EV Charging Station Permit (State-Issued Electrical Permit) in Rathdrum, Idaho

Required for installation of a Level 2 (or higher) electric vehicle charging station/EVSE within the City of Rathdrum. Rathdrum has no local electrical-permitting program: the electrical-connection scope is permitted directly by the Idaho Division of Occupational and Professional Licenses (DOPL), the same statewide mechanism this file's solar-pv-permit entry documents. No separate City building permit is required for a standalone EVSE install unless it triggers a service/panel upgrade or a new structure, in which case the City's Master Fee Schedule building-permit process applies to that scope.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical work must be performed by an Idaho-licensed electrical contractor (or the homeowner on their own primary residence, per Idaho Code Section 54-1016 exemptions), permitted through Idaho DOPL rather than the City of Rathdrum
  • Installation must comply with National Electrical Code Article 625 (Electric Vehicle Power Transfer System) as adopted by Idaho under IDAPA 24.39.10.250
  • A dedicated branch circuit sized to the EVSE manufacturer's specifications is required; GFCI protection applies per NEC 625 where the EVSE is cord-and-plug connected
  • If a panel or service upgrade is needed to support the added load, that scope is also permitted through DOPL
  • No dedicated EV/EVSE fee line item is published by DOPL — the statewide 'Other Installation' fee schedule under IDAPA 24.39.10, Rule 500 applies, the same category this file's solar-pv-permit entry uses

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Idaho DOPL Electrical Permit — 'Other Installation' fee schedule (applies to EV charging station circuits since no dedicated EVSE fee line is published)Idaho Electrical Board Rules, IDAPA 24.39.10, Rule 500 (Permits and Inspections). Statewide fee schedule, since Rathdrum has no local electrical-permitting program at all. Same fee category this file's solar-pv-permit entry documents.
Wiring cost up to $10,000: $60 plus 2% of total wiring cost; $10,000-$100,000: $260 plus 1% of the amount over $10,000; over $100,000: $1,160 plus 0.5% of the amount over $100,000

Review timeline

Plan review
Not published — contact the department

How long did your EV Charging Station Permit (State-Issued Electrical Permit) permit actually take in Rathdrum?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Rough-In (if applicable)

    Required only if new circuit wiring is enclosed before final; conduit runs, wire sizing, and grounding verified (DOPL electrical inspection)

  2. 2

    Electrical Final

    EVSE circuit breaker sizing, GFCI protection (where applicable), working clearances, and charger mounting verified against NEC Article 625 (DOPL electrical inspection)

See the full Rathdrum inspection guide — scheduling & re-inspection fees →

Tips

  • Rathdrum has no local electrical-permitting program — an EV charger's electrical scope is a STATE permit through DOPL, not a city permit, the same as this file's solar-pv-permit entry.
  • A homeowner installing EVSE wiring on their own primary residence may use DOPL's Homeowner Electrical Permit Application instead of hiring a licensed contractor, subject to Idaho Code Section 54-1016. Contractor
  • If the charger install requires upgrading the electrical panel or service size, budget that as part of the same DOPL electrical permit scope — Rathdrum's Building Department, (208) 687-7242, is only involved if a new structure is also being built.
  • DOPL publishes no EVSE-specific fee line item; expect the statewide 'Other Installation' wiring-cost-based fee schedule under IDAPA 24.39.10, Rule 500.

Frequently asked questions

Rathdrum requires an ev charging station permit (state-issued electrical permit) for: Electrical work must be performed by an Idaho-licensed electrical contractor (or the homeowner on their own primary residence, per Idaho Code Section 54-1016 exemptions), permitted through Idaho DOPL rather than the City of Rathdrum; Installation must comply with National Electrical Code Article 625 (Electric Vehicle Power Transfer System) as adopted by Idaho under IDAPA 24.39.10.250; A dedicated branch circuit sized to the EVSE manufacturer's specifications is required; GFCI protection applies per NEC 625 where the EVSE is cord-and-plug connected; If a panel or service upgrade is needed to support the added load, that scope is also permitted through DOPL; No dedicated EV/EVSE fee line item is published by DOPL — the statewide 'Other Installation' fee schedule under IDAPA 24.39.10, Rule 500 applies, the same category this file's solar-pv-permit entry uses. If your project isn't listed, confirm with City of Rathdrum Community Development Department, Building Division at (208) 687-7242 (Building Department) before starting work.

In Rathdrum, the published Idaho DOPL Electrical Permit — 'Other Installation' fee schedule (applies to EV charging station circuits since no dedicated EVSE fee line is published) is: Wiring cost up to $10,000: $60 plus 2% of total wiring cost; $10,000-$100,000: $260 plus 1% of the amount over $10,000; over $100,000: $1,160 plus 0.5% of the amount over $100,000. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Rathdrum does not publish a plan-review timeline for this permit. Contact City of Rathdrum Community Development Department, Building Division at (208) 687-7242 (Building Department) for current turnaround.

You'll need: Idaho DOPL Electrical Permit Application (Contractor). Depending on your project, Rathdrum may also ask for: Idaho DOPL Homeowner Electrical Permit Application. See the required-documents checklist on this page for details on each.

Rathdrum requires 2 inspection(s) for an ev charging station permit (state-issued electrical permit), in order: Electrical Rough-In (if applicable), Electrical Final. Schedule each through City of Rathdrum Community Development Department, Building Division ((208) 687-7242 (Building Department)).

Apply through City of Rathdrum Community Development Department, Building Division at 8047 W Main Street #2, Rathdrum, ID 83858. Phone: (208) 687-7242 (Building Department), email: Not published as a single department-wide address on the Building Department page; individual staff emails are published as cloudflare-obfuscated mailto links on the Community Development staff roster (e.g., Building Official Daron Neet, Building Inspectors James Corning and Cody Moree, Community Development Services Specialist Tesarah Froyd at (208) 687-7245). Office hours: Monday through Friday, 8:00 a.m. to 5:00 p.m. (published on the Community Development contact block). Applications are submitted electronically through the BS&A Online portal (bsaonline.com/?uid=2897); the City's own checklists state no hard copy or emailed submittals are accepted.. Official information: https://www.rathdrum.gov/pview.aspx?id=773&catid=0.

Yes. The electrical connection is permitted through the State of Idaho DOPL (Rathdrum has no local electrical-permitting program), using the statewide 'Other Installation' fee schedule since DOPL does not publish a dedicated EV/EVSE fee line. No separate City permit is required unless the project also involves a panel/service upgrade or a new structure.

Yes, on their own primary residence, using DOPL's Homeowner Electrical Permit Application under the exemptions in Idaho Code Section 54-1016, in place of hiring a licensed contractor.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Rathdrum building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.