 2

    Framing

    Structural framing and connection to the existing structure

  3. 3

    Final

    All work complete per approved plans

Applies to: Residential Single Family Building Permit (New Construction)

  1. 1

    Foundation/Footing

    Before concrete pour, per 2018 IRC and City Design Criteria (24-inch minimum frost depth)

  2. 2

    Framing

    Structural framing per approved plans

  3. 3

    Final

    All work complete per approved plans; requires signed Owner/Lessee Consent for Required Permit Inspections

Applies to: Solar PV Permit (City Building Permit + State-Issued Electrical)

  1. 1

    Electrical Rough-In (DOPL-inspected)

    Grounding and listing of all components verified before the system is covered or energized

  2. 2

    Electrical Final (DOPL-inspected)

    Wiring methods, labeling at the shut-off, working clearances, and system operation verified

  3. 3

    Building Final (City-inspected)

    Roof-mounting and structural attachment verified against approved plans; requires signed Owner/Lessee Consent for Required Permit Inspections

Applies to: Electrical Permit (State-Issued — Idaho DOPL, not the City)

  1. 1

    Rough-In (DOPL-inspected)

    Wiring and box placement before walls are closed, performed by a State of Idaho DOPL inspector

  2. 2

    Final (DOPL-inspected)

    Devices installed, panel labeled, protections verified per NEC

Applies to: EV Charging Station Permit (State-Issued Electrical Permit)

  1. 1

    Electrical Rough-In (if applicable)

    Required only if new circuit wiring is enclosed before final; conduit runs, wire sizing, and grounding verified (DOPL electrical inspection)

  2. 2

    Electrical Final

    EVSE circuit breaker sizing, GFCI protection (where applicable), working clearances, and charger mounting verified against NEC Article 625 (DOPL electrical inspection)

Applies to: Plumbing Permit (State-Issued — Idaho DOPL, not the City)

  1. 1

    Rough-In (DOPL-inspected)

    Pipe placement and slope verification before walls/slab are closed, performed by a State of Idaho DOPL inspector

  2. 2

    Final (DOPL-inspected)

    Fixtures connected, no leaks

Applies to: Residential Mechanical / HVAC Permit

  1. 1

    Rough-In

    Ductwork and mechanical equipment rough-in before walls closed

  2. 2

    Final

    Equipment operational per approved plans; requires signed Owner/Lessee Consent for Required Permit Inspections

Final inspection only: Demolition Permit

Rathdrum building permits

Get alerts for Rathdrum

We'll email you when Rathdrum's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.