Worley building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Worley, Idaho.

Verified 2026-07-23 · Source

How to schedule

Inspections are requested through the building department below.

Address
9936 W. E Street, P.O. Box 219, Worley, ID 83876
Phone
(208) 686-1258 (City Hall, phone & fax)
Office hours
Monday 8:30 AM – 4:30 PM; Tuesday–Thursday 7:00 AM – 4:30 PM; Friday 8:30 AM – 2:00 PM (per City of Worley Contact-Us page)

Published scheduling rules

  • Inspections are scheduled with the DOPL-assigned building inspector for the Worley/Kootenai County area (per DOPL's Inspector List with Schedules) (Residential Building Permit)
  • Inspections are scheduled with the DOPL-assigned building inspector for the Worley/Kootenai County area (per DOPL's Inspector List with Schedules), the same inspector arrangement already confirmed for Worley's residential building permit (Commercial Building Permit)

Inspection sequence

Applies to: Commercial Building Permit

  1. 1

    Foundation / Footings

    Before concrete pour — forms, rebar, and footing depth verified by the DOPL-assigned building inspector

  2. 2

    Framing

    After framing and rough-in trades, before insulation or wall cover

  3. 3

    Final

    All work complete per approved 2018 IBC plans, including accessibility/egress features as applicable, ready for occupancy

Applies to: Residential Building Permit

  1. 1

    Foundation / Footings

    Before concrete pour — forms, rebar, and footing depth verified by the DOPL-assigned building inspector

  2. 2

    Framing

    After framing and rough-in trades, before insulation or wall cover

  3. 3

    Final

    All work complete per approved plans, ready for occupancy

Applies to: Solar Photovoltaic (PV) Permit

  1. 1

    DOPL Building Inspection (structural)

    Racking, roof/ground-mount attachment, and structural connections verified by the DOPL-assigned building inspector for the Worley/Kootenai County area

  2. 2

    DOPL Electrical Rough-In/Final

    All electrical work performed under a DOPL permit must be inspected by the Division of Occupational and Professional Licensing; at Final inspection the scope of work, valuation, and permit fees are verified against actual costs

Worley building permits

Get alerts for Worley

We'll email you when Worley's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.