Solar PV Permit (City Building Permit + State-Issued Electrical) in Rathdrum, Idaho
Required for installation of rooftop or ground-mounted solar photovoltaic systems within Rathdrum city limits. The structural/roof-mounting scope requires a City of Rathdrum Building Permit (the City's normal building-permit process, since no dedicated solar line item is published in its Master Fee Schedule). The electrical-connection scope is NOT issued by the City — like all electrical work in Rathdrum, it is permitted directly by the State of Idaho Division of Occupational and Professional Licenses (DOPL), since Rathdrum offers Building and Mechanical permits through its own portal but does not offer electrical permits at all.
Verified 2026-07-20 · Source
When you need this permit
- Structural/roof-mounting scope: submit a City of Rathdrum Building Permit Application via the BS&A Online portal (bsaonline.com/?uid=2897), with professionally stamped Building Plans, Structural Calculations, and Structural Plans as required for any structure over 200 sq ft or any roof-load-bearing modification
- Electrical-connection scope: apply directly through Idaho DOPL (dopl.idaho.gov or (208) 334-3233) — not through the City's BS&A portal, since no electrical checklist or application exists among Rathdrum's published Building Department forms
- Electrical work must be performed by an Idaho-licensed electrical contractor whose electrician holds (or is supervised by someone holding) the Solar Photovoltaic limited electrical license category (NABCEP certification or equivalent required), per IDAPA 24.39.10.153.09
- Grid-tied renewable energy systems require a mandatory DOPL electrical plan review before the installation permit can be purchased
- Signed Owner/Lessee Consent for Required Permit Inspections form required on the City Building Permit application as of 6/23/2026, per the Idaho Property Rights Protection Act
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Rough-In (DOPL-inspected)
Grounding and listing of all components verified before the system is covered or energized
- 2
Electrical Final (DOPL-inspected)
Wiring methods, labeling at the shut-off, working clearances, and system operation verified
- 3
Building Final (City-inspected)
Roof-mounting and structural attachment verified against approved plans; requires signed Owner/Lessee Consent for Required Permit Inspections
See the full Rathdrum inspection guide — scheduling & re-inspection fees →
Tips
- Like electrical work generally in Rathdrum, the electrical connection scope of a solar install is NOT available through the City's BS&A Online portal at all — apply directly through Idaho DOPL at dopl.idaho.gov or (208) 334-3233.
- The structural/roof-mounting scope still goes through the City's standard Building Permit process — confirm with the Building Department, (208) 687-7242, what fee will actually be charged, since the City's per-square-foot formula and Setting Permit flat fee were not built with solar racking in mind.
- Because grid-tied systems require a passing DOPL plan review before the installation permit itself can be purchased, budget the plan-review fee ($65/hour, one-hour minimum) and lead time separately from the City building-permit process.
- A contractor performing the electrical installation must hold Idaho's Solar Photovoltaic limited electrical license category (NABCEP certification or equivalent), per the Idaho Electrical Board's own rules.
- DOPL fee schedule figures independently re-confirmed 2026-07-20 directly against the current IDAPA 24.39.10 administrative rule PDF (adminrules.idaho.gov/rules/current/24/243910.pdf), Rule 500.02.b/f — figures unchanged since prior verification.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Rathdrum building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Rathdrum
Solar PV Permit (City Building Permit + State-Issued Electrical) in other cities
Compare solar pv permit (city building permit + state-issued electrical) fees across Idaho →
Look up this fee in a different city →
Now live
Build your Rathdrum project checklist
Describe your project once and get every permit, document, and fee it triggers in Rathdrum — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →